Greenfield LNG terminal: FEED RFQ in September 2018
Jul 03: 8Project Name: Greenfield LNG Terminal Project 8Project Cost: Rs 1800 crore 8Project Description: The owner is planning to install an LNG Floating Storage and Regasification Unit (FSRU) with a regasification capacity of 5 MMTPA. Major equipment required are: Boil-off gas compressor, High-pressure LNG pump, Gas engine generator, Tube LNG vaporizer with air heater and submerged combustion LNG vaporizer, Pumps, Compressors, Line pipe, Jetty lines, Loading/unloading arms, Loading racks, Couplers, Strainers, Hoses, Meters, Blending equipment, Emergency shut down valve, Grounding protection, Plates, Vapor recovery system, Heating coils, mixers, Gangways, Cranes, Derricks, Davits, gantry equipments, Hoists, Foam generators, Foam monitors, PLC, SCADA, HC detectors, Level gauges. 8Project Event: RFQ for PFR Consultant is expected by July 2018. RFQ for the FEED work is expected by September 2018. 8Expenditure Approval: Q1:2018 8RFQ Date: Sep/2018 8Release Date: Oct/2018 8Start Date: Q1:2019 8Completion Date: Q3:2021 Click here for more details 8Equipment maintenance contractor needed The owner is planning to float a bid for a maintenance contract for natural gas pipeline for a tenure of five years. Click on Details for key contacts