Hiring of Modular Stimulation service package on Call Out Basis for carrying out Hydraulic Fracturing, Acid treatments and Coil Tubing operations (Amendment No. 01)
Hiring of services for Installation of Indirect Heater including fabrication and hooking up of flowline manifold with the heater; Laying of 100 mm NB flowlines and 50 mm NB fuel lines to the heaters (Corrigendum 2)
Supply, installation, testing and commissioning of the various facilities in the auditorium hall (Amendment 2)
Supply of MV AIS Indoor Switchboard for PDH-PP Plant with Ethane and Propane Handling Facilities of M/s Petronet LNG Limited
Tender for Engaging OEM M/s. Hoerbiger for refurbishment of Hydrocom actuators and providing Service Assistance for Troubleshooting of Hydrocom System in MUG Compressors
Supply Installation, Testing and Commissioning SITC of VRVVRF Air Conditioning System for New Under Construction of office infrastructure for Well Service
Tender for Civil and Structural Works Including Associated Facilities for 5 SV Stations in Uran–Usar Pipeline Project
Supply, Erection & Dismantling of scaffolding for pipeline inspection/ thickness gauging and insulation in Plants
-Collection and Disposal of Surplus earth, construction debris and other non-metal debris to a place outside
Hiring of Modular Stimulation service package on Call Out Basis for carrying out Hydraulic Fracturing, Acid treatments and Coil Tubing operations (Amendment No. 01)
Hiring of services for Installation of Indirect Heater including fabrication and hooking up of flowline manifold with the heater; Laying of 100 mm NB flowlines and 50 mm NB fuel lines to the heaters (Corrigendum 2)
Supply, installation, testing and commissioning of the various facilities in the auditorium hall (Amendment 2)
Supply of MV AIS Indoor Switchboard for PDH-PP Plant with Ethane and Propane Handling Facilities of M/s Petronet LNG Limited
Tender for Engaging OEM M/s. Hoerbiger for refurbishment of Hydrocom actuators and providing Service Assistance for Troubleshooting of Hydrocom System in MUG Compressors
Supply Installation, Testing and Commissioning SITC of VRVVRF Air Conditioning System for New Under Construction of office infrastructure for Well Service
Tender for Civil and Structural Works Including Associated Facilities for 5 SV Stations in Uran–Usar Pipeline Project
Supply, Erection & Dismantling of scaffolding for pipeline inspection/ thickness gauging and insulation in Plants
-Collection and Disposal of Surplus earth, construction debris and other non-metal debris to a place outside