Jan 31: 8Project Name: Pipeline Expansion Project
8Project Cost: Rs 400 Crore
8Project Description: Owner along with the EPCM contractor is planning to expand an existing pipeline. They are also planning to install a new pumping station with separate booster pumps for POL & LPG along with mainline pumps. There will also be a new intermediate pumping station which will be constructed along with a separate mainline pump for the expansion. RFQ of the compressors and pumps is already out.
Major equipment required are: Main line pipes, Welding machines, Bulldozer, Shovel, Backhoes, Dozers, Scrappers, Paver, Pumps, Generators, Compressors, Jack Hammers, Pile drivers, Buried Pipelines, Isolation Valves (Manually, Remotely, Automatically Operated), Relief Valves (Thermal or other types), Pipe bridges or other supports, Cased Sleeves under roadsways or rail lines, Control Systems, Leak Detection System, Pig launcher and receivers, Motors, Transformers, Bulldozer, Dump Truck, Hydro excavator, Mechanic Truck, Pavement Saw, Forklift, Crane, Control valveFilters
8Project Event: RFQ for main-line pipes and other equipment is expected by March 2018.
8Expenditure Approval : Q1:2017
8RFQ Date : Mar/2018
8Release Date: Apr/2018
8Start Date : Q1:2018
8Completion Date : Apr/2020