8The website carries here the full City Gas Distribution map for Bangaluru for our readers' benefit. Click on Report for more.
8A global air quality index map shows India to be the most stricken geography in the world. We are in the "extreme risk" category as of now. Click on Report for more.
8Strong Chinese gas demand is coming from the non-power sector. In India too, this is where future demand will emerge from. Find out more click on Report.
8What is the latest sport market trend in relation to JCC price? There has been an upswing of late and the number now hovers close to 15%. Also find out more on how spot supplies and deliveries have moved in 2017 in comparison to earlier years. Click on Report for more.
8Only 15 uncommitted newbuild LNG carriers are getting delivered between 2018 - 2020.  New MEGI and XDF LNGC ships are as much as 30% more fuel efficient than existing Tri-Fuel tonnage. Know more Click on Report for more.
860.37% of the total LNG import in January, 2017 was from Qatar, 10.70% from Nigeria, 7.28% from Angola, 6.73% from Equatorial Guinea, 4.00% from Australia, 3.94% from Egypt, 3.54% from USA, and 3.44% from UAE. Click on Report for more.
8The consumption of LNG far exceeds that of domestic gas by the fertilizer industry. For LNG suppliers, the best place to get more information on this complex industry is from our sister site, www.indianfertilizer.com. Also click on Reports to know more click on Report.
8A lot of global analysts housed outside of India seems to be interested in the goings-on in Indraprastha Gas. Find out more click on Report.
8If you are an international operator, find out more on the latest changes in tax laws in countries across the world. Click on Report for more. Details
Small scale LNG solutions for inland waterway transport systems have made a lot of headway of late
8And much of these advances are now being sought to be implemented in India
The following benchmarks can now be achieved for ferries:
8Bunkering, for example, can be done directly from a tank trailer under the following conditions:
-- 40-60 m3/h bunkering flow
-- Bunkering of 10-40 m3 per bunker operation
-- Bunkering operation duration of 15 minutes
-- Zero-emission bunkering
Click on Reports for more Details
The idea of modern day inland bunkering is to create a boxed system, where the LNG is transported by semi-trailers from a terminal to the port.
8Rather than establishing a large, permanent tank at the port, companies are now creating a mobile supply chain placing the LNG storage on the road, thereby minimizing the capex for the customer.
8At the time the truck driver parks the semi-trailer at the bunkering unit, it is in fact perceived as a permanent installation.
8In locations with less volumes, the the gas supplier replaces the semi-trailer a couple of times a week, with a ferry consuming as little as consumes between 10-12 m3 per day.
8The structures are therefore highly modular and you can build as your grow.
8What is interesting is that such a plant can be fully automatic and requires no permanent staff on shore.
Click on Reports for more Details
Find out how big is can the LNG bunkering market be in India
8What is the best case estimate of number of cargo vessels (barges, bulkers, tankers and containers), passenger ferries, tugs & pushers and dredgers in India by the year 2030
8How big is the potential market for inland transport under three different "pick" up scenarios?
8Some efforts have been made to develop small sized LNG vessel carriers to cater to this market in Indian ports
8An Indian PMC is involved in the design and development of 2000 cmd carriers
8Some international companies are getting involved in designing higher capacity carriers as well
8Find out more on where this work is going on in India and which are the companies involved.
Click on Reports for more Details
What is the latest status on the "Make in India" programme for LNG vessels to ferry the product from GAIL's US commitments
8Why has it plan taken off?
8Which Indian company invested in alliances in anticipation of orders?
8Will the plan ever take off?
Click on Reports for more Details
Headline rates increased from ~$30k in July 2017 to $80k in December 2017. The ballast bonus component improved from fuel only/partial hire to full Round-Trip economics.
8But a bump is coming up ahead
8Two large projects -- Cameron LNG and Freeport LNG  -- are experiencing delays and up to 28 vessels ordered for these projects might come to market ahead of their intended project.
8Charterers are adopting various strategies to address the anticipated idle time.
8Many of the Japanese-built vessels have agreed with the shipyards to delay delivery.
8Find out more on what is ahead.
8Also go to our pricing page to get daily charter hire rates for LNG vessels
Click on Reports for more Details
There was a massive 27 MMT increase in global LNG demand in 2017
8Find out country-wise incremental demand
8Indian incremental demand has been tepid in response to not just China but a bunch of other countries too
Click on Reports for more Details
India is one of the largest markets for domestic LPG in the world and yet in the manufacture of LPG cylinders, the top three producers are from Thailand, Portugal and Turkey
8There is only one Indian company, Mauria Udyog, with a capacity of 4 million cylinders, among the top 10 producers in the world.
8The LPG cylinder market has now become global and diversified.
8The biggest manufacturer, SMPC, exports cylinders to over 100 countries
8There is huge room for growth as demand continues to gallop in select areas
8Cylinder manufacturers usually post a high utilization rate
8This is one segment where Indian players can make a big push not domestically but internationally as well
Click on Reports for more Details
The Canadian Prime Minister's trip to India has highlighted the possibility of the country tapping its vast hydrocarbon resources to export oil & gas to India.
8But Canada will need to look beyond North America’s borders to get its resources to the coast for global export.
8The country can be internationally competitive given its low production cost but without access to emerging markets, such as China and India, it will be difficult to maintain its competitiveness in the long run.
Click on Reports to find out Canada's now strenuous efforts to emerge as a big global supplier Details
8The Demand for Grants document of the petroleum ministry is an important document and the website carries here a full analysis of it for the year 2018-19
Analysis if carried here of
-- Under recoveries
-- Budget estimates under different heads
-- Comparison of prices globally and locally
-- Relationship between excise duty and prices
8Despite all the hype, as much as 67% of rural households continue to use firewood as the primary fuel
A lot of very interesting detail is thrown up in this analysis. Click on Report for more. Details
Are India’s troubled relations with its two nuclear-powered neighbours China and Pakistan heading towards a thaw?
8The question is being increasingly asked in strategic circles in New Delhi after two recent events.
8First, Indian Foreign Secretary Vijay Gokhale paid an unannounced visit to China and second India has reportedly invited Pakistan’s Commerce Minister Pervaiz Malik to an informal multilateral conference to be held in the Indian capital on March 19-20.
8There is speculation that both the events could pave the way for Indian Prime Minister Narendra Modi’s proposed visit to China for the multilateral Shanghai Cooperation Organization Summit in June this year and revive the canceled SAARC Summit in Pakistan this year-end.
Click on Reports for more Details
Business Opportunities for a dismantling contractor : RFQs in Q3 2018
8
Project Name: 
Thermal Power Station - Dismantling Project
8Project Cost: 80 crores
8Project Description: The owner is planning to retire and dismantle Units 7 and 8 (2x94 MW) out of it's 1188 MW Thermal Power Station. As of now, these two units have been under shutdown since June, 2011 due to low schedule and inability to meet the minimum environmental and emission norms. The consultant has already carried out the feasibility study. The dismantling proposal for the two units are pending with the State government, after which bids for dismantling services will be floated. Dismantling works are slated for mid 2019.
8Project Event: RFQs for dismantling services are expected by Q3 2018.
8Expenditure Approval: Q2:2016
8RFQ Date: Q3:2018
8Release Date: Q4:2018
8Start Date: Q3:2019
8Completion Date: Q4:2020
Click here for more information
Rs 9000 crore thermal power plant : RFQs for a fire protection system are expected in Q2 2018
8Project Name: Super Thermal Power Greenfield Project
8Project Cost: 9000 crores
8Project Description: The developer's 1320 MW (2x660 MW) greenfield super-critical thermal power plant is going on with contracting activities. The project is a symbol of successful cooperation between two countries. The company is the EPC contractor. Bids for switch-yard, EOT cranes have been floated. The turnkey contractor will now come out with a fire protection system package, raw water system and FGD packages soon.
8Project Event: RFQs for fire protection system package are expected by Q2 2018, instead of Q1 2018.
8Expenditure Approval: Q4:2015
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Q1:2019
8Completion Date: Q3:2023
Click here for more information
Contact Update : 
Contacts are an important tool in the hands of a business development manager  We put in great efforts to get you validated telephone numbers of departmental heads within the power industry.
8A head of project has been added to an existing facility of an NTPC-led joint venture thermal power station. 
Click on details for more information
Details
If you are an oil & gas business development manager, we provide you the widest possible coverage of petroleum projects in India. While our tender section and our highly valued analysis segment take care of your immediate needs, what we have additionally assembled here is the country's most sophisticated project monitoring software, capable of throwing up thousands of exclusive data points which, in turn, translate into hundreds of specific forward-looking leads. Our dedicated analysts will provide live support to all your queries. If you have heard a rumor, or you want to check out some facts, all you have to do is call your analyst. Many of the country's largest EPC contractors, subcontractors and equipment suppliers are our subscribers today.
These are the leads of the day:
8Project Name: Desalination Plant
8Project Cost: Rs 400 crore
8Project Description: Promoter's RFQs for the construction of a 22 MLD Sea Water Reverse Osmosis Desalination Project at its facility has been delayed. The environmental clearance for the project has been granted. CRZ clearance for the project has been awarded on Oct 2017.
8Project Event: RFQs for hiring an LSTK contractor is expected by April 2018 instead of March 2018.
8Expenditure Approval: Q1/2016
8RFQ Date: Apr/2018
8Release Date: May/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more information
8Project Name: Captive Power Plant
8Project Cost: Rs 10 crore.
8Project Description: Promoter is planning to install a gas-based captive Power Plant consisting of two 800 KW units, continuous duty, within its residential premises.RFQs for the project have been delayed on account of GST implementation and financial restructuring issues.
8Project Event: RFQ for hiring EIA consultant is expected by April instead of March 2018
RFQ's for hiring the LSTK contractor for the project is expected by May instead of April 2018.
8Expenditure Approval: Dec/2017
8RFQ Date: Apr/2018
8Release Date: May/2018 
8Start Date: Q3/2018
8Completion Date: Q2/2020
Click here for more details

8Project Name: Drilling Field Development
8Project Cost: Rs 300 crore.
8Project Description: The Promoter is planning Extension Drilling at 08 locations. The project involves both Offshore (river front) and Onshore oil and gas exploration using Extended Reach Drilling technology (ERD Wells). The drilling will be done in 08 locations and the target depth will be of 3800m each. Forest clearance and the wildlife clearance are still pending for the project. An EIA consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQs for hiring drilling services is expected by Q3 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Q3/2018
8Release Date: Q3/2018 
8Start Date: April/2019
8Completion Date: April/2021
Click here for more details
8Project Name: Brownfield Pipeline Project
8Project Cost: Rs 664 Crore
8Project Description:The promoter is planning to augment the existing product pipeline T-Point facilities. The capacity of the pipeline is 3.5 MMTPA. The total length of the pipeline is estimated to be about 745 km. At present, site surveys are going on.
8Project Event: RFQ for EPCM Contractor is to be expected by June 2018.
8Expenditure Approval: Q3:2016
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date: Oct/2018
8Completion Date: Q4:2020
Click here for more details.
8Project Name: Greenfield Pipeline Project
8Project Cost: Rs 4310 Crore
8Project Description: An existing company is constructing a greenfield 350 KM pipeline with a capacity of 8.9 MMSCMD. This pipeline will act as a feeder line to the other pipeline. RFQ for Pipeline Laying and associated works worth Rs 440 crore has already come out.
8Project Event: RFQ for mainline pipe is to be expected by August 2018.
8Expenditure Approval: Q4:2015
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date: Nov/2016
8Completion Date: Q4:2020
Click here for more details.
Details
For reference purposes the website carries here the following tenders:
8Laying and construction of steel pipeline network Details
8Supply of Coalecers and Mist Eliminators for Refinery Pressure Vessels Details
8
Supply of Rotary Air Pre-Heater Spares of Boiler of refinery Details
8Supply of Liquid Ammonia Details
8Online Sealing and Re-strengthening of Pipes and Tanks using Specialised Polymer Coating/ Wrapping at refinery Details
8Fabrication, Inspection, Testing and Supply of CS complete pressure vessels Details
8Replacement of foam pourer pipes in Crude Oil Tanks Details
8Carrying out Hydrotesting of Mainline Pipes Details
8Tender for different types of insurance cover Details
8Procurement of spares for Plate type Heat Exchangers Details
8Corrigendum: Procurement of Valves on Annual Rate Contract Basis Details
8Supply of Caustic Soda Flakes Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8U.S. to overtake Russia as top oil producer by 2019 at the latest - IEA Details
8Global fossil fuel emissions underestimated by over 50 per cent: study Details
8We plan to take gas distribution network across India: DK Sarraf, PNGRB Details
8Russia's Sistema pays 40 bln roubles under Rosneft settlement Details
8AIIB approves $1.5 bln in loans to India for infrastructure projects Details
8PNGRB grants authorization to entities for development of city gas distribution networks Details
8Can Reliance turnaround Krishna-Godavari assets with Rs 40,000-cr investment? Details
8India asks Saudi Arabia for 'reasonable' oil pricing Details
8Crude oil prices edge lower Details
8Essar best bet for Mittal local entry Details
8OPEC chief expects 2018 oil market balance Details
8India, Vietnam set to ink nuclear energy pact, boost defence ties Details
83,110 cr. project to upgrade CPCL facility Details
8India's Growth Pace for October-December Quarter could top China's Rate Details
8BPCL may sell up to 24% in Bina Refinery in Madhya Pradesh Details
You can also click on Newsclips for more   
Details
8Project Name: Refinery Greenfield Ethylene Recovery Unit Project
8Project Cost: Rs 3800 Crore
8Project Description: An existing company along with EPCM contractor and licensor is carrying out engineering activities to construct an Ethylene Recovery Unit with a capacity of 180 KTPA and Mono Ethylene Glyco Unit with a capacity of 332 KTPA at its refinery. RFQ for the equipment is already out.
8Project Event: RFQ for structural steelwork is expected by March 2018.
8Project Event: RFQ for the piping and equipment erection work is expected June 2018.
8Expenditure Approval: Q4:2016
8RFQ Date: Mar/2018
8Release Date: Apr/2018
8Start Date: Q3:2017
8Completion Date: Q3:2020
Click here for more details.
8Project Name: Greenfield LPG Bottling Plant Project
8Project Cost: Rs 120 Crore
8Project Description: An existing company along with EPC contractor is planning to set an LPG bottling plant with a capacity of 1500 MTPA by installing 3 X 500 MT mounded storage vessels. RFQ for the equipment is already out.
8Project Event: RFQ for erection and installation work is to be expected by May 2018.
8Expenditure Approval: May/2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q1:2018
8Completion Date: Q3:2019
Click here for more details.

8Project Name: LPG Bottling Plant Expansion Project
8Project Cost: Rs 32 Crore
8Project Description: An existing company is planning to expand its existing LPG bottling plant from 1000 MTPA to 2800 MTPA. Environmental Clearance is expected by April 2018. At present selection of EPC contractor is going on after that requirement of equipment will be out.
8Project Event: RFQ for equipment is expected by May 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q2:2018
8Completion Date: Q2:2019
Click here for more details.
Details
The oil & gas terminal industry in India is booming
8Private companies are making a mark
8LPG buying, storing and selling is a big business in the non-subsidized market
8The market is expected to keep growing over the next one decade
Click on Reports for more Details
Indian planners will need to take into account the possibility that in a little more than three months, the United States could withdraw from the Joint Comprehensive Plan of Action (JCPOA) with Iran.
8This will mean the return of sanctions
8Find out how exactly such a move bring about recalibration of India's relationship with Iran
8And will that influence both the size of India's crude imports from Iran and India's planned investments in the Farzad B block?
8Given that President Trump is more likely than ever to impose sanctions, the Indian private sector needs to keep options close to its chest when it comes to committing engagements in Iran
Click on Reports for a detailed analysis. Details
Despite all the hype, there are very few oil & gas companies working in the Indian E&P firmament at this point in time
8Most of them had bitter experiences and given a second change, would rather invest elsewhere.
8There are tenacious few who seem to be hanging in despite litigation, boorish conduct by regulators and financial losses.
8The website carries here the story of one such company, who had hung in for 10 years, weathering all that has been thrown at it, while still remaining ambitious about its Indian mission.
8It looks like the company is eventually getting the PSC extensions and lining up funds to embark on a multi-TCF programme
Click on Report for  more details Details
Find out more about how China's growing appetite for LNG may keep prices high not just in 2018 but also beyond.
8China has emerged as the second largest importer of LNG, replacing South Korea.
8Even though vast amounts of gas will be imported through pipelines from central Asia and Russia even as its domestic production goes up, Chinese companies are expanding their LNG import facilities at breakneck speed.
8While China's appetite is large and will continue to grow, India's isn't. Not if prices stay high
Click on Reports for more Details
Petcoke consumption registered a growth of 9.2% in January, 2018 as compared to January, 2017 and on cumulative basis, a growth of 7.6% was registered for the period April to January 2018.
8On the other hand, FO and LSHS consumption registered a growth of 4.7% during January, 2018 as compared to January, 2017 and a drop of -7.2% was recorded for the period
April to January 2018 as compared to the same period last year.
8Naphtha consumption recorded a growth of 2.0% for the month of January, 2018 and a drop of -7.7% for the period April 2017 to January 2018 as compared to April 2016 to January 2017.
8Clearly, the ban Pet Coke ban in the NCR region has not impacted its consumption elsewhere in the country. In fact, given the negative impact of the ban, the rise in consumption in January is even more conspicuous.
8The data above shows that it consumptions is staying ahead of other industrial fuels.
8One possible reason for higher petcoke consumption could be the high cost of imported LNG, which makes petcoke a relative cheaper fuel.
Click on Reports for more Details
Despite the downturn, the FPSO market seems to be holding up suprisingly well
8Find out who the key market players are in this business
8How many FPSOs are under contact, and how many are under construction
8Know more on how many are unhired
8Also get the contract schedules of the FPSO fleet belonging to the largest player in the game
Click on Reports for more Details
8POL consumption picked up speed in January, with both petrol and diesel posting high double digit growth. Get the full disaggregated picture here click on Report.
8Imports of crude oil grew as India posted another month of lackluster oil production performance. Get detailed domestic oil output and crude oil and product import export data here. Click on Report for more.
8Last week was a quiet week for the VLCC market. Find out why click on Report.
8The US is slowly but steadily bringing down its strategic crude oil reserves. What prompts such a move? Click on Report for more.
8ONGC Videsh and GeoPark announce a strategic Latin American acquisition partnership. Click on Report for more.
8Among multiple factors, find out the ones which keep energy leaders awake at night and the ones on which they are busy at work. Click on Report for more.
8A bunch of oil honchos in India are debating the future of mobility in India. Do you want to take part? Click on Report for more. 
8Here is the best projection of how US oil production will go till 2040 and what role tight role will play in it. Click on Report for more. Details
8Project Name: Oil Field Development
8Project Cost: Rs 50 crore.
8Project Description: An operator is planning development of a field awarded under NELP IX round in 2015. The project involves development drilling of 3 oil wells, development of 2 existing wells and laying of an infield pipeline to connect with the nearest ONGC production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2019. A requirement for PMC and an EIA consultant is expected from BPRL's end. Further RFQs are expected shortly.
8Project Event: RFQ for hiring PMC is expected by April instead of March 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Apr/2018
8Release Date: May/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more details
Details
Business Opportunities In Renewable Sector : Grid Connected Solar Park
8
A renewable sector company is planning to establish a grid connected solar park of capacity 250 MW under MNRE.
8Lands have been identified and acquired at required villages.
8DPR works have been completed.
8Request for Selection (RfS) bids to take place.
8The owner shall come out with technical bid and financial bid subsequently after RfS bid.
Click on details for more information
 
R&M in a Thermal Power Station : Details of RFQs coming up
8Project Name: R&M of control panels in Thermal Power Station
8Project Cost: 1 crores
8Project Description: The owner is planning to renovate and modernize its existing old control system in ESP by microprocessor based control panels in unit-2 (210 MW) of 1050 MW Thermal Power Station. The existing control panels have served more than 15 years and to optimize the ESP performance new version control panels is required. Administrative approval from TNEB is pending. The owner will come out with bids for procurement of new control panels soon.
8Project Event: RFQ for new control panels in ESP is expected to come by Q3 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q1:2019
8Completion Date: Q2:2019
Click here for more information
 
Business Opportunities for an FGD contractor : RFQs expected in Q2 2018
8Project Name: Thermal Power Station - FGD Addition Project
8Project Cost: 300 crores
8Project Description: The owner is planning the installation of a Flue Gas Desulphurization (FGD) unit at it's 630 MW (3x210 MW) unit Thermal Power Station. At present, site survey activities are ongoing for feasibility report for submission to the state government for approval. Work on the project is meant to start in 2019. RFQ for supply of FGD is expected to be out soon.
8The major requirements will be FGD, absorbers, cranes, pipes, installation, gypsum disposal, wet limestone, among others.
8Project Event: RFQ for supply of FGD is expected to be out by Q2 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Q1:2020
8Completion Date: Q2:2022
Click here for more information
   Details
8Project Name: Greenfield Crude Oil Strategic Storage
8Project Cost: Rs 5000 crore
8Project Description: Indian Strategic Petroleum Reserves Limited a subsidiary of Oil Industry Development Board has proposed to set up 4.4 MMT crude oil strategic storage facility. The project proposes to construct underground rock caverns over an estimated time frame of 64 months. A consultant has already prepared the DFR for the project. The clearance for the project is awaited from Petroleum ministry's end which is expected in a month or two. Further RFQs are expected shortly.
8Project Event: RFQs for hiring PMC contractor for the project is expected by May 2018.
8Expenditure Approval: Jan/2016
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q4/2019
8Completion Date: Sep/2025
Click here for more information for key contacts
Details
ONGC has clearly spelled out the mechanism for sharing the 5% incentive for completing projects ahead of time.
8Financial gain will be shared with the contractor in form of incentives.
8Offshore as well as onshore projects will be included.
8Contractor will be entitled up to 5% incentives. Details
8Services will be hired for a period of 03 years
8The Rigs should have a depth range of upto 7000 metres
8RFQs are expected by April 2018
Click on Details for more information and key contacts and their contact numbers
   Details
For reference purposes the website carries here the following tenders:
8EOI for Charter Hiring of 3000 HP Rig Packages Details
8Hiring of Directional Drilling Services with along with Directional Driller for a period of four years Details
8
Procurement of Consumables/ Spares of Cleaning Pigs for Cleaning/ Pigging of Pipeline Sections under JLPL Details
8Hiring of Services for Transportation of 3000 MT Propylene Details
8Bulk LPG Transportation Contract by road for the state of Chattisgarh Details
8Integrated Hazop Study of refinery through external agency Details
8Calibration and maintenance of Gas detectors installed in refinery Details
8Supply of Total Nitrogen Analyser Spares Details
8Procurement of Mass Flow Meters Details
8BUnloading and loading of catalyst in CRU Reactors, MSQ Reactor and NHT Reactor in CRU-MSQ unit in refinery Details
8Supply of Magnetic Flowmeters for BS VI Project Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Refinery news roundup: Asia-Pacific 2018 maintenance plans now emerging Details
8India: ‘Focus on investment, productivity to lead to sustainable growth rate’ Details
8Saudi Arabia eyes Indian crude market comeback, new downstream ventures Details
8LNG market needs US$ 200b investment to meet demand, says Shell Details
8RIL-BP's Rs 40,000-cr investment plan in KG-D6 approved for developing three sets of natural gas discoveries Details
8Building starts on Afghan leg of Turkmenistan gas pipeline Details
8ONGC says KG-D5 output delay due to policy changes Details
8India's December quarter GDP growth likely to be 7 per cent Details
8LNG market needs $200 bln investment to meet demand - Shell Details
8Jharkhand Govt to provide LPG connections to all poor families: Raghubar Details
8Why India needs a robust energy policy Details
8U S crude oil price extends gains to hold near three-week high Details
8Russia's Ust-Luga in talks with Rosneft on taking oil products exports from Estonia Details
8ExxonMobil shuts PNG LNG plant in wake of Papua New Guinea quake Details
8Jharkhand government to introduce cheap, safe LPG for households Details
8Bolivia reaches preliminary $2.5 billion oil, gas investment deal Details
8India to be dominant source of energy growth from 2030: BP official Details
You can also click on Newsclips for more   
Details
Signals emanating from market players are that the subsea products and services market continues to remain under severe pressure
8For ROVs, for example, days on hire are going up but shift in geographic mix and competitive pricing are still driving revenues per day lower
8Suppliers have entered 2017 with less backlog than 2017 and there is a natural backlog between customer's financial decisions and order awards.
8The market currently is still in single digit decline after double digit decline in the past
8In fact the dire prediction is that the sub sea segment will continue to face a challenging 2018 with reduced international diving and vessel activity
Click on Reports for more Details
8Is Pakistan going easy on the Iran-Pakistan pipeline and instead pushing for TAPI? Find out more click on Report.
8Peak demand moves from 2020s to 2030s? Find out how this change in projection has happened. Click on Report for more. Details
What are the latest breakeven levels of different E&P asset classes at current oil prices?
8How much incremental oil can these asset classes pump in at current prices?
8Most assets seem to be under this price range
8Only two asset classes, Angola deepwater and Canadian heavy oil, seem to be out of this price range
8How much incremental oil can these asset classes pump in at current prices?
Click on Reports for more
Details
Another independent analysis shows offshore oil fields market shrinking in 2018 over 2017
8The rate of decline however has come down
8Get a break-up of this market and how it will pan out in 2018
8The good part of the story is that offshore FIX capex will grow significantly in 2018
8A breakup of this capex into different equipment requirements is carried here
Click on Reports for more
Details
The world is entering a commodity "super cycle" and this has the potential for going on for the next 10 to 15 years
8The world is on a sustained growth path and many mega projects are in the offing (get a full list of them here)
8Emerging markets now have a voracious appetite for raw materials
Click on Reports to know more about where the demand is coming from, what kind of projects are available and how long will this "super cycle" go on 
Details
EPC companies are rediscovering themselves in the new world order of fluctuating oil prices, evolving customer demands, emerging geopolitical forces, and shrinking margins.
8However, the most important influence has been disruptive technologies, without which achieving efficiency and cost-effectiveness would have been an uphill battle.
8With the Internet of Things (IoT), augmented reality (AR), virtual reality (VR), artificial intelligence (AI), and analytics invading the traditional space, there is no choice but to pay attention and adapt.
8Some EPC companies are already accelerating their journey on the transformation roadmap.
8And among them. few have created their own roadmaps
Click on Reports for more Details
The role of the EPC company will have to exceed beyond being general contractors
8They will be required to stand out as true integrators of emerging technologies. To realize this, these companies must be integrated within their own organization and with customers, suppliers, and sub-contractors in meaningful and innovative ways.
8There will be a need to increasingly employ a NextGen workforce, with younger, less experienced, but more tech-savvy employees.
8Future organization models need to re-orient themselves to collaborate and converge current silos.
8To sum up, the Next Generation EPC companies need to re-imagine their business using an approach which will encompass
Click on Reports for more Details
An intrepid Indian entrepreneur has found a solution to get oil and gas out of "landlocked" Canada to India, he claims
8His company has elicited permissions to get a number of access routes that makes shipping energy products to India easier
8Find out what is game plan is
Click on Reports for more   Details
8Project Name: Greenfield POL Terminal Project
8Project Cost: Rs 672 Crore
8Project Description: An owner along with EPMC contractor is planning to install a greenfield POL storage terminal with a capacity of 190000 KL.
8Project Event: RFQ for the front-end engineering design development (FEED) is expected by May 2018.
8Expenditure Approval : Q1:2017
8RFQ Date : May/2018
8Release Date: Jun/2018
8Start Date : Q2:2018
8Completion Date : Q2:2021
Click here for more details
Details
There is very news coming in on what is going on with ONGC's KG-DWN-98/2 block except for some unanticipated delay. The first gas for the project which was earlier scheduled by June 2019 can now be expected by Q1 2020 or even later.
The website carries here a detailed synopsis here on
Current Status:
8Drilling :  Know more on the rigs at work. Where are they deployed? 
8Process Platform :  The platform tendering process is expected to get completed in two months (ONGC Western Offshore is going this work)
8SPS & SURF:  Who have been shortlisted and when is the technical bid evaluation and when can awards be finalized
8Odalrevu Onshore Terminal: Till when has tendering been put off
Click on Details for more Details
8Project Name: A private sector drilling site development under Discovered Small Fields Round, 2016
8Project Cost: Rs 260 crore
8No experience: The operator has no prior oil & gas exposure.
8Project Event: RFQs for hiring a consultant for EIA services is expected by March 2018.
-- RFQs for hiring workover rigs and drilling rigs is expected by May instead of March 2018.
-- RFQs for hiring other oilfield services is expected by May instead of April 2018.
8Expenditure Approval: Q2/2018
8RFQ Date: Mar/2018
8Release Date: May/2018
8Start Date: Mar/2019
8Completion Date: Dec/2021
Click here for more information
Details
8Project Name: Maintenance Dredging and Spoil Disposal
8Project Cost: Rs 150 crore.
8Project Description: The E&P operator is planning the Maintenance Dredging and Spoil Disposal for wellhead platform . The proposed project involves the dredging of 1.8 Million Cubic Meter in specific locations and disposal of dredged spoil in the offshore areas of deeper contour (30-33m).
An EIA Consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQs for hiring an EPC Contractor is expected by May 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: May/2018
8Release Date: July/2018
8Start Date: May/2019
8Completion Date: May/2020
Click here for more details, including key project parameters and contacts
Details
For reference purposes the website carries here the following tenders:
8Procurement of Valves Details
8Procurement of Tubes for Re-tubing of Exchangers Details
8
Hiring of services for conducting Energy Audit for different installations Details
8Defect Verification Contract for Direct Assessment & ILI/ Intelligent Pigging for Cauvery Basin Details
8Procurement of Displacer Level Transmitters Details
8Operation and Maintenance of DM Plant, Condensate polishing Unit and Caustic Dilution Unit at refinery Details
8Annual Rate Contract for OFC Restoration works in Mainline Details
8Procurement of Control Valve Spares at refinery Details
8Bulk LPG Transportation Contract by road for the state of Madhya Pradesh Details
8Bulk LPG Transportation Contract by road for the state of Gujarat, Daman & Diu and Dadra and Nagar Haveli Details
8Bulk LPG Transportation Contract by road for the state of Goa Details
8Bulk LPG Transportation Contract by road for the state of Maharashtra Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8EU threatens to drop Turkey summit over Cyprus gas drilling dispute Details
8Saudi oil minister hopes Opec, allies can ease output curbs in 2019 Details
8India needs to focus on investment: Citigroup Details
8Andhra signs Mous worth Rs 1.75 lakh cr, RIL to invest Rs 55,000 cr Details
8Libya Oil field halt slows exports, sending crude prices rising Details
8Saudi Aramco mulls stake in Indian refineries, is interested in west coast unit Details
8ONGC Videsh drops plan to build LNG export facility in Iran Details
8Indian equities to seek direction from macro-data, global cues next week Details
8Taliban commits to safeguard $10 billion TAPI gas pipeline project Details
8Saudi oil minister Khalid al-Falih says country interested in Indian refineries Details
8ONGC repairs pipeline, halts crude oil spill on farmland in Tamil Nadu Details
8Venezuela's Maduro says to recover 70 per cent of oil output decline Details
8More oil storages in the pipeline Details
8How green energy drive and demand for petrochemicals are making PSUs diversify their portfolio Details
8Saudi Aramco to buy stake in Indian Refineries Details
8Anadarko in talks with nine Indian firms to sell gas from Rovuma basin Details
8Crude oil steady near 2-week high as Saudi to keep export curbs Details
8ONGC Videsh Ltd drops plan to build LNG export facility in Iran Details
8Oil like gas: S&P Global Platts bags Asian LNG price benchmark Details
8Japanese firms in consortium to bring LNG to Australia's east coast Details
You can also click on Newsclips for more   
Details
8A major hydro company has started its construction activities for a 60 MW greenfield hydro plant.
8Civil works has been awarded.
8HM & E&M tenders are under scrutiny.
Click on details for more information
Details
EPC mode changed to IPP mode in a hydel plant : Get the detailed information
8
Project Name: 
Greenfield Hydroelectric Project
8Project Cost: 800 crores
8Project Description: The owner's 84 MW (2x42 MW) hydroelectric greenfield project is on hold due to delay in concurrence of DPR from CEA. The DPR has been submitted to CEA for up-gradation of the project cost. Bids for consultany services for an EIA report preparation has been floated. The project will be in Independent power producers (IPP) mode and bids for IPP services will be out only after getting concurrence from CEA.
8Project Event: RFQ for an Independent power producers (IPP) is expected by Q3 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Q3:2018
8Release Date: Q4:2018
8Start Date: Q2:2019
8Completion Date: Q1:2024
Click here for more information
Business Opportunities in a Thermal Power Plant : FGD package and electrical equipment 
8Project Name: Greenfield Thermal Power Plant
8Project Cost: 7400 crores
8Project Description: The owner's 1080 MW (4x270 MW) greenfield Thermal Power Plant is under construction and getting hampered due to heavy rains in the plant area resulting in slow movement of equipment and manpower. The company is the EPC contractor. Currently, boiler erection works are underway. Bids for fire protection system, C&I works, CHP have already been released. The EPC contractor will come out with bids for short lead electrical equipment and an FGD package soon.
8Project Event: RFQs for short lead electrical equipment and an FGD package are expected in May 2018, instead of February 2018.
8Expenditure Approval: Apr/2014
8RFQ Date: May/2018
8Release Date: Jul/2018
8Start Date: Dec/2017
8Completion Date: Nov/2024
Click here for more information Details
A greenfield 6 MMT crude oil storage capacity is coming up.
8The project proposes to set up salt leached caverns over an estimated time frame of 100 months.
8The crude oil storage will, in turn, be connected with existing nearby refineries.
8A DFR consultant is already on the job.
8Governmental clearance is awaited
8Project Event: RFQs for hiring PMC contractor for the project is expected by May 2018.
8Project Cost: Rs 4500 crore.
8RFQ Date: May/2018
8Release Date: June/2018
8 Start Date: Q4/2019
8Completion Date: Q4/2027
Click here for more, including key owner and consultant contacts with validated phone numbers along with full project details
Details
2017 performance by E&P equipment and service providers are pouring in and they continue to be dismal
8A global seismic services company says that while there is renewed interest, rates will be slower climbing up on account of massive over capacity
8Exactly the same advisory is ringing out from a very large offshore equipment and service provider who posted a lackluster 2017 performance
8There is a lag effect between revival of interest and a revival of rates
Click on Reports for more Details
A deepwater rig contact by the RIL-BP is going to have a start-date in 2019
8The contract is for a specific number of wells.
8But options are being worked into the contract that can be either by number of wells or in terms of duration.
8Given the supply side abundance, rigs are still being elicited at a reasonable rate.
Click on Reports for more details on this contact Details
After an initial fright, coal demand seems to be going through a revival of sorts
8The projection is that global coal power generation capacity is going to increase 15% by 2030 Nearly 300 GW of coal-fueled capacity is currently being built in Asia over next 5 years
8Despite what the climate lobby is saying, against the total coal-based capacity declines of 125 GW from 2017- 2030 in the developed world, fresh capacity to the tune of 439 GW gets added on in this period
8One of the world's largest producers of coal has taken in a 12% increase in global supply through 2022 into its calculations
Click on Reports for more Details
The use of gas in power generation is getting hemmed in by pressures from both direction, from coal as well as from renewable energy
8Coal is clearly a cheaper option when compared to LNG all over the world. Most coal companies have cut cost reasonably enough to be able to stand up against gas even in places where gas is cheap.
8Coal enthusiasts are now trying to cycle high-efficiency low emission coal as the way out of the emission quagmire
8The revival of coal is backed up with strong demand as of now. Import demand from India is expected to continue growing well into the foreseeable future.
8For now, the going is good for most coal companies
Click on Reports for more Details
How does India's oil & gas outlook look 20 years from now?
8India's oil output will not rise unlike what the present government wishes. In fact it is likely to decline by a quarter from current levels.
8But gas output will double.
8The renewable sector will grow to five times the current size. Renewables overtake gas and then oil by 2020 as the second largest source of energy production.
8But unlike in other places in the world, coal demand in India will up significantly in the next 20 years. Imports will go up by as much as 80% from now
8Since India's domestic oil output declines, imports will rise by 175% and account for 65% of the increase in energy imports, followed by gas (+291%).
8India will have to continue to deploy a huge amount of funds to imports to meets its requirement of oil and gas
Click on Reports for more Details
There always has to be a counter-intuitive logic to everything
8The anti-climate change adherents claim that there is a powerful lobby working hard to create a panic situation when there is no real need for it.
8This logic is worth a view, particularly from the oil & gas industry point of view
8There is another counter-intuitive logic at work: if large institutional investors do divest their stocks in "dirty fuel" companies, as is being demanded by the climate change lobby, it will be good to pick them up
Click on Reports for more Details
 1 2 3 >  Last ›

Showing 1–50 of 236 items