Business opportunities for the equipment suppliers : RFQs coming ahead
8Supply of an equipment is upcoming in a thermal power plant.
Click on details for more information about the requirements along with the key contact details.
Old Units getting shut : New technologies overrunning the market
8Two units of a thermal power station are under outage.
Click on details to know the reason and the new opportunities upcoming.
Details
8Project Name: Ratnagiri Refinery Greenfield Project
8Project Cost: Rs 200000 crore
8Project Description: Indian Oil Corporation Limited (IOCL) is planning to construct a mega refinery in a joint venture of HPCL and BPCL with a capacity of 60 MMTPA at Konkan (Maharashtra). EIL has been hired as a consultant for preparing all documentation works. There is a slight delay in the land accusation process for the refinery as of now. A slight delay in the selection of PMC contractor.
8Project Event: RFQ for the FEED work is expected by Q3, 2018.
8Expenditure Approval: Q1/2017
8RFQ Date: Q4/2018
8Release Date: Q4/2018
8Start Date: Q1:2019
8Completion Date: Jul/2023
Click here for more details and key contacts

8Business Opportunity for a Maintenance Contractor
8Owner is planning to float a bid for overhauling and testing of Control valves and Shutdown valves at the time of its maintenance shutdown in its refinery
Click on Details for key maintenance contacts
Details
8Project Name: Greenfield Pipeline Project
8Project Cost: Rs 120 crore
8Project Description: The owner is planning to lay a petroleum product pipeline
8Project Event: RFQ for EPCM contractor is expected by August 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date: Q1:2019
8Completion Date: Q3:2021
Click here for more details

8Project Name: Greenfield Pipeline Project
8Project Cost: Rs 100 crore
8Project Description: The owner is planning to lay a new Lube oil pipeline.
8Project Event: RFQ for EPC contractor is expected by August 2018.
8Expenditure Approval: Q4/2017
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date: Q1:2019
8Completion Date: Q4:2021
Click here for more details
Details
8Project Name: Refinery Expansion Project
8Project Cost: Rs 25000 crore
8Project Description: The owner is expanding its refinery and also setting up a PP (Polypropylene) unit. Capital approval process is currently on
8Project Event: RFQ for DFR consultant is expected by July 2018.
8Expenditure Approval: 2018
8RFQ Date: Jul/2018
8Release Date: Aug/2018
8Start Date: 2019
8Completion Date: 2024
Click here for more details
Details
8Project Name: Oil Field Development 
8Project Cost: Rs 600 crore
8Project Description: The Promoter is planning Development drilling of 17 wells. The EIA consultant for the project has not been hired and is expected soon. The equipment required for this project includes Drilling Rigs, Drilling Pipes, Casing Pipes, Drill Bits, Directional Drilling services, Cementing services and Mud engineering services. Further RFQs are expected shortly.
8Project Event: 
-- RFQ for the hiring of an EIA consultant is expected by Aug:2018.
-- RFQ for the hiring of Drilling services is expected by Q4:2018.
-- RFQ for the hiring of equipment and oilfield chemicals is expected by Q4:2018. 
8Expenditure Approval: Q4/2017
8RFQ Date: Q4/2018
8Release Date: Q4/2018
8Start Date: Feb/2020
8Completion Date: Dec/2022
Click here for more details and key contacts
Details
8In some parts of the US, the gas price can go to zero. Find out why? Click on Report  for more.
8Given the likely decline in GRM, increase in capex over the next five years, rise in interest costs and concerns over product pricing freedom, HPCL's upside in earnings may get capped. Click on Report  for more.
8Post the commissioning of the Kochi-Mangalore-Bangalore pipeline, the Kochi LNG terminal the utilization levels could go up by 35-40% from the current 9%. Click on Report  for more.
8Get an insurance technical review of upstream oil & gas cyber risk. Click on Report  for more.
8A global map shows that there are no floating regasification projects coming up in India as of now. But there are projects in Pakistan and Bangladesh however. Click on Report  for more.
8When is the next US recession coming? Click on Report  for more.
8Subsequent to a blacklisting by its largest customer and trouble over insider trading, Deep Industries is now restructuring to adjust to changed realities. Click on Report  for more.
8Get a break-up of how much new LNG projects are going to cost in Canada. What is the FOB price going to be? Will Canadian LNG make a mark in the global stage? Click on Report  for more.
8Get the latest buy-sell data on crude and product tankers globally. Click on Report  for more.
8CNG prices are at 39-45% discount to diesel and petrol respectively in Delhi. That is a big margin by any yardstick. How is IGL gaining out of this differential? Click on Report  for more. Details
Global price reporting agencies have created LNG price benchmarks for India.
8But the absence of any actual physical trades in LNG, the assessments largely reflect bids and offers or mere “market chatter” by the various market participants.
8Is a better price discovery process available?
8Experts may have to look at the oil instead of the gas market for inspiration
Click on Reports  for more Details
Does India have the wherewithal to develop a competitive gas market?
8The answer is a straight "no".
The basic requirements for such a market have been identified as:
--
A hands-off government approach to natural gas markets
-- Separation of transport and commercial activities
-- Wholesale price deregulation
-- Sufficient network capacity
-- Nondiscriminatory access to networks
-- A competitive number of market participants and involvement of financial institutions.
None of these ingredients are in sight as of the moment
Click on Reports  for more Details
LNG spot prices have seen a large amount of volatility
8But kind of slope are they maintaining to the JCC?
8After the slope flared up rapidly earlier in the year, it has come down dramatically now
8Clearly hub-based LNG is helping keep the slope down
Click on Reports  for more Details
There is now increasing global attention towards producing hydrogen, ammonia and methanol from renewable energy
8Comparative cost curves are now floating around, indicating that people are indeed looking at the possibility of a switch to making these products without using fossil fuels at some point in the future.
8Does the introduction of carbon taxes swing the cost-economics of using the renewable power route to chemicals into the favourable range?
8Will abundantly available offshore power push the transition or will it be cheap renewable power in the Middle East and Africa that will trigger the change?
8Renewable energy is cheap in India too. So Indian companies need to keep a watch on these cost curves and new emerging technologies.
8You never what is in store
8What is for sure is that chemicals and petrochemicals will be perpetually in demand, what can perhaps change is how you make them.
Click on Reports  for more Details
There is now a consensus that there is a slow recovery in the jackup and floater market beginning from now
8The consensus outlook suggests around 500-550 working rigs over the next 5 years as against 114 floaters and 289 jackups as of  now
8In this context, how is the OSV market looking like? Get the latest data as of May 2018 on OSV working rigs, OSV global population and the OSV to working rig ratio here
8Figure out what it will take to achieve market equilibrium in the OSV market
8Get the projections on OSV demand, divided in terms of rig and production support.
8The adjusted utilization rate is in fact higher than what was anticipated
8The market can move up rapidly from here on, by these set of projections
Click on Reports  for more Details
GAIL has been under performing of late.
8The higher cost of gas of late has trimmed the company's ability to charge high marketing margin rates.
8Realizations on its petrochemical sales is down
8The gas major has somehow placed its US LNG commitments for 2018 through various short term contracts.
8But there is serious concern whether it can profitability do these contracts in light of the fact that it has long term offtake commitments of expensive LNG
Click on Reports  for more
   Details
8Project Name: Offshore Platform Trunkline Modification
8Project Cost: Rs 250 crore
8Project Description: The Promoter is planning modification in its existing Offshore Platform Trunkline having an overall length of 230 km. The promoter had invited an EOI for providing consultancy services for protection measures for gas pipelines. The EOI seems to have attracted a lot of parties with nearly 6 parties interested in the job. The gas pipeline supplies gas from offshore process platforms to an Onshore terminal.
8Project Event: RFQs for hiring an EPC contractor for pipelines is expected by Q4 2018.  
8Expenditure Approval: Q3/2018
8RFQ Date: Q4/2018
8Release Date: Q4/2018
8Start Date: Q1/2019
8Completion Date: Q4/2019
Click here for more details
Details
8Project Name: Maintenance Dredging & Spoil Disposal Project  
8Project Cost: Rs 350 crore
8Project Description: The promoter's RFQs for hiring an EPC contractor for Maintenance Dredging and Spoil Disposal are out for (Offshore) wellhead platform. The proposed project involves the Dredging of 1.8 Million Cubic Meter in specific locations and disposal of dredged spoil in the offshore areas of deeper contour (30-33m). The TOR for the project was not granted in last EC meeting and is expected by June. An EIA Consultant has already been hired for the project. For rig mobilization service,s the RFQs will be out once the EPC contractor for dredging services is finalized.
8Project Event: RFQs for Rig Mobilization services (Rig-down, Relocation & Rig-up) is expected by September instead of July 2018.  
8Expenditure Approval: Q4/2017
8RFQ Date: Sep/2018
8Release Date: Oct/2018
8Start Date: May/2019
8Completion Date: May/2020
Click here for more details
Details
Single Super Phosphate Expansion Project        
8Cost - Rs 15 Crore
8Project Description:A Fertilizer Company is awaiting environmental clearance for its expansion of Single Super Phosphate from 216000 MTPA to 288000 MTPA in India. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers and more. The final EIA report is submitted to the ministry of environment
8Project Event: Discussion process for selection of EPC contractor is ongoing and RFQ for a contractor is likely to be released in July 2018.
Click here for more information
Ammonium Sulphate Expansion Project     
8Cost - Rs 9 Crore
8Project Event: The proposal for a term of reference is accepted in May 2018, a public hearing is likely to be started in August 2018 and RFQ for EPC contractor is likely to be released in August 2018.
Click here for more information
Details
8Is there still the possibility of locating a super basin in the North East of India? The possibility exists. The problem is that the North is unapprised
8HOEC claims it can produce 2 mmscmd of gas in the North East but find out why it can't
8A new set of incentives are immediately needed to push oil & gas E&P activity to go up in the North East. Find out what is needed
Click on Reports for more Details
For reference purposes the website carries here the following tenders:
8Pre-Qualification of vendors for providing Cementing Services Details
8PQC for hiring of Slickline Services Details
8Pre-Qualification of vendors for providing Wellbore Cleanup Services Details
8Hiring of Security Services Contract in HPHT Asset for a period of three years Details
8Provision of Augmentation of Electrical Works Details
8Carrying out Instrumentation jobs at refinery Details
8Supply of Compressor Spares in refinery Details
8Supply of Pipes Fittings and Flanges as per technical specification at refinery Details
8Spares for Single Shaft Extension Drilling Motors Details
8Supply of Pressure Relief Valves for Mud Pumps Details
8Supply of Transformers Details
8Supply of Dispensing Units with Automation Details
8Expression Of Interest for Field Development Planning Services in Offshore Ravva Block Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Fuel Price Hike: Online activists intensify drive for GST on petrol Details
8India mulling change in rules to include shale in definition of petroleum Details
8Oil prices fall as top 3 producers look to boost supplies Details
8Govt looks to stick it out as global crude oil prices lose steam Details
8Week-long Brazil trucker strike leaves food, fuel scarce Details
8Iranian Foreign Minister in India to safeguard bilateral interests after US nuke deal pull out Details
8Exxon pulls offshore workers; Shell, Chevron cut output due to Alberto Details
8Decision on fuel prices in interest of state: Maharashta CM Details

8Nikkei sheds gains as falling oil prices drag on energy shares Details
8Hits & misses: 4 years of Narendra Modi explained in 10 charts Details
8Mumbaikars demand Rs 29 per liter cut in petrol price through GST Details
8Storm Alberto forces U.S. Gulf of Mexico oil workers evacuation Details
84% of LPG users give up sop on PM’s request Details
8
India's ONGC to quadruple output from Bay of Bengal gas field that cost $1 bln Details
8Petrol price hike: Cheaper fuel prices in Nepal spur smuggling Details
8Modi govt must rollback hike in fuel prices instead of 'showing fitness': Cong Details
8Tax department to sell Cairn Energy's attached shares at 'appropriate time' Details
8Under pressure from US President Donald Trump, Saudis put brakes on oil rally Details
8Oil output could return to October 2016 level, says Russia's Novak Details
8Turkey, Russia agree 10.25 pct natural gas discount, Ankara to get $1 bln payment-Erdogan Details
8ONGC yet to hire firm for safe operations Details
8Petronet to partner OVL for stake in Qatar Petroleum LNG project Details
8Petrol prices rise for 14th straight day; cross Rs 85 mark in Mumbai Details
8Definition of petroleum may include Shale too Details
8No need to panic over petrol, diesel prices; Rupee may reach Rs 62 mark, offset losses on fuel Details
8Indian motor fuel prices fourth highest among top 10 crude oil nations Details
8Energiser for shale drill Details
8Mixed global cues likely to keep market in the green; Oil India, L&T to declare quarterly results Details
You can also click on Newsclips for more
Details
8A state based renewable sector company is planning to establish a solar park of capacity 1000MW.
8Land has been aquired for installation of solar panels
8RFS bidding is expected to take place by July 2018
8
The owner shall come out with technical bid and financial bid after RfS bid.
Click on
Details
8The oil market has rallied on the back of US sanctions on Iran, and Venezuelan production declines. It is now believed that OPEC will formulate an exit strategy at its June meeting given the growing risk of demand destruction at current prices, along with increased pressure from key importers. Click on Report  for more.
8Even as the world deliberates on how to avoid a price rise, what if prices go up to $100/bbl. Everyone must be prepared for such an eventuality. See how such an event will impact India relative to other major economies of the world. India is going to be one of the hardest hit, with all of its fiscal parameters going wayward. Find out more click on Report .
8IGL's gas volumes were at 5.4 mmsmd at present. A combination of factors, from Delhi's "green" budget to flaring petrol and diesel prices, help push up gas consumption for IGL. Find out by how much will volumes go up in 2018-19 and 2019-20. This data will be useful for gas marketers, dealing with both domestic and imported gas. Click on Report  for more.
8Get a full mapping of the latest country-wise monthly import of Iranian crude. India is clearly very big in this matrix. Click on Report  for more.
8How big is the Indian market for US ethanol exports? Find out more click on Report.
8Greka Drilling has lost an ONGC contract recently. Essar too has not paid up its past dues. Yet the company remains bullish on India. Click on Report  for more.
8Thermax has taken over its partner B&W’s 49% stake in the TBW JV. Thermax is capable of manufacturing super-critical boilers, sub-critical boilers as well as air pollution control (NOx) equipment. Thermax will also be favourably placed now for NOx orders with B&W technology as B&W has 90GW global installed base of NOx equipment. The oil & gas sector is one of focus areas for Thermax. Find out more click on Report
8Get a comprehensive update on the shipbreaking industry, current trends and events. Click on Report  for more.
8A pipes, valves, pumps and compressors exhibition is coming up. Click on Report  for more.
8High crude prices and rising public anger will keep marketing margins of Oil Marketing Companies under pressure. Find out what kind of a hit they will take in the current and next financial year. Click on Report  for more.
8A global electric vehicle initiative has been rolled out in 100 cities but no Indian city figures in that list. Click on Report  for more. 

8Praj Industries has is trying the grab a large chunk of the 2G ethanol capacity building drive by oil marketing companies. Yet the company is struggling to find its feet. Will the appointment of a new MD help push the company towards a higher growth path? Click on Report  for more.
841 GW of solar photovoltaic capacity additions for 2018 to 2022 fiscal: ONGC along with a few other prominent PSUs namely NTPC, CIL and NLC is expected to join the National Solar Mission in the upcoming months. The phase 2 of the National Solar Mission is expected to mean setting up of 41 GW of solar photovoltaic (PV) capacity additions over fiscals 2018 to 2022, as compared to the previous 11 GW capacity addition over the last five years (FY13-17). 

Details
The latest study seems to suggest that worldwide, the thermal power fleet is sought to be made more flexible to take on the impact of renewable power
8India is taking quick steps in this direction and this might stymie the push to bring in quick start gas based capacities online to fill in the gap
8There are now reports coming in of 40-year old thermal power plants being upgraded to start and stop twice a week
8How will it impact the future of gas based power?
Click on Reports  for more Details
For Indian energy leaders, the website carries here a map of 50 key issues that can impact the sector
The map is arranged in the following manner:
8The impact of an issue on the energy sector – this forms the x axis.
8The degree of uncertainty related to its impact – this forms the y axis.
8The urgency with which we need to address the specific issue – this is represented by the proportional size of the issue bubble.
8A larger size corresponds to a higher degree of urgency.
There are three different zones to monitor:
-- Critical uncertainties: Issues with high uncertainty and high impact (in the top-right quadrant) are the critical uncertainties’ with no clear path of action. These issues keep energy
leaders most awake at night need to be part of the energy leaders’ dialogue and scenario analysis.
-- Action priorities: The issues in the high-impact and low-uncertainty space are those which keep energy leaders busiest (bottom-right, ‘action issues’).
-- Weak signals: The low-impact and low-uncertainty issues (bottom-left quadrant) include those of perceived lesser importance or those that are still not fully understood and need
further investigation.
It is a ready reference tool that provides a clear perspective of what is it that can keep them awake at night
Click on Reports  for more Details
Iran -- which has the world's largest reserves of gas -- thinks India is a more reliable partner than Pakistan when it comes to working out gas supply arrangements.
8Iran has now confirmed that it is in negotiations with an unnamed company for a deepwater pipeline.
8But that will also involve an upstream operation
8Iran also said that Russia's Gazprom is willing to carry Iran's gas to India from Chabahar.
Will looming US sanctions stymie such a plan?
Click on Reports  to find out more   Details
Tamil Nadu was once a good place to do business. Not any more. Consistent flouting of environmental norms by industrial units and a corrupt state machinery have shaken the faith of the people in the capacity of the industrial machine to deliver employment and sustainable growth. The Sterlite episode bring all of this into sharp relief. GAIL had once tried its usual method of riding roughshod over local concerns while building a pipeline network by moving the state and central bureaucracy to act in a hurry. The move ended in failure, with pipeline laying delayed well beyond what was envisaged earlier.
Another flashpoint in Tamil Nadu now is the agitation over ONGC's plans for a Rs 2000 crore development drilling programme involving 110 wells in the Thanjavur District of Tamil Nadu. Crude leakages from pipelines in the area have made the locals skeptical of ONGC's handling of its oil and gas operations in the state. There is mounting opposition to the development drilling programme now.
The company however continues to insist that RFQs will indeed come out soon though they have been delayed for now. Find out more

8
Project Name: Oil Field Development
8Project Cost: Rs 2000 crore.
8Project Description: Oil And Natural Gas Corporation Limited's RFQs for the development drilling of 110 wells in Thanjavur District of Tamil Nadu are delayed on account of the ongoing protests going on against the programme. Recently a pipeline leakage case was reported in Thanjavur. The project also involves installation of an infield pipeline and a Central Processing facility having a capacity of 520 m3 per day. The block includes the fields of Adichapuram, Kizhvelur, Kanjirangudi, Palk Bay Shallow, Periyapattinam, Perungulam, Tiruvarur, Mattur, Nannilam, Narimanam, Adiyakkamangalam, Kuthalam, and Kali. The locations will be now be drilled by the third party based electrical type rigs. An EIA Consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQs for the hiring of EPC contractor for pipeline installation is expected by August instead of June 2018.
RFQs for hiring an EPC contractor for CPF installation is expected by August instead of July 2018.
RFQs for hiring drilling services is expected by Q3 2018..
8Expenditure Approval: Q2/2017
8RFQ Date: Aug/2018.
8Release Date: Oct/2018.
8Date: Jul/2019
8Completion Date: Dec/2022
Click here for more details for key contacts, project configuration and other information. Also see Details
Details
NPK Fertilizer Greenfield Project   
8Cost - Rs 400 Crore
8Project Event: RFQ for the EPC contractor is already released but the project is on hold due to lack of funds.
Click here for more information
Phosphoric Acid Greenfield Project       
8Cost - Rs 300 Crore
8Project Event: RFQ for the contractor is already released but finalization is delayed due to an internal issue. The company is planning to give the first priority to Zinc Smelter expansion project which is more expansive, due to this reason, the company is planning to delay the fertilizer project.
Click here for more information
Ammonia-Urea Energy Saving Project     
8Cost - Rs 250 Crore
8Project Event: RFQ for the EPC contractor is likely to be released soon but fund constraints are coming in the way. It is negotiations with the banking system for additional lines of credit.
Click here for more information Details
8Project Name: POL Terminal Expansion Project
8Project Cost: Rs 120 crore
8Project Description: Owner has hired an LSTK contractor to expand its POL capacity. There is a slight delay in in the RFQs for plant and equipment.
8Project Event: RFQ for the equipment is expected by July instead of May 2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Jul/2018
8Release Date: Sep/2018
8Start Date: Q3:2017
8Completion Date: Q2:2020
Click here for more details

8Project Name: Greenfield LPG Bottling Plant Project
8Project Cost: Rs 120 crore
8Project Description: The owneralong with EPC contractor is setting up an LPG bottling plant by installing 3 X 500 MT mounded storage vessels.
8Project Event: RFQ for electrical and instrumentation work is to be expected by September 2018.
8Expenditure Approval: May/2017
8RFQ Date: Sep/2018
8Release Date: Oct/2018
8Start Date: Q1:2018
8Completion Date: Q3:2019
Click here for more details

8Project Name: Barmer Refinery Greenfield Project
8Project Cost: Rs 43129 crore
8Project Description: The owner has appointed a PMC contractor for the grass-root refinery cum petrochemical complex. RFQ for the technnology licensor for some units like DHDT, HGU, PFCC gasoline hydrotreater unit is already out and for rest of the units. RGQ is will expected soon.
8Project Event: RFQ for technology licensors is expected by August 2018.
RFQ for the LSTK contractor is expected by Q1 2019.
8Expenditure Approval: Q4/2016
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date: Q1:2019
8Completion Date: Q4:2023
Click here for more details

8Project Name: Refinery Greenfield Expansion Project
8Project Cost: Rs 9000 crore
8Project Description: The owner is planning to expand its refining capacity. A consultant has been appointed to prepare the Pre-feasibility Report. Currently, surveying work is going on. Licensor selection will be done after the selection of PMc contractor earlier, it was not clear who amongst the licensor and PMC contractor will be selected first. Further RFQ will be expected soon.
8Project Event: RFQ for PMC contractor is expected by September 2018.
8Expenditure Approval: Q1/2017
8RFQ Date: Sep/2018
8Release Date: Oct/2018
8Start Date: Q3:2018
8Completion Date: Q3:2023
Click here for more details

8Business Opportunity For Maintenance Contractor
8The refiner is planning to float a bid for maintenance work in one of its planst for furnace, Column, Heat exchanger and piping in the month of July, 2018 at its refinery ahead of maintenance shutdown. Details
8The M-GPP has been built by Expro, UK
8The facility is designed to process up to 35 mmscf gas per day
8An expansion plan is also underway
Click on Reports for more Details
8Project Name:  Crude Oil Storage Tank Package
8Project Cost: Rs 20 crore
8Project Description New: ONGC is planning construction of crude oil storage tanks near Gamij at the Ahmedabad asset in Gujarat. The project involves the construction of 5 crude oil storage tanks of different storage capacities to store crude oil from the nearby oil field in Ahmedabad Asset. The storage tank will, in turn, be connected with the nearby GGS through existing pipeline network. The construction work is expected to start by Q4 2018. Further RFQs for the project are expected shortly.
8Project Event New: RFQs for hiring an EPC contractor is expected by June 2018.
8Expenditure Approval: Q1/2018
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more information

8Project Name: Oil Field Development
8Project Cost: Rs 600 crore
8Project Description: The Promoter is planning to drill 06 exploratory wells. Four Exploratory wells  were drilled to complete the first phase exploration MWP. Out of the four wells, two wells had commercial Gas discoveries. Water depth of the 3D area in this block where wells are to be drilled falls within the range of 17m to 37m. The depth of wells will be between 2600 to 3000m. Existing chartered hired Rig is going to be used for the drilling activities. The requirement for the project will be drilling bits, drilling pipes, casing pipes, Blow Out Preventer, X-mass tree, cementing services and drilling fluid services. An EIA consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of equipment and oilfield chemicals are expected by Q4:2018.
8Expenditure Approval: Q4/2017
8RFQ Date: Q4/2018
8Release Date: Q4/2018
8Start Date: April/2020
8Completion Date: Dec/2022
Click here for more details   
Details
For reference purposes the website carries here the following tenders:
8Carrying out Piping works in refinery Details
8Procurement of Mechanical Tools and Measuring Instruments Details
8Procurement of Tri-Sodium Phosphate Details
8Procurement of Metering Skid for Pipeline Project Details
8Procurement of Granular Activated Carbon for GCU & IOPS Details
8Supply of Helium and Argon Gas at refinery Details
8Carrying out HAZOP study for Pipeline Projects Details
8Survey of Haldia- Barauni Pipeline Profile and Soil Cover Details
8Annual Maintenance Contract for PLC Control System at Lube Blending Plant Details
8Supply of Hardware for 27 Refinery Vessels as per tender specifications under TPI Details
8Miscellaneous Electrical support jobs during shutdown at refinery Details
8Deputation of Turbine Specialist Engineer Field Supervisor for Maintenance of RGC Steam Turbine of DHDT unit of refinery Details
8Re-certification of Emergency Response and Disaster Management Plan (ERDMP) of RLNG Pipeline Details
8Change Detection Analysis and Land Use and Land Cover Reports using Satellite Imagery Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Toyota to build fuel cell stack plant, ramp up fuel cell vehicle sales from 2020 Details
8Climate victims seek justice, in the courtroom and on the street Details
8China's Shaanxi province to curb output from refineries, chemical and coke plants Details
8Russia's Novak says oil production curbs could be eased 'softly' - Ifax Details
8OPINION: Grasping at straws - Pathetic state of biofuels in India Details
8GAIL’s fourth quarter net profit grows fourfold to Rs 1,021 crore Details
8States have the capacity and must cut duty on petrol: NITI Aayog Details
8Indonesia to roll out 25 per cent biodiesel rule from 2019 - official Details

8EU ends antitrust case against Russian Gazprom without fines Details
8India could have 10 million CNG vehicles on roads by 2025: Report Details
8PM Modi has an oil problem and Saudi Arabia is set to make it worse Details
8Windfall oil tax on ONGC in the offing to soften fuel prices Details
8GAIL says time not ripe for breaking only company laying pipelines Details
8
India's GAIL turns to spot and short-term LNG deals Details
8Vedanta will abide by law of land, says Anil Agarwal Details
8Weak Indian Rupee mainly responsible for fuel price hike: Pradhan Details
8Mamata urges Centre to provide relief to people from fuel hike Details
8Heavy capex plans leave ONGC with little heft to absorb oil price surge Details
8Guwahati-Barauni Gas Pipeline to come up by 2021 Details
8
Can States cut more tax on oil than Centre? Details
8Fuel on the boil: Petrol prices hiked for 12th day in a row; check latest rates here Details
8GAIL says split the company when gas market matures Details
8Indian Oil plans to invest Rs 1,387 crore in Andhra Pradesh Details
8RIL, Shell seek hike in PMT cost recovery limit Details
8‘Oil, rupee could test Modi government’s 5th year’ Details
8Costlier crude: Burden may fall again on ONGC, OIL Details
8Pathetic state of biofuels in India Details

You can also click on Newsclips for more
Details
8Project Name: Pumped Storage Hydroelectric Project
8Project Cost: 1500 crores
8Project Description: Owner is getting delayed in carrying out the preliminary studies for a 600 MW greenfield pumped storage plant. Owner is expected to come out with an EoI soon.
8Project Event: RFQs for an Expression of Interest (EoI) for PFR and DPR consultancy services are expected by Q3 2018, instead of Q2 2018.
8Expenditure Approval: Q4:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q3:2022
8Completion Date: Q4:2027
Click here for more information
8Project Name: Hydroelectric Power Station Project
8Project Cost: 100 crore
8Project Description: Promoter's plan to install a head regulator on the existing 120 MW hydro power station barrage is getting delayed due to lack of forest clearance. A single package for civil and hydro-mechanical equipment is expected.
8Project Event: RFQs for rock testing, ground testing and soil testing contractor are expected in July 2018.
 RFQs for civil and hydro-mechanical equipment contractor are expected in August 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Jul/2018
8Release Date: Jul/2018
8Start Date: Q2:2019
8Completion Date: Q2:2021
Click here for more information
8Project Name: Thermal Power Station Maintenance Project
8Project Cost: 12 crores
8Project Description: Owner has planned a 35-day scheduled annual overhaul in the 250 MW thermal power station. The mandatory jobs include replacement of soot blower, repairing of economizer hoppers, repairing of pent house, replacement of seals, replacement of guide bearing of turbine, among others.
8Project Event: RFQs for an annual overhaul and servicing of equipment are expected by first week of June 2018.
Click here for more information Details
8Project Name: Development Drilling
8Project Cost: Rs 3000 crore.
8Project Description: ONGC's RFQs for the polymer flooding for a total of 500-well development drilling project are expected soon.
8Project Event: RFQs for Polymer Flooding are expected by August 2018.
8Expenditure Approval: Q2/2014
8RFQ Date: Aug/2018.
8Release Date: Q4/2018.
8Date: Jul/2018
8Completion Date: Q4/2022
Click here for more details for project and key contact data
Details
8Project Name:  Drilling Field Development
8Project Cost: Rs 375 crore
8Project Description: The operators RFQs for hiring rig services for exploratory drilling of 13 wells have been delayed on account of environment clearance issues for the project. The equipment required for the project is casing pipes, drilling pipes, cementing services, drill bits, Xmas Tree and other oilfield chemicals. Further RFQs are expected shortly.
8Project Event:
-- RFQ for the hiring of rig services is expected by August instead of June 2018.
-- RFQs for the equipments and oilfield chemicals are expected by August instead of June 2018.
-- RFQs for hiring wireline and cementing services is expected by September 2018.
8Expenditure Approval: Q4/2016
8RFQ Date: Aug/2018
8Release Date: Oct/2018
8Start Date: May/2019
8Completion Date: May/2021
Click here for more information for key contacts and other details
Details
The glass is either half full or half empty. Depends eventually on your perspective
8The jury is still out on how Petronet LNG or for that matter other LNG terminals are going to fare in India
The following threats are noticed
8High oil prices will make LNG more expensive and in India demand is highly elastic to price
8A revival of relatively less expensive domestic gas production will squeeze demand for LNG
8As more terminals come out there will be rising competitive intensity in LNG re-gasification
8There can be a gradual LNG demand, beginning as of now with the commissioning of RIL’s petcoke gasification project.
Click on Reports  for more
Details
If you are going to take a leap into the future, which are going to be the winning technologies in the future?
8For all big Indian companies, it will become imperative to take a bet.
8So which one will you bet on?
8The website provides you dynamic access to a list of 30 such technologies that will eventually lead the world in sustainable growth
8You can track these technologies over time, find out what the gaps are and also how viable they will eventually become.
8It is pertinent to note that about half of these technologies are not on track yet while others are.
8Find out the latest developments in these technologies
Click on Reports  for more
Details
Vedanta plans to double its production through gross capex investment of $2.3 bn over 2-3 years to monetize 375 mmboe of oil & gas
8The company plans top to increase the number of wells in Rajasthan from 500+ to 900+
8A total of 9 development drilling rigs are under deployment - 4 rigs at site, 3 rigs to be added in May and 2 rigs in August.
8Get a backdrop on the company's investment plan in Barmer
Click on Reports  for more Details
Vedanta did a switch some time ago from using just polymer flooding for its IOR and EOR programmes in its  RJ-ON-90/1 block to a more broad-based Alkali, Surfactant and Polymer (ASP) flooding technique.
8The company intends to or is using as much as 400,000 bbl/day of ASP solutions.
As the company plans to double its footprint in Barmer, the use of ASP solutions will go up as a lot these wells get into IOR and EOR mode soon after production.
8At one point in time, the company boasted about using the highest volume of polymer flooding in the world.
8These figures are likely to go up as the company not only tries to steady production from existing wells but dig up more wells going ahead.
Click on Reports  for more details
     Details
Where are the big investments coming up in the next five to seven years in India? Here is a synopsis:
8Railways: Investments to the tune of Rs 8.56 lakh crore planned in next five years for decongestion, safety, high speed rail, and network expansion
8Metros: Projects worth Rs 2.5 lakh crore are under expansion and implementation
8Power T&D: Investments of around Rs 2.6 lakh crore expected in transmission sector by 2022 with nearly Rs 30,000 crore to be spent in the transmission system of 220 kV voltage and below
8Oil and Gas: Indian oil and gas sector to garner investments to the tune of Rs 6 lakh crore in next seven years
8Smart Cities: Government has approved investments of around Rs 1.92 lakh crore in 90 cities
Click on Reports  for more Details
The Ravva oil & gas block is likely to see a spate of opportunities now that the promoters have decided to look at developing discoveries which are further away from its existing production facilities
8A FDP plan is sought to be put together by selecting the most viable and low cost development option (subsurface, well and surface facilities configuration).
Click on Reports  for more Details
8The process of hiring 100% mode EPC/EPCM/LSTK contractors will be only for high-value projects instead of all.
8The RFQs for the EPC/LSTK contractors will come out over a period of time. Details
By 2050, global oil consumption projected to equal 7 - 9 cubic miles of oil.
This is what will be needed to replace 1 cubic mile of oil:
8Solar Roofs (PV): 4.2 billion roofs, 250,000 roofs per day for 50 years, with each roof at 2.1 kW with 20% availability
8Solar CSP: 7,700 solar parks, 3 per week for 50 years. 900 MW each with 25% availability
8Hydro: 200 dams: 1 every quarter for 50 years., 18 GW with 50% availability
8Windmills: 3 million, 1200 per week for 50 years. 1.65 MW each with 35% availability
8Nuclear: 2,500 plants: 1 per week for 50 years, 900 MW each with 90% availability
8The argument is that all of these forms of energy will be needed for a sustainable future
Click on Reports  for more
Details
 A company such as Vedanta must be able to answer the questions on the use of toxic chemicals and water management practices in their polymer flooding programme in the Barmer bloock.
Toxic chemicals:
8Does the company provide quantitative reporting on reducing the toxicity of injection luids? 
8Does the company state that as a practice it will not use diesel in injection fluids? 
8Does the company state a practice to not use BTEX in injection fluids? 
 Water Management:
8Does the company report principal practices used to test cement integrity, such as use of cement evaluation logs, or temperature, acoustic, or ultrasonic measures? 
8Does Cairn disclose whether it routinely assesses groundwater quality after it drills?
8Does it disclose the percentage of flowback water managed and reused for subsequent operations? 
8Does Cairn disclose the aggregate quantity of water used for operations? 
8Does it report the share of water sourced from various types (e.g., x% groundwater, y% surface water, z% flowback water, etc.) 
8Does the company state it has a policy of using non-potable water sources to the fullest extent technically practicable? 
8Does Cairn report the intensity of its water use—the amount of water required to produce measurable units of energy (e.g., gallons/million BTU[MMBTU])?  Details
The Barmer chemical flooding plan will require high volumes of water that will be mixed with chemicals and pumped deep into the reservoir.
8Access to water is a problem too as Rajasthan is water stressed.
8Some of the water containing intentionally added chemicals returns to the surface and must be stored. treated, reused, or disposed of safely. 
8One of the highest risk pathways for water contamination of surface and ground water is through surface spills and leaks of this return water. 
8Management of water risks must be a core priority for Cairn given its aggressive polymer and ASP flooding programme..
8And is it doing a good job of it?
8This is something difficult to find out as adequate data is not disclosed.
8The problem is that adequate reporting standards have not evolved yet, making monitoring for stakeholders all that more difficult.
8Pre-drill testing of water quality is useful for providing baseline data against which claims of water contamination can be measured. Post-drill monitoring is important for continued evaluation of water quality to ensure timely action should any problem arise. 
8Development of a new generation of injection chemicals that can work cost-effectively with non-potable water is also a step forward but it is not know whether a due process is laid down in India.
8In tandem with rapid technological innovation, companies have been scaling up waste treatment operations and waste treatment.
8There is now a need for government appointed international consultants to tell us how to make the reporting process more transparent. Details
It must be noted that every company has its own corporate culture. Vendanta has too.
8But here are some basic fundamental questions that Vedanta must address about its HSE programmes
8Does the company provide compensation and incentive packages for senior management linked to HSE and social impact performance and its results? 
8Does the company require third party independent auditing of HSE operations?
8Does the company rely on third party databases -- there is no third party data base in India as yet but clearly the DGH can create such a database -- for information to evaluate potential contractors before hire? 
8Does the company disclose notices of violations of environment safety norms? Details
8Project Name: Oil Field Development
8Project Cost: Rs 700 crore
8Project Description: The Promoter is planning development drilling of 29 wells. The project also involves Construction of three GGS and laying of underground transportation Pipelines. Promoter owned Drilling Rigs are proposed to be deployed for undertaking drilling activities. The equipment required for the project will be Directional Drilling services, Drilling Pipes, Casing Pipes, Drilling Bits, Cementing services, Blow Out Preventer (BOP) and Mud engineering services. An EIA consultant has been already hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of EPC contractor for GGS construction and laying of pipelines are expected by Q3:2018.
RFQ for the hiring of equipment and oilfield chemicals are expected by Q4:2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Q3/2018
8Release Date: Q4/2018
8Start Date: Feb/2020
8Completion Date: Dec/2022
Click here for more details for project configurations. Get a dedicated analyst to help you out. 
Details
8Project Name: Greenfield Gasoline Hydrotreating Unit
8Project Cost: Rs 600 crore
8Project Description: The owner along with EPC contractor is carrying out engineering activities to install a new Gasoline Hydrotreating Unit (GTU) and associated facilities.Contracting for equipment and services are currently on.
8Project Event: RFQ for electrical and instrumentation work is expected by June 2018.
RFQ for equipment erection work for GTU is expected by July 2018. 
8Expenditure Approval : Q1:2017
8RFQ Date : Jul/2018
8Release Date: Aug/2018
8Start Date : Q1:2017
8Completion Date : Q1:2019
Click here for more details, including full project configurations.
Details
8The EOR method will be Cyclic Steam Stimulation to be used to recover heavy crude oil
8RFQs are expected by Q4:2018
Click on Details for more Details
ONGC has completed the drilling operations for the B-149 offshore project located in Bassein offshore field.
8The company had involved its own Jackup rig Sagar Jyoti for the drilling in Mumbai Offshore.
8The rig has been moved off location.
Click on Details for more Details
8Project Name: POL Terminal Expansion Project
8Project Cost: Rs 120 crore
8Project Description: The owner is planning the expansion in its existing POL terminal by installing tanks with a capacity of 4 X 1,200 KL of ethanol, 4 X 25,000 KL of HSD and 2 X 12,000 KL of MS.
8Project Event: RFQ for the equipment is expected by August 2018.
8Expenditure Approval : Q3:2017
8RFQ Date : Aug/2018
8Release Date: Oct/2018
8Start Date : Q3:2018
8Completion Date : Q2:2020
Click here for more details and key contacts here.

8Business Opportunity for Terminal Maintenance Contractor:
8The owner is planning to float a bid for an annual maintenance contract for Bed maintenance work and Cathodic Protection maintenance work at its POL Terminal.
Click on Details for key contacts
Details
For reference purposes the website carries here the following tenders:
8Inspection of bare pipe and coating pipelines Details
8Engaging Consultant for providing Consultancy for Formulating Comprehensive Modalities for Development and Operation of Common User Terminal amongst OMCs Details
8Procurement of Compressor Spares Details
8Procurement of DHDT RGC Steam Turbine Spare Parts Details
8Conversion of existing mild steel Floating Roof vertical tank into Internal floating roof and allied pipeline/ civil works Details
8Modification in operation logic of ROSOVs and other allied modifications Details
8Fabrication and Supply of universal cleaning PIGs Details
8Design, Engineering, manufacturing and Inspection of Forged Fittings Details
8Standing Rate Contract for Prefabricated canopies at Retail Outlets Details
8Hiring of services for supply & application of liquid nitrogen for shutdown of plants Details
8Procurement of Transmitters for Neelam & Heera Platform Details
8Procurement of Mixed Metal Complex Details

You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8GST on fuel price not possible until all state FMs agree: MoS Finance Details
8RIL, Shell, ONGC told to pay $3.8 billion as government’s share of PMT Details
8Fuel price hike: Protests against rise in petrol, diesel prices in Delhi Details
8Global crude oil prices drop on potential increase in OPEC output Details
8Punjab fuel pump owners demand reduction in VAT on fuel Details
8No plans to reduce VAT on fuel, indicates Gujarat deputy chief minister Details
8Fuel price hike: Protests to be held across Mumbai against petrol price rise Details
8Fuel price hike: Trinamool to protest across Bengal against sharp petrol price hike Details

8Fuel price hike: BJD to stage dharna outside Raj Bhavan in Odisha Details
8Protests across Rajasthan over fuel price hike Details
8India to take a 'long-term" view on fuel pricing - minister Details
8Oil stocks under pressure; slip up to 8% Details
8In vote of confidence, oil firms mop up new North Sea blocks Details
8
Vedanta Resources operating profit up 27% to $4.1 bn in FY'18 Details
8Cabinet approves MoUs with France, Morocco on clean energy Details
8Petrol price rises for 10th straight day; hits new record 77.17 per liter Details
8Government should review taxes on petrol, diesel: HPCL chairman Details
8How Indian economy has fared under Modi government and where it’s headed Details
8The double whammy from rising crude oil prices Details
8
As petrol, diesel prices hit fresh record high, government looks at ONGC to share burden Details
8HPCL is keen to takeover MRPL before end of 2018-19: Chairman & MD Surana Details
8BJD demo on fuel price hike Details
8Natural gas to 5000 capital homes in pipeline Details
8Turkmenistan says close to securing TAPI pipeline financing Details
8To reduce fuel price, government looks at ONGC to share the burden Details
You can also click on Newsclips for more
Details
The fact that people have died protesting against the Vedanta Group's plans to expand the copper smelting unit because it has been polluting ground water and causing ailments in the region needs to be taken seriously
8Focus needs to also shift to Cairn India's polymer flooding programme in Rajasthan's Barmer field, which is being touted as being the largest in the world. 
8The flooding involves pumping a massive 400,000 barrels of chemical laden fluid per day into the earth.
8This plan is only for the Mangla field but more chemical laden fluids will be pumped in when the EOR plan is extended to other fields in the block.
8The problem here is of disclosure. How safe is the flooding programme? 
8The toxic chemicals used in such operations have generated significant public concern and become a flashpoint for public controversy in the west. 
8These chemicals, if released into the environment, can have a range of harmful spinoffs based on their toxicity, mobility, solubility, volatility, and persistence. 
8Cairn must provide an undertaking to use “environmentally friendly” fluids and provide specifics that would allow other stakeholders to evaluate the effectiveness of these initiatives.
8US companies now ensure that diesel is completely eliminated from fluids that are pumped into the reservoirs. Can Cairn give such an undertaking?
8Then again, some environmentally friendly companies have taken out the suite of benzene, toluene, ethylbenzene, and xylene (BTEX) chemicals from injection fluids. Isn't it possible for Cairn to do so too?
8Some companies have begun employing chemical hazard rating systems for managing and reducing the toxicity of injection chemicals, can Cairn do it too?
8Companies such as BHP Billiton have reported that 81% of its injection fluids contain chemicals that satisfy its most demanding toxicity reduction criteria which exclude endocrine disruptors, known or suspected carcinogens, mutagens, reproductive toxicants, or US government listed “priority pollutants”. 
8Cairn India must take the initiative and start the process of doing this in India too .
8If not, then it is the job of the government to ensure that the massive amounts of chemicals pumped into the Barmer reservoirs are safe from the environment and human health point of view.  Details
Get a full mapping of LNG chartering activity from 2009 to first quarter 2018 in terms of:
-- Long term (over 7 years)
-- Medium Term Charters 3 - 7 Years
-- Short as 6 months - 3 years
-- Spot -- Single Voyage Click on Reports  for more   Details
 < 1 2 3 4 >  Last ›

Showing 51–100 of 363 items