Equipment tender by February, 2017 for costal terminal project
Jan 12: Another POL terminal is coming up with a gross storage capacity of 115,000 KL with product dispatch by road (16 bay gantry)
 -- The approved cost of the project is 375 crore.
 -- EC for the project was received on 18 April, 2016.
 --  Land Preparation has started.
 RFQ's for following equipments will be floated by Feb, 2017.
 8Equipment for Civil works
 8Valve 
 8Pipes 
 8Pumps
 8Tanks 
 --The project is set to be completed by April, 2018.

**********************************