Maintenance work at an FCCU: Contractor needed as soon as possible
Feb 16:
Maintenance work will be started by June, 2017. It includes fabrication of upper conical portion of the secondary cyclone upto dip leg joint. Contractor will work with: 8Welding consumables 8Weld joint design 8Radiography 8DP testing scope 8Hex mesh installation 8Picking and Passivation requirement Click on Details for more