Mar 10: Rs. 4616 crore super-critical thermal power expansion project: EPC package coming up 8Public hearing of the project has been completed by the state pollution control board 8EC of the project has been delayed due to non-compliance with air quality parameters. 8RFQ for the EPC package is likely to be floated in Q3 2023. Rs. 5860 crore greenfield pumped storage project: RFQ ahead 8TOR of the project has been granted. 8RFQ for the EIA consultant is likely to be floated in April 2023 Rs. 6614 crore off-stream closed-loop pumped storage project: TOR granted 8EIA consultant has been selected. 8RFQ for the drilling and drifting works is likely to be floated in Q2 2023 Get in touch with us for more on these project.