Jan 03: The Terms of Reference for a 20-well onland exploratory and appraisal drilling programme is expected to be amended by Q-1, 2017 8The cost of the project is expected to be approximately Rs 8-10 crores per drilling well and approx Rs 1-2 Crores in the development of subsequent production facilities at each site. The RFQ’s are expected to be floated for the following Equipment and services: 8Seperator 8Storage tanks 8Bath heater 8Flow line system 8Flare stack 8Fire fighting system 8Oil loading platform 8Drill bit 8Flexible hoses 8Swivels 8Mud Pump 8D.G.Sets Click on Details for more