All content in this website is sourced legitimately

Archives


All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


May 2018

The Discovered Small Fields Round had a couple of over enthusiastic bidders who jumped in without conducting adequate due diligence.
8A subsequent real life analysis showed that they overreached while bidding for these blocks. Reserves were found to be much lower than what they had anticipated.
8In a couple of blocks, bidders have sought a revision of the contract norms from the government in the face of lower than estimated reserves.
8The government for now is unwilling to play ball.
The following are the details:

8
Project Name: Offshore Field Development
8Project Cost: Rs 450 crore.
8Project Description: The operator's RFQs for the development of the block has been delayed as the ministry is still to react to the company's plea for further concessions now that an oil field analysis revealed that the block has fewer potential reserves than was anticipated earlier. The operator claims talks are going on with the government for a viable solution. The project involves development drilling of oil wells, installation of an offshore platform and laying of a subsea pipeline. A consultant was hired for oil field analysis.
8Project Event: For now at least, RFQs for hiring an EPCM contractor is expected by August 2018 instead of June 2018.
8Expenditure Approval: Q1/2018.
8RFQ Date: Aug/2018.
8Release Date: Sep/2018.
8Date: Nov/2019
8Completion Date: Nov/2022
Click here for more details for key contacts and other details
Details
8Project Name:  Gas based Power Plant
8Project Cost: Rs 100 crore
8Project Description: An oil company's RFQ for gas-based 20 MW thermal power plant is expected soon. The project involves the addition of capacity to an existing unused 5 MW capacity turbine.
8Project Event: RFQ for hiring the consultant as well as the EPCM contractor for the project is expected by August 2018 instead of June 2018.
8Expenditure Approval: Q1/2018
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date: Q4/2018
8Completion Date: Q4/2020
Click here for more information for key contacts
Details
8Project Name: Oil Field Development
8Project Cost: Rs 100 crore
8Project Description: The Promoter is planning exploratory drilling of 03 shale gas and oil wells. Shale gas and oil exploratory drilling is a temporary activity which will continue for about 3 to 4 months for each well. The rigs are self-contained for all routine jobs. Once the drilling operations are completed, based on the evaluation of core/ cutting samples and log data collected in these assessment wells, prospective zones in the source rock shale formation will be identified for hydrofracturing and production testing. The targeted drilling depth of the well will be up to 3200m. The location is proposed to be drilled by promoter owned electrical type rig. The equipment required for the project is casing pipes, drilling pipes, cementing services, drill bits, Xmas Tree and other oilfield chemicals. An EIA consultant has been already hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the equipment and oilfield chemicals are expected by Q3/2018.
8Expenditure Approval: Q1/2016
8RFQ Date: Q3/2018
8Release Date: Q3/2018
8Start Date: Nov/2019
8Completion Date: Dec/2020
Click here for more details for project configurations and key contacts
  
Details
The operator is planning a new enhanced oil recovery technique in an onland field in Gujarat
8An additional 20 million barrels of crude
8The company wants to maximize its domestic production
8RFQs are expected to be out soon
Click on Details for more Details
The multinational has bagged a hydro fracturing job.
8Work is expected to start in August, 2018
Click on Details for more Details
8Project Name: Petrochemical Complex Expansion Project
8Project Cost: Rs 600 Crore
8Project Description: Owner is planning to do expand its petrochemical Complex
8Project Event: RFQ for the PMC contractor is expected by July 2018.
8Expenditure Approval : Q2:2017
8RFQ Date : Jul/2018
8Release Date: Aug/2018
8Start Date : Q3:2018
8Completion Date : Q2:2020
Click here for more details and key contacts.
Details
8Project Name: Thermal Power Station triennial maintenance contract
8Project Cost: 5 crores
8Project Description: Owner is preparing the bid document for the triennial maintenance job contract for boiler, turbine, air compressor and AC ventilation system of 2000 MW Thermal Power Station. The contract tenure will be of three years. Further bids are expected soon.
8Project Event: RFQs for triennial job maintenance works of of boiler, turbine, air compressor and AC ventilation system are expected in the mid May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: 15/May/2018
8Release Date: 31/May/2018
8Start Date: Q4:2018
8Completion Date: Q4:2021
Click here for more information
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 15000 crore
8Project Description: Promoter is getting delayed due to inaccessibility of the project site which is the major stumbling block in the development of a major greenfield 2500 MW hydroelectric power station. Promoter is yet to decide whether to bid out the project on an EPC mode or package wise mode. Further bids are expected after getting concurrence from the CEA.
8Project Event: RFQs for an EPC contractor or package wise bid are expected to be out in the June 2018.
8Expenditure Approval: Q3:2018
8RFQ Date: Jun/2018
8Release Date: Jun/2018
8Start Date: Q3:2019
8Completion Date: Q4:2024
Click here for more information
8Project Name: Gas Power Station Maintenance Project
8Project Cost: 12 crores
8Project Description: Owner has planned a 20-day scheduled maintenance in the 450 MW Gas Based Power Station covering major inspection of equipment which includes overhauling of auxiliary parts of the gas turbine set and compressor parts. The scope of work includes inspection and replacement of air filters, nozzles, buckets, shrouds, combustion liners, bearings of gas turbine, turbine casing, seals, among others.
8Project Event: RFQs for required equipment are expected by June 2018.
Click here for more information Details
Close to half (46%) of senior industry professionals in a global survey believe that too little has been invested in safety in recent years
8Yet less than a third (28%) will increase safety spending in 2018
8Under four-in-ten say safety management is effective and does not need to change
840% of respondents believe digital tools and technologies have already improved safety over the past three years.
8Get to know more about safety in the oil & gas industry here and why you should be concerned about it
Click on Reports for more Details
The first four months of the year constitute a sufficiently extensive period to form a comprehensive idea of how the offshore industry has been faring so far in 2018.
8A general observation would be that the overall market mood has been positive, with expectations built last year for a further improvement of the market so far met.
8Rates are still at their lowest levels, but there is optimism in the market
8During 2017, more than 25 offshore projects were approved for 2018, almost double compared to what was approved in 2016 for 2017.
8Demolition activity has intensified.
8As far as second-hand sales are concerned, we have been noticing increased appetite for AHTS units built 2000 onwards, with prospective buyers trying to take advantage of the low values, particularly those concerning distressed deals, in an effort to modernize their respective fleets by adding younger vessels and selling older units for further trading or for demolition.
8This trend together with the high demo prices of the past months have also helped scrapping activity significantly, with a substantial number of submersible rigs and offshore units – PSVs in particular – being sold for demolition and most deals agreed on an “as is-where is” basis.
8After a long time, these firms are now reporting an increased number of enquiries and tenders and are confident that all of this will reflect on rates in the months to come.
Click on Reports for more. Details
The renewable energy sector is throwing up a lot of jobs.
8Far more than in the oil & gas sector
8In India, the sector employs 4.32 lakh people
8China's renewable sector is much bigger, employing 3.88 million people
8Find out which segment of the renewable energy business offers the maximum number of jobs
8What does the future have in store?
Click on Reports  for more Details
Indian IT majors are working with LNG companies worldwide to help improve performance.
8The website carries here a test case of how one of them was able to improve margin by a substantial 7-10% using optimization processes
8It identified spot sales activities
8The IT major worked on a KPI driven optimization system for production, delivery planning, storage and berth scheduling, with interfaces to shipping and manufacturing systems.
8The clutch of Indian companies working on the receiving side of the LNG business can tap these companies to optimize their work as well
Click on Reports  for more Details
Vedanta's Barmer project is a prime example of how Indian onland assets can provide fantastic returns on investments
8The company nearly $2 billion capex in the next two to three years is based on a 20% return on investment at a Brent price of $40/bbl
8The incremental peak production from the Barmer projects is expected at 200 kboepd wherein the enhanced oil recovery (from Bhagyam, Aishwarya) is likely to be 127 kboepd, tight oil & gas projects in Rajasthan at 45 kboepd while other projects (Mangala Infill, liquid handling upgrade) are expected to contribute 28 kboepd.
8The ultimate recovery is estimated to be ~375 mmboe.
8Going forward, the management guided production volumes of 220-250 kboepd for FY19E and 275-320 kboepd for FY20E.
8A lot of free cash flow is going to be generated as a result
8It is therefore understandable that Vendanta is an aggressive bidder in the OLAP round. It is working on the fond hope that it will find a Barmer field among India's other sedimentary basins
Click on Reports  for more Details
India has to begin planning for crude oil prices to remain higher than $70/bbl through the remainder of 2018.
8Geopolitical issues -- such a further deterioration of US-Iran relationship subsequent to the reimposition of sanctions -- can cause price spikes beyond this point as well
8Prices are however going to be lower in 2019, at an estimated $65/bbl as high prices will cause non-OPEC production, particularly from the US, to go up
8So for an enterprising E&P operator, such as the one who won a block under the DSF Round, these are better times than when he won the block
8Getting discovered fields to production is easier than looking for oil under OLAP.
8So advise to them is to find the Rs 100 crore or so needed to get the FDPs going as soon as possible
8There is money to be made.
8But it is also important to ensure that you do not get carried away.
8All sensitivity analysis should allow for a positive return at $40/bbl or even less. This is tough industry to be in, and you never know what is there around the next corner.
Click on Reports  for more Details
Indian engineering colleges turn out thousands of students every year.
8And thousands of projects and papers are written every year
8Some of them are good, and great many of questionable quality
8Some of them eventually go on to get their paper published in international journals. Only a few however make it right up to the top.
8The website carries here two interesting papers published in respected journals. One that speaks of combining nano particles to enhance performance in a diesel engine and another that looks at the angle of fuel spray and how that boost performance in a direct injection diesel engine
Click on Reports  for more Details
If you are looking for an offgrid power supply solution in an E&P site, choosing the right mix of power sources is important
8A study shows that there is a world of difference between using a combination of three off-grid systems
-- Photovoltaic (PV) systems with a diesel generator
-- Photovoltaic systems and battery storage;
-- Photovoltaic systems with diesel generator and battery storage.
-- If you have such a configuration in mind, find out what will work best for you
Click on Reports  for more Details
The truck is the centre point of the entire transportation industry
8And it is this mobility entity that is the subject of much speculation in recent times
8The future truck is likely to be packed with all kinds of technology
8What kind of fuel will best suit the truck in the years ahead?
8When oil is no longer used anywhere else, will heavy duty trucks be among its few users?
These and other questions are answered in our Report today Details
Decommissioning of offshore oil and gas installations is going to become a big problem going ahead
8ONGC has built a massive infrastructure around Mumbai High but when its fields go dry, the law requires the company to decommission its assets
8RIL is likely to use a lot of the infrastructure around the D-6 block because of adjacent discoveries, nevertheless the law will require a certain amount of decommissioning when the fields are shut as planned
8That decommissioning can be a massive problem area, not just for companies but for the government too
 Click on Reports  to find out more   Details
Our project monitoring software is now fully functional. Teams of mechanical engineers are at work collecting information straight from the ground. The database is getting richer by the day, throwing up granular forward looking business opportunities data. This is proof of how dedicated work, innovation and a deep understanding of the requirements of our clients has helped us come up with a winning product
8
Project Name: Refinery Maintenance Shutdown Project
8Project Cost: Rs 20 crore
8Project Description: Owner is planning to shut down its refinery for about a month between September to October instead of July to September 2018. This is a planned maintenance shutdown along with mainstreaming of debottlenecked capacity. This shutdown got delayed because of the delay in completion of the de-bottlenecking project.
8Project Event: RFQ for the maintenance contractor is expected by June instead of May 2018.
8Expenditure Approval: Q4/2017
8RFQ Date: Jun/2018
8Release Date: July/2018
8Start Date: Sept/2018
8Completion Date: Oct/2021
Click here for more details for key contacts and requirements
8Project Name: LPG Terminal Expansion Project
8Project Cost: Rs 600 crore
8Project Description: The owner is planning to expand its LPG terminal. Environmental clearance is expected by July 2018. A slight delay in the selection of contractor due to environment clearance but now, on account of political pressures, they are planning to prioritize local contractors for some of the work.
8Project Event: RFQ for EPC contractor is expected by July instead of May 2018.
8Expenditure Approval: Q4/2017
8RFQ Date:  Jul/2018
8Release Date: Aug/2018
8Start Date: Q3/2018
8Completion Date: Q4/2019
Click here for more details

8Project Name: Refinery Greenfield Expansion Project
8Project Cost: Rs 30000 crore
8Project Description: The owner has selected a PFR consultant for expansion of  refining capacity. This project will start after the completion of the current de-bottlenecking project. Further RFQ is expected to come soon. Slight delay in selection of DFR consultant due to the delay in the de-bottlenecking project.
8Project Event: RFQ for DFR Consultant is expected by July instead of April 2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Jul/2018
8Release Date: Aug2018
8Start Date: Q4/2018
8Completion Date: Q4/2023
Click here for more details for full project configuration along with key contacts
8Project Name: Greenfield 2G Bio-Refinery
8Project Cost: Rs 700 crore
8Project Description: The owner along with PMC contractor and licensor is planning to construct an ethanol plant based on the DBT-ICT 2G Ethanol technology developed indigenously to produce 100KL fuel-grade ethanol per day, primarily from biomass. A tender for the LSTK contractor is out but a slight delay is expected in the selection due to some internal issues. The tender for equipment will be floated by LSTK contractor itself.
8Project Event: RFQ for long lead items is expected by July 2018 instead of May 2018.
8Expenditure Approval: Q1/2017
8RFQ Date: Jul/2018
8Release Date: Sep/2018
8Start Date: Q3/2018
8Completion Date: Q1/2021
Click here for more details

8Project Name: LPG Bottling Plant Greenfield Project
8Project Cost: Rs 130 crore
8Project Description: The owner has selected the EPC contractor and they are carrying out the engineering activities to install an LPG bottling plant. At present mechanical work is going on. Equipment orders have been completed.
8Project Event: RFQ for electrical and instrumentation work is expected by July 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: Q3/2017
8Completion Date: Q2/2019
Click here for more details
Details
Business opportunities for the maintenance contractors : RFQ coming ahead
8 A complete maintenance of the turbine lube oil system, seal oil system and valves of a thermal power plant is coming up.
Business Opportunities for the major Solar Power Developers : RFQs coming in Q3 2018
8A state based renewable sector company is planning to establish a solar park of capacity 20MW capacity.
8Land has been acquired for installation of solar panels.
8RFS bidding is expected to take place.
8The owner shall come out with a technical bid and a financial bid after the RfS bid.
Click on details for more information about the job requirements along with the key contact details. Details
For reference purposes the website carries here the following tenders:
8Fixing of Magnetic Marker on Pipelines for carrying out the IPS survey Details
8Cleaning of Crude Oil Storage Tanks Details
8Hiring of Well Planning, Designing & Tendering Support services for development activities in Operatorship Block, CB-ONN-2010/8 Details
8Carrying out Inline Inspection of Pipelines Details
8Providing Business coordination services Details
8In situ flange machining of heat exchanger/ cooler/ condenser flange/ pipeline and fitting flanges at refinery Details
8Procurement of Intelligent IPIG Data Analysis Software Details
8Expert Supervision, Inspection and Repair of Heat Exchangers Details
8Miscellaneous Civil And Structural Works for installation of new PLC System in TPS at refinery Details
8Forged Valves Gate and Globe for VDU-II Revamp Project at refinery Details
8Supply, Installation and Commissioning and AMC of Computed Radiography System Details
8Restoration of various well-sites/ drilling locations Details
8ARC for carrying out carrying out Refractory Repair/ Replacement Jobs at various locations Details
8Corrigendum: Procurement of Stationary and Mobile Cascades for City Gas Project Details
8Corrigendum: Hiring of vehicles for City Gas Project Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Petrol, diesel prices remain frozen for 17 straight days, Iran sanctions may intensify worries Details
8India's oil import from Iran will not be immediately impacted by US sanctions Details
8EU says committed to Iran nuclear deal, will not reimpose sanctions Details
8UK GAS-Prices rise as U.S. exits Iran nuclear deal Details
8Norway launches new licensing round in mature offshore oil and gas areas Details
8CNOOC starts first bonded LNG warehouse on southern Hainan island Details
8Refine the Energy Basket Details
8Energy at stake, India wants US to engage with Iran Details

8need2know: Oil at 3-1/2-year high, time for service champs and more macro triggers for your day on D-Street Details
8Land continues to remain a major concern for infra, energy sector in India Details
8Iran Fallout: FY19 subsidy bill could go up by 1/3 Details
8US curbs unlikely to hurt India’s oil import from Iran Details
8Vedanta may bag 40 of 55 oil and gas blocks under first OALP auction Details
8
Argentina offshore auction attracts international oil producers Details
8Oil companies see limited impact of sanctions, say high fuel prices to stabilise soon Details
8Indian refiners in no rush to seek alternatives to Iranian oil Details
8Donald Trump's call on Iran gives India energy, connectivity jitters Details
8Oil prices hit highest in years as markets adjust to looming sanctions on Iran Details
8Iran deal withdrawal, other global issues risk higher oil prices - Goldman Sachs Details
8Centre approves green licence plates for private electric vehicles Details
8US sanctions on Iran: Energy import bill to hurt India as oil prices zoom Details
8Why are petrol, diesel prices not costing you more? Here is truth Details
8No surprise! Another status quo in diesel price today, stays at record highs; check rates here Details
You can also click on Newsclips for more
Details
The oil & gas industry, there are no permanent antagonists as Deep Industries and ONGC found out when it decided to continue cooperating in a CBM block in which both are in a JV and Deep Industries is in the driver's seat.
8Pertinently, Deep Industries are recently blacklisted by ONGC for submission of false documents in a tender.
8A Deep Industry subsidiary will soon float RFQs for pipeline and equipment for a Rs 500 crore CBM development project
Here are the details:

8
Project Name: CBM Block Development
8Project Cost: Rs 500 crore.
8Project Description: The JV is planning the drilling a total of 68 wells and Deep Industries subsidiary is the strategic partner to undertake the development of the block. An overall quantity of 0.3 MMSCMD of gas has been envisaged to be produced from the project. A US firm has been selected to carry out the feasibility study for the project. The consultant for EIA services has been finalized from the company's end. The LOI for drilling rig tender which was floated earlier has not been issued till now.
8Project Event: RFQs from PEPL's end for pipeline and equipment is expected by June 2018.
8Expenditure Approval: Q1/2016.
8RFQ Date: Jun/2018.
8Release Date: Aug/2018.
8Date: Q4/2018
8Completion Date: Q3/2021
Click here for more details for key contacts and other project configuration details
Details
8Project Name:  Development Drilling Project
8Project Cost: Rs 100 crore
8Project Description: RFQs for hiring oil and gas services for for a DSF development field, are expected soon. The project involves workover of 2 existing wells and drilling of five development wells in the block. Moreover, the project will involve the laying of pipelines to connect the oil field with the nearest production facility. Currently, the project is in pre-clearance phase. The FDP for the project is has not been submitted till now. The TOR for the project has been approved.
8Project Event: RFQs for hiring consultant for EIA services are expected by June end instead of May 2018.
RFQs for hiring services for Rigs and other oilfield services are expected by July instead of March 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Jun/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q4/2020
Click here for more information for key contacts and more
Details
8Project Name: Oil Field Development
8Project Cost: Rs 400 crore
8Project Description: A private onland operator is planning development drilling of 20 wells and construction of production facilities. The operator is also planning to complete its 2 existing discovery wells through appropriate workover jobs and convert them to production wells. Although the NELP block covers two districts, the proposed wells, and production facility will be located in one only. The wells will be drilled to a depth of about 3200 meters. The production facility is planned to handle nearly 6000 BOPD oil, 6400 BLPD produced water and 1.0 MMSCFD gas. The promoter already has a tie-up with with a service provider for rigs and rig services, The project requirement will be Drill Pipes, Casing Pipes, Blow out Preventer, Drill Bits, Cementing services and Drilling fluid services. An EIA consultant has been already hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of EPC contractor for production installations is expected by Q3/2018.
RFQ for the hiring of equipment and oilfield chemicals is expected by Q3/2018.
8Expenditure Approval: Q4/2017
8RFQ Date: Q3/2018
8Release Date: Q3/2018
8Start Date: April/2020
8Completion Date: April/2022
Click here for more details
Details
A new CBM block is going to be developed
8The promoter is planning to start drilling by the end of this year
8The Block has been awarded in the CBM IV round of bidding
8The operator is planning to complete 25 core holes and drilling of three test wells.
8So business development opportunities are coming up
Click on Details for more
Details
Regulations provide a undue advantage to Indian companies under the "Make in India" programe
8But here is a supply opportunity only for the international community
Click on Details for more
   Details
8Project Name: Maintenance of BoP and WTP in Thermal Power Station
8Project Cost: 6 crores
8Project Description: Owner is finalizing the bid document for a maintenance (running and breakdown) of balance of plant and water treatment plant of a 2000 MW thermal power plant. Further bid are expected soon.
8Project Event: RFQs for a triennial maintenance of BoP and water treatment plant are expected by the mid May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: 15/May/2018
8Release Date: 31/May/2018
8Start Date: Oct/2018
8Completion Date: Oct/2021
Click here for more information
8Project Name: Greenfield Pumped Storage Project
8Project Cost: 6000 crore
8Project Description: Promoter along with a PFR consultant is planning to construct a 2500 MW pumped storage hydro power station. Owner is expected to come out with a bid for a consultant for the preparation of the detailed project report.
8Project Event: RFQs of a consultant for preparation of the detailed project report are expected by Q3 2018.
8Expenditure Approval: Q4:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: 2020
8Completion Date: 2025
Click here for more information
8Project Name: Thermal Power Maintenance Project (Unit-2)
8Project Cost: 12 crores
8Project Description: Owner has planned a 35-day scheduled boiler overhaul in the 2500 MW thermal power station. The mandatory job includes cleaning of boiler, water tubes, boiler drum, dearator, checking and replacement of pressure parts of boiler, inspection of wind box supports and its expansion joints, replacement of the journal bearing and thrust bearing of low pressure turbine, replacement of pipes, among others.
8Project Event: RFQ for equipment required is expected by the end of May 2018.
Click here for more information Details
Use of decarbonized gas and transforming it to hydrogen is the new buzzword these days but the technology is still to be scaled up beyond pilot projects.
8The accompanying need for storage of carbon dioxide seems to still be a problem but a strong line of argument is emerging to claim that it will cheaper than using electricity in some segments of the industry.
8The existing pipeline network can carry the hydrogen around, it is argued
8Will the manufacture of hydrogen using the electrolysis process from renewable energy eventually win the decarbonization battle eventually?
Click on Reports to know more where the decarbonization battle is headed now Details
Forthcoming state elections and a pointed attack by former Prime Minister Manmohan Singh, who claimed that instead of passing on the benefits of low prices to the people, the Modi government has instead punished them, may permanently stymie the daily adjustment of fuel prices until the next general elections.
8Marketing margins of oil marketing companies have already turned negative and share prices have corrected
8But the worse is yet to come. When the LPG and kerosene subsidy budgets wear off, the OMCs are likely to end up bearing the burden
8Will upstream companies be spared? They will be, for the time being, it seems.
8Spinoff effects are likely on private sector fuel outlets too because sales will fall as OMCs will be forced to sell diesel and petrol at lower prices. This goes to show that private sector retail in India is a zero sum game.
Click on Reports for a full analysis
   Details
A new-tech global Enhanced Oil Recovery player has made a maiden entry into India
8It has grabbed a 10-well stimulation programme
8An acid stimulation technology will be utilized
Click on Reports for more Details
Business opportunities for the maintenance contractors : RFQ coming ahead
8 A complete maintenance of the coal handling plant area of a thermal power plant is upcoming.
Business Opportunities for the major Solar Power Developers : RFQs coming in Q4 2018 
8A state based renewable sector company is planning to establish a solar park of 300 MW capacity.
8Solar panels will be installed in the acquired premises of a greenfield hydro plant.
8RFS bidding is expected to take place by Q4 2018
8The owner shall come out with a technical bid and a financial bid after the RfS bid.
Click on details for more information about the job requirements along with the key contact details. Details
For reference purposes the website carries here the following tenders:
8Procurement of non-invasive clamp-on type Ultrasonic Flow Meters Details
8Hiring the Services of day to day Support Services to Mechanical Maintenance Section Details
8Hiring of Services for Engineering and Commissioning of Water Treatment Facility Details
8Carrying out Refractory Repair supervision Details
8Servicing and Reconditioning of different valves Details
8Carrying out Catalyst Scooping Job during DHDT M and I Shutdown Details
8Maintenance of Liquid Nitrogen Storage Vessels Details
8Providing Consultancy Services in Special Level TPM Activity at refinery Details
8Catalyst Skimming/ Replacement in the reactor at NHDT Unit of refinery Details
8Provision of Project Car at LPG Import Terminal Project Details
8Supply of Globe Valves Details
8Supply of Measuring Tools as per technical specification at refinery Details
8Supply of DI package for CNG Plus oil Details
8Supply of Drilling Detergent Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8India to launch ninth round of bidding for City Gas Distribution today Details
8India opens biggest city gas licensing round Details
8Jobs in global renewable energy sector grew 5.3 per cent to 10.3 million in 2017 Details
8EU regulators to rule on Fortum bid for Uniper by June 15 Details
8Poland cuts dependence on Russian crude oil but at a cost -report Details
8India slips to 6th spot in biz optimism index; sentiment weakest since 2014: Thornton Details
8Increase in global fuel prices not supported by market fundamentals, will pass on the increase soon: IOC chief Details
8IOC says oil PSUs froze fuel prices to avoid consumer pain Details

8Argentina strikes deal with oil companies to freeze fuel prices till June Details
8Half of India will have access to piped natural gas for cooking: Pradhan Details
8Oil prices push higher after U.S. walks away from Iran nuclear deal Details
8Rouhani to discuss Trump nuclear deal decision with Europe, Russia, China Details
8Delhi govt to rope in private players to run e-buses Details
8
CFO optimism on business environment at 4-year low: D&B survey Details
8Trump to allow year-round sales of high-ethanol gas Details
8PNGRB appoints CRISIL for framing gas trading hub regulations Details
8Saudi Arabia ready to `Mitigate' impact of Iran oil sanctions Details
8Oil gains as Iran crude buyers get U.S. ultimatum to cut imports Details
8Business sentiment in India weakest since 2014: Report Details
8Govt claims LPG prices have fallen by Rs 100 in May Details
85 ways India could be affected by U.S. decision to pull out of Iran nuclear deal Details
8OMCs under pressure as Trump dumps Iran nuclear deal; HPCL falls 5% Details
8How the biggest oil buyers like India tackled US sanctions on Iran before Details
8As rupee depreciates, here is how it may well hit the economy, hurt the consumer Details
8No change in diesel price in India today either: Rates stay at record highs as daily revision not happening; check rates here Details
You can also click on Newsclips for more
Details
Sulphuric Acid and Captive Power Unit Expansion Project      
8Cost - Rs 300 Crore
8Project Event: The RFQ for EPC contractor is now likely to be released in September 2018
Click here for more information
Single/Triple Super Phosphate Greenfield Project       
8Cost - Rs 30 Crore
8Project Event: Detail Project Report preparation is going on and proposal for an environmental clearance is likely to be submitted in June 2018. Tender for an EPC contractor is likely to be released in July 2018.
Click here for more information
Phosphoric Acid Greenfield Project   
8Cost - Rs 10 Crore
8Project Event: Tender for an EPC contractor is likely to be released in July 2018.
Click here for more information
Details
An experienced private operator is planning early monetization of an oilfield awarded in the DSF round
8The company wants to integrate the oilfield with a nearby operating field
8RFQs are expected to be out by Q4:2018
Click on Details for more Details
8Project Name:  Development Drilling Project
8Project Cost: Rs 100 crore
8Project Description: RFQs for hiring oil and gas services for a development field in Andhra Pradesh, are expected soon. The block was awarded to the company under the discovered small field round in 2016. The project involves workover of 2 temporarily abandoned wells and development drilling 5 wells spread over an area of 15.10 sq. km. Moreover, the project also involves laying of pipelines for connecting the oil field with ONGC's nearest production facility. The FDP for the block has not been submitted till now. Currently, the project is in pre-clearance phase. The TOR for the project has been granted now.
8Project Event: RFQ for hiring a consultant for EIA services is expected by June end instead of May end 2018.
RFQ for hiring rig and other oilfield services is expected by June now.
8Expenditure Approval: Q2/2017
8RFQ Date: Jun/2018
8Release Date: Aug/2018
8Start Date: Q3/2018
8Completion Date: Q4/2019
Click here for more information and key contacts
Details
8Project Name: Development Drilling Project
8Project Cost: Rs 500 crore.
8Project Description: The operator's RFQs for hiring civil contractor and equipment for a multi-well development drilling programme  are expected soon. The project is listed out as an expansion project for the already existing development drilling project. Two drilling rigs are expected to be procured. One rig contract has been already signed in. RFQs for all well consumables and production equipment namely X-Mas tree, Tubing Head Spool, Hanger Flange / Tubing Hangers, Separators with all accessories, Steam Jacket, Ground X-Mas tree, Tubing Pipes for surface fittings and flare line etc are expected shortly.
8Project Event: RFQs for hiring the civil contractor for construction works are expected by June end 2018 instead of May 2018.
 RFQ for equipment is expected by June 2018 instead of March 2018.
8Expenditure Approval: Feb/2016.
8RFQ Date: Jun/2018.
8Release Date: Aug/2018.
8Date: Oct/2018
8Completion Date: Q2/2021
Click here for more details for key contacts
Details
8Project Name: Oil Field Development
8Project Cost: Rs 100 crore
8Project Description: Operator is planning to drill 02 exploratory wells in Upper Assam. Environmental clearances are being sought. The equipment required for the project will be Drill Pipes, Casing Pipes, Xmas Trees, Cementing services and Drilling fluid services. An EIA consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of equipment and oilfield chemicals is expected by Q4/2018.
8Expenditure Approval: Q2/2016
8RFQ Date: Q4/2018
8Release Date: Q4/2018
8Start Date: May/2020
8Completion Date: May/2021
Click here for more details for key contacts
Details
8Project Name: Multi Product Terminal Expansion Project
8Project Cost: Rs 1000 crore
8Project Description: The owner is planning to do the expansion in its existing Multi Product Terminal. An EIA consultant has been appointed
8Project Event: RFQ for the EPC contractor is expected by July 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q3/2021
Click here for more details for key contacts
Details
8Project Name: Greenfield 2G Bio Ethanol Refinery Project
8Project Cost: Rs 700 crore
8Project Description: The owner is planning to construct an ethanol plant indigenously to produce 66 KL fuel-grade ethanol per day, primarily from biomass, and it will use approximately 240 tons of biomass per day.
8Project Event: RFQ for the technology licensor is expected by July 2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q3/2021
Click here for more details for project configuration and key contacts
Details
8Project Name: Greenfield 2G Bio Ethanol Refinery
8Project Cost: Rs 600 crore
8Project Description: Owner has hired a PMC contractor to construct an ethanol plant based on the DBT-ICT 2G Ethanol technology to produce 100 KL fuel-grade ethanol per day, primarily from biomass and will use approximately 1 MTPD of biomass per day. RFQ for the DFR consultant is already out. A slight delay in the selection of technology licensor.
8Project Event: RFQ for the licensor selection is expected by July instead of June 2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q4/2021
Click here for more details and you will be taken to our project monitoring software Details
8Project Name:Greenfield FSRU LNG Terminal Project
8Project Cost: Rs 300 crore
8Project Description: Promoter is planning to construct a floating, Storage and Regasification Unit with a capacity of 2 MMTPA
8Project Event: RFQ for PMC Contractor to be expected by July 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q4/2020
Click here for more details

Business Opportunity for PLC maintenance Contractor
8Owner is planning to float a bid for a maintenance contract for a PLC for a duration of three years in its refinery.
Click on Details for key contacts
Details
8Project Name: Greenfield Super Thermal Power Station
8Project Cost: 15000 crores
8Project Description: Owner is ongoing with the fencing activities for possession of the land for a 1980 MW greenfield super-critical thermal power plant. The project is getting delayed due to hostile protests of the villagers. Owner has confirmed to come in package wise mode.
8Project Event: RFQs for BTG supply and allied civil works are expected in June 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Jun/2018
8Release Date: Jun/2018
8Start Date: Q3:2019
8Completion Date: Q3:2023
Click here for more information
8Project Name: Annual Maintenance Project of Thermal Power Station
8Project Cost: 20 crore
8Project Description: Promoter is preparing specifications of NIT document for a scheduled maintenance of 40 days in the 1500 MW thermal power plant. The owner will come out with bids for critical spare parts for the condenser soon.
8Project Event: RFQs for short lead spare parts of the condenser are expected by June 2018. 
Click here for more information
Business opportunities for the maintenance contractors : RFQ coming ahead
8 A complete maintenance of the crusher house at the coal handling plant of a thermal power plant. 
Click on details for more information about the job requirements along with the key contact details.
Details
8Project Name: Refinery Brownfield Expansion 
8Project Cost: Rs 4000 crore
8Project Description: Owner along with PMC-cum-EPCM contractor is carrying out engineering activities to expand the capacity of refinery. At present, civil work is going on. Equipment orders have already been placed. There is a slight delay in electrical and instrumentation work.
8Project Event: RFQ for utilities and Offsite work is expected by June 2018.
RFQ for electrical and instrumentation work is expected by July instead of May 2018.
8Expenditure Approval : Q4:2016
8RFQ Date : Jun/2018
8Release Date: Jul/2018
8Start Date : Jan/2017
8Completion Date : May/2019
Click here for more details for full project configuration and key contacts.

8Business Opportunity for The Equipment Maintenance Contractor
8The refinery owner is planning to float a bid for long term contract involving the inspection and furnishing of refractory repair and heater in CDU, VDU and FCCU of the refinery at the time of maintenance.
Click on Details for key contacts
Details
Ammonia - Urea & Captive Power Plant Greenfield Project  
8Cost - Rs 10,000 Crore
8Project Event: Discussion process for EPC contractor is going on and RFQ for EPC contractor is likely to be released at the end of May 2018 or first week of June 2018.
Click here for more information
DAP/NPK- Phosphoric Acid & Sulphuric Acid Greenfield Project      
8Cost - Rs 2000 Crore
8Project Event: The paperwork is ongoing, RFQ for EPC is likely to be released in August 2018.
Click here for more information

Ammonia-Urea & Captive Power Unit Greenfield Project       
8Cost - Rs 7000 Crore
8Project Event: The public hearing for the environmental clearance has not started yet and RFQ for Project Management Consultant is likely to be released in August 2018.
Click here for more information

Ammonium Nitrate Greenfield Project  
8Cost - Rs 1750 Crore
8Project Event: The environmental clearance is likely to be elicited in June 2018, RFQ for the EPC contractor is likely to be released in July 2018.
Click here for more information
 Single/Triple Super Phosphate Greenfield Project
     
8Cost - Rs 25 Crore
8Project Event: The company has applied for a loan and approval is pending, RFQ for the contractor is likely to be released in August 2018.
Click here for more information
Details
Anadarko, the lead promoter of the Mozambique LNG project in which the India trio of ONGC, OIL and BPCL are heavily invested, has claimed that it has tied up all its gas for the $20 billion 12 MMPA plant
8But firm sales agreements are yet to be put together
8Then again, it now seems like a factor external to the project is at work that may impede further progress for now.
Click on Details for more Details
8Project Name: Offshore Field Development
8Project Cost: Rs 1300 crore.
8Project Description: RFQs for hiring Floating Production Storage and Offloading (FPSO) for an offshore development is expected soon. An EPC contractor for platform installation has already been hired.
8Project Event: RFQs for hiring a FPSO are expected by July 2018.
8Expenditure Approval: Feb/2017.
8RFQ Date: July/2018.
8Release Date: Oct/2018.
8Date: Q4/2020
8Completion Date: Q4/2030
Click here for more details for project details and key contacts
Details
8Project Name:  Mining Lease Block Development
8Project Description: RFQs for more rigs developmental drilling of 3 wells and further drilling programme in surrounding areas is expected soon. The project has been listed out as an expansion project in the already existing 30 well development drilling programme going on at the existing facility. More than one rig is expected to be hired as drilling will extend beyond 3 wells to other wells as well. One LOI for a drilling rig was issued last year. However, more RFQs for more rigs are expected soon. Furthermore, RFQs for the following equipment -- Coupling, Xmas Tree, Tanking Facilities, Safety Valves etc -- are expected shortly.
8Project Event: RFQs for hiring rigs is expected by June end 2018.
RFQs for hiring equipment, wireline and cementing services is expected by May 2018.
8Expenditure Approval: Q1/2017
8RFQ Date: May/2018
8Release Date: Aug/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more information
Details
8Project Name: Oil Field Development
8Project Cost: Rs 100 crore
8Project Description: RFQs for hiring oil and gas services for yet another Discovered Round field are expected. The company has applied for the TOR of the block. The owner had grabbed three blocks under the in the small fields bid round 2016. An EOI is also expected for various drilling and oilfield services. Frst gas from the block is scheduled by Q3 2019.
8Project Event: RFQ for EOI for various oil and gas services is expected by June 2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Jun/2018
8Release Date: Sep/2018
8Start Date: Q1/2019
8Completion Date: Dec/2021
Click here for more details for key contacts and other details
Details
8Project Name: Refinery Greenfield Captive Power Project
8Project Cost: Rs 900 crore
8Project Description: The LSTK contractor is likely to float bids for civil works and transportation services for a 75 MW captive power plant. Bid for civil work and allied transportation services was delayed due to delay in survey work. Further bids are expected soon.
8Project Event: RFQ for civil works and related transportation activities along with short lead equipment for gas turbine is expected by June instead of May 2018.
8Expenditure Approval : Q4:2016
8RFQ Date : Jun/2018
8Release Date: Jul/2018
8Start Date : Q4:2018
8Completion Date : Q4:2020
Click here for more details for full details
Details
For reference purposes the website carries here the following tenders:
8Providing services for maintaining, running and up-keepment of Mobile Oil Spill Recovery Unit Details
8Carrying out Third Party Audit at refinery Details
8Servicing of Rotork Make Actuators at refinery Details
8Supply of spares for Gas Detector installed in Gas Turbine at refinery Details
8Supply and operation of hydraulic mobile cranes and operation of heavy equipments at refinery Details
8Carrying out Marine survey work at Kakinada terminal Details
8Carrying out Quantitative Risk Analysis & Hazard and Operability study Details
8Supply of Catalyst Isolation Valves for BS-IV Projects Details
8AMC for Civil Works for a period of two years Details
8Procurement of Shell Assembly for Dryer Regeneration Gas Heater of ECU Details
8IRC for Operation and Maintenance of Fire and Safety activities of Pipeline Details
8Supply of Crossovers for its operations in KG Basin Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Oil's surge to $70 per barrel turns rupee into worst-carry trade in Asia Details
8ONGC clocks 6.3% rise in gas production Details
8Oil prices reach highest since Nov 2014 on Venezuela, Iran worries Details
8Ambani's EWPL seeks tripling of KG gas transportation tariff Details
8Saudi energy minister says concerned about tight spare oil capacity Details
8Cyprus-Egypt natural gas pipeline to cost $800 million-$1 billion Details
8Global crude oil prices fall as market awaits Trump decision on Iran Details
8ETP to complete Rover natural gas pipe in Q2 after order lifted Details

8Cyprus, Israel seek gas-sharing formula to unlock East Med energy hub Details
8OPINION: Abjure panic and populism on fuels Details
8Shell trading arm protests proposed program for Marketlink oil pipeline Details
8Iran says new sanctions by US would not stifle its oil industry Details
8Sudan in talks with Saudi Arabia on five-year oil aid agreement Details
8
Siemens plans Power & Gas shutdowns due to power weakness Details
8India scraps plan to privatise oilfields following opposition from companies Details
8Petrol prices in India remain unchanged for 2-weeks today; Brent crude over $70-mark Details
8UN experts fear Polish clampdown on dissent at climate talks Details
8Essar denies any links with NuPower, DH Renewables Details
8Saudi Arabia to supply Sudan with Oil amid Fuel Crisis Details
8Oil politics: By freezing fuel prices, govt is undermining its own policy Details
8Global oil slump has Gujarat’s Alang angle: An influx of rigs Details
8Fuel prices unchanged for 10 days, Pune commuters breathe easy Details
8Rupee plunges to 67 per dollar as crude oil spikes; Sensex at 3-month high Details
8Centre denying benefits of low oil prices to consumers: Manmohan Singh Details

You can also click on Newsclips for more
Details
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 1500 crores
8Project Description: Promoter has submitted the detailed project report to the CEA for techno-economic clearance for a 150 MW greenfield hydro power station. A bid for civil works is expected soon.
8Project Event: RFQ for civil works is expected to be out in the Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q1:2020
8Completion Date: Q2:2025
Click here for more information
8Project Name: Boiler R&M in Thermal Power Station
8Project Cost: 200 crore
8Project Description: Owner plans to carry out boiler renovation and modernisation (R&M) in the 3000 MW thermal power station. Bid for an R&M package is expected to come out soon.
8Project Event: RFQs for boiler R&M package is expected to come out by the mid May 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: 15/May/2018
8Release Date: 20/May/2018
8Start Date: Q3:2018
8Completion Date: Q2:2019
Click here for more information
8Project Name: Thermal Power Station Maintenance Project 
8Project Cost: 20 crores
8Project Description: A JV company has planned a 25-days boiler scheduled annual maintenance in the 800 MW thermal power station. The mandatory job includes servicing of burner system, overhauling of ID, FD and scanner air fans, replacement of seals, support bearings, casing, valves, overhauling of boiler pressure parts, servicing of soot blowers, replacement of boiler tube, repair of coal nozzle, repair of ducts and dampers, servicing of boiler fill pump, among others.
8Project Event: RFQs for required equipment are expected by June 2018.
Click here for more information Details
‹ First  < 4 5 6 7 8 > 

Showing 251–300 of 363 items