Sep 08: Rs. 845 crore greenfield combined cycle gas based power project: RFQ ahead 8EC has been granted by the MoEF. 8No further bid will be extended for the EPC package. 8RFQ for the BOP works is likely to be floated in Q2 2024. Get in touch with us for more on these projects