Sep 11: Rs. 2020 crore greenfield hydroelectric project: RFQ ahead
8The geotechnical investigation and topographical survey report have been completed.
8RFQ for the civil works package is likely to be floated in Q4 2024.
Rs. 5747 crore greenfield multipurpose project: RFQ ahead
8Civil works contractor L&T Infra. has started the construction at the site.
8RFQ for the HM works is likely to be floated in Q3 2024
Rs. 4000 crore greenfield hydroelectric project: RFQ ahead
8The bid submission date will be closed on 20th September 2023 for DPR consultant.
8RFQ for the EIA consultant works is likely to be floated in Q1 2024