Equipment tender by February, 2017 for costal terminal project
Jan 12:
Another POL terminal is coming up with a gross storage capacity of 115,000 KL with product dispatch by road (16 bay gantry) -- The approved cost of the project is 375 crore. -- EC for the project was received on 18 April, 2016. -- Land Preparation has started. RFQ's for following equipments will be floated by Feb, 2017. 8Equipment for Civil works 8Valve 8Pipes 8Pumps 8Tanks --The project is set to be completed by April, 2018.