Oct 2025

It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia

Click on Reports for more. Details
8Project Name: Jalore and Sirohi Districts City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
8Project Name: Ahmedabad District (Rural) City Gas Distribution
8Project Cost: Rs 300 crore Click here for more details Details
New Page 1 8Gazette notification for land acquisition for underground pipeline in Mehsana district, Gujarat [Gazette] Details
8Initiation of public consultation for declaration of Adani Total Gas Limited’s Mundra SEZ natural gas pipeline as common or contract carrier [PNGRB] Details
8Extension of bid submission and technical bid opening dates for Visakhapatnam–Bhogapuram petroleum and petroleum product (ATF) pipeline project [PNGRB] Details
8Intimation of recommencement of operations of vessel “SEAMEC SWORDFISH” effective October 22, 2025 [Seamec] Details
8Cessation of independent directors Dr. Sudhir Kumar Jain and Shri Bhadresh Mehta with effect from October 22, 2025 [GSPL] Details
Details
8Find out why prices will be this low
8And for how long
8But will India be able to take advantage of it?
Click on Details for more Details
Hedge funds are getting it all wrong in the oil market
8The markets are moving in the opposite directions to these bets
8Is this going to be a trend going ahead? Details
8On paper, India is the biggest infrastructure build story in the developing world. In practice, investors are routing their money elsewhere.
8New findings make it clear: countries with clean guarantee structures and fast risk-cover execution are winning. India, weighed down by policy volatility and no guarantee architecture, isn’t even in the race.
8While smaller economies are unlocking multilateral bank guarantees and crowding in private capital,
8India is still trapped in paperwork and policy improvisation.
Click on Details for more Details
1) Kerala-Konkan tier-1 oil-spill response bid pushed to 29 October; GST-era repricing window opens
8OIL has stretched the bid clock by 16 days on its Kerala-Konkan tier-1 OSR package.
8The move arrives alongside a GST jump to 18% that forces re-math on service taxes.
8Mobilisation LDs and option-clause levers still stand, so only pricing hygiene moves — not risk.
 
2) Date extended to 03 November 2025 for Juhu AFS O&M tender
8ONGC has pushed the Juhu AFS O&M bid by 31 days while hardening governance through SCC and SLA precedence.
8The package keeps quality control under a dual-manual regime and pushes operational uptime risks onto the contractor.
8Reimbursements above Rs 10,000 and multi-mode e-security aim to attract serious aviation fuelling operators without diluting standards.
 
3) Bid closing pushed to 28 October 2025 for KCl dosing O&M
8ONGC has extended the KCl dosing tender by 27 days while tightening tax and compliance guardrails.
8The SOW hard-codes dosing accuracy and high-pressure metallurgy with DCS-linked measurement.
8The combination favours lab-led operators and discourages document-light bidders.
 
4) Closing extended to 28 October 2025 for Western Offshore pigging O&M
8ONGC has pushed the Western Offshore pigging maintenance bid by 21 days while rewriting the tax playbook to an 18% concession regime.
8ATC now hard-codes e-BG/insurance surety and vendor-code prerequisites alongside an integrity-pact upload.
8The combination favours OEM-backed integrity specialists who can mobilise within ONGC’s SCC logistics frame.
 
Click on Details for more
Details
1) CTU/NPU/FPU triad: Vendor pricing will be tough
8The triad with heating strengthens OIL’s in-house capability for clean-outs, stimulations, and wax/paraffin management, directly impacting production reliability in older wells.
8LDs up to 7.5% for delays and a 5-year residual-life certification by named TPIs raise the quality and schedule bar.
8The payment throttle for part-mobilization could reshape vendor pricing and deployment strategy without easing accountability.
 
2) OIL PS-1 Duliajan pipeline patrolling tender hard-codes GPS, twice-weekly sweeps and RLC-linked wages
8OIL’s new PS-1 pipeline patrolling tender looks routine on the surface but hides hard daily kilometre and hour targets.
8Pair that with GPS custody risk and full cost-escalation absorption, and margins tighten quickly.
8The absence of an arbitration track on the bid page adds another variable bidders can’t ignore.
 
3) Licence widened, insurance toughened after bidder queries in ONGC Rajahmundry DG/electrical O&M
8After participation by five electrical contractors, ONGC has recast the licence rule to match the 11 kV operating envelope.
8Insurance floors are raised and standardised, resetting compliance cost structures.
8The discontinuation right remains intact, leaving bidders to rebalance risk and price without comfort on escalation.
 
4) ONGC whipstock window-milling pre-bid slams door on GCC edits and date relief; KPI regime stays tight
8Two completion majors turned up, but ONGC kept the playbook rigid.
8No GCC changes, no date extensions for GeM glitches, and EMD/TPIA compliance will decide who even reaches pricing.
8With KPI-linked deductions intact, only tool-rich vendors can bid aggressively without bleeding margin.
 
Click on Details for more
Details
1) ONGC widens delivery window and hardens one-lot inspection and payment rules as drill pipe spinner tender
8A two-week bid extension is the headline, but the real story is in the lotting and inspection discipline.
8ONGC will pay seaport-wise only against complete lots, and it will inspect only once—on the full 21-unit quantity.
8Delivery timelines were relaxed; documentation and logistics were not.
 
2) OIL Rajasthan cementing & BHP package extends runway for OEM-anchored compliance
8OIL has granted a longer runway on its Rajasthan cementing & BHP package while keeping the scope and PQ discipline intact.
8The corrigendum resets buyer-added terms and opens friendlier banking rails for EMD and PBG without diluting integrity standards.
8The strategic question now is whether extra time expands the vendor pool or simply reprices desert logistics.
 
3) OIL’s Madhuban ZLD desalination bid pushed further as ATC and QA guardrails tighten
8OIL has extended its 3,000 KLPD BOO ZLD desalination bid to 11 November, while keeping the compliance throttle high.
8The buyer has clarified bank rails for EMD/PBG and named Gulf Lloyds as the inspection agency under ITB.
8The real test now is whether the extra runway deepens technically compliant participation or merely reprices by-product and power-integration risk.
 
4) OIL’s five-well sand consolidation tender pushed ahead with 400-day contract cap and tighter phase gates
8OIL has extended its chemical sand consolidation bid to 24 October and simultaneously fixed the overall duration at 400 days from LOA.
8Phase-gate windows have been lengthened across study, mobilisation and execution, while inter-location buffers have been raised.
8Bank-rail options for securities remain flexible, but the documents do not disclose why the date was moved.
 
5) Heavier lift spec and new MHE rules reshape bidder pool for ONGC shore base tender
8ONGC’s shore-base tender has been pushed out again, even as the technical bars have quietly risen.
8The crane envelope now calls for a 110 MT truck-mounted unit with brand-new forklifts and expanded HSE/electrical annexures.
8What this does to vendor turnout, pricing discipline, and mobilisation risk is where the story gets interesting.
 
6) Bid window pushed as QCBS-heavy UC pilot consultancy stays technical-first
8OIL’s Baghewala upper carbonate consultancy is gaining more calendar but not losing any teeth.
8The SoW still forces DFN/geo-mech and thermal-capable simulation all the way to pilot design.
8The new date shifts bidder strategy without relaxing the bar.
 
Click on Details for more
Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
1) Dual-bar performance regime set for sucker-rod servicing in ONGC Ahmedabad Asset.
8ONGC has tied start-up LDs to a separate weekly throughput recovery, tightening both ramp-up and run-rate discipline.
8Milestone-only invoicing and strict price-breakup controls reshape cashflow and compliance behaviour.
8A limited vendor pool on GeM narrows the field while raising the bar on yard-readiness.
 
2) Compressed rig-painting schedule with DFT-tight QA set for training rig IPS-M700-10
8ONGC wants the training rig painted to marine-grade specifications under a 7-day mobilization and 30-day execution rhythm.
8LDs kick in for delay, while DFT logs and staged inspections raise the quality bar.
8Lump sum with vendor-sized BOQs could widen spreads between disciplined and casual bidders.
 
3) Deep price dispersion marks HAZOP/QRA package in ONGC Assam Asset.
8ONGC’s Assam Asset has ranked bids for multi-site HAZOP and QRA with a striking spread between L1 and L6.
8The scope mandates PHAST/SAFETI modelling and compresses delivery into 180 days.
8The pricing outcome will test whether lean risk teams can deliver regulator-grade outputs at scale.
 
4) M/s Ravindra R. Gupta takes L1 in ONGC Mehsana civil works contract
8A tightly structured bid process sees Ravindra R. Gupta emerge as L1 with a 20% quantum, showcasing ONGC's push for experienced civil contractors.
8The option for scaling work by up to 40% adds flexibility, though it places operational pressure on contractors.
8Pricing stability remains a key factor as bidders navigate the firm contract terms.
 
5) Bharti Airtel, Embee Software disqualified as OIL adjusts mobilization timeline for this contract
8With Bharti Airtel and Embee Software disqualified, the focus on strict compliance with technical criteria intensifies.
8The extended mobilization period allows contractors more flexibility, but penalties for delays loom large.
8The move to hire a secondary layer of email security signals OIL’s commitment to robust cybersecurity but raises competition concerns.
 
6) ONGC readies three-year mobile ETP packages: Scope refixed
8ONGC has clarified who pays for what at site while leaving the treatment design to the contractor.
8What remains is execution discipline—weekly lab proof, sealed meters, and four-day moves.
 
Click on Details for more
Details
8The move locks in operational synergies but challenges contractors with scope expansion at fixed pricing.
8An extended deadline gives major offshore players more room to align bids.
8Big companies line up
Click on Details for more
Details
8ONGC has answered the toughest questions by hard-anchoring BOP recertification to OEM or OEM-authorised shops.
8Equipment downgrades sought by bidders were mostly refused, signalling a reliability-over-cost posture
Click on Details for more
Details
8That is a large amount of money
8The vendor pool curation via BEC suggests reliability over breadth of competition.
Click on Details for more
Details
8Was the tender tweaked too far?
8For a single bidder is to the operator’s disadvantage
Click on Details for more
Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
1) Single-bid, item-rate integrity survey with GST/VIM payment gate
8GAIL’s HVJ integrity-survey tender hard-codes digital invoicing and GST credit checks into cash release. The dual-path BEC keeps the pool specialised while widening entry to firms strong on value or length. A stray “boundary wall” subject inside standard forms is a fixable anomaly that bidders should force-clarify.
 
2) GMPL zero-rates the playing field and hard-codes ITC safeguards in SEZ consultancy bid
8The new SEZ consultancy tender prioritises audit-proof invoicing and zero-rated evaluation over headline low prices. A fixed manpower floor and a “no negative” service fee rule curb under-quoting that historically sinks delivery quality. The twist is cash-outflow neutrality even if zero-rating changes mid-stream — but bidders must carry the compliance risk.
 
3) EPCM without ePBG, long EMD hold: NRL’s Panchgram POL terminal consultancy resets risk levers
8NRL’s Panchgram EPCM tender mixes a sizeable EMD and 180-day validity with a no-ePBG stance. The package demands full-fat engineering plus 20-month site supervision on a lump-sum basis. Arbitration is marked “No,” raising the stakes on pre-bid risk framing.
 
4)  LPG plant pushes data-led 12-station carousel upgrade with strict SAT and SAP linkage
8The LPG plant tender hard-codes throughput, accuracy, and leak-rejection KPIs while elevating digital traceability. Annexure-level clauses supersede GCC and GeM guardrails curb adventurous ATCs. The cost of fire-spray SAT, SAP integration, and two-year vendor-funded spares may reshape bidder pricing.
 
5) HPCL folds apron and tanker risks into QRA-ERDMP, sets single-award, penalty-backed timelines
8The Patna aviation facility tender rewires risk studies to capture the highest-consequence interfaces—tanker logistics and apron/refueller operations. Single-vendor accountability, strict 6/8-week deliverables, and a hard LD cap aim to compress report cycles and sharpen quality. But precedence of special terms over platform defaults could reshape who actually qualifies.

Click on Details for more
Details
1) Five extensions and EPC-grade specs push for this BUP GeM pilot toward a higher-compliance, fewer-bidders contest
8This tender stretched 44 days beyond the original close as the scope hardened into EPC-like governance. The spec now spans HAZOP, FAT/SAT, ATEX, multi-point thermometry, and software-set vacuum controls with a payment advance tied to BDEP. The bar moved up for vendors, but so did clarity on execution risk. But the point is that it is an interesting pilot plant
 
2) Three-step bid extension reshapes EPC playbook on GGL’s 12 MW captive solar
8GGL’s 12 MW captive solar tender has now slipped three times to 03-Nov-2025, stretching the window by 31 days. An EPC-only reverse auction and tariff-indexed NEEGG penalties keep bidders honest on capex and delivery. The securities stack suggests GGL is pricing reliability risk into bids, not after award.
 
3) Two-step extension tightens discipline yet gives time on polymeriser reactor system for PP unit
8NRL’s licensor-sensitive polymeriser package moved the bid clock by 14 days without loosening commercial guardrails. ATC primacy, a hard bar on price-bid deviations, and a mandatory licensor NDA keep the field clean. The split-tag billing and full-stack design obligation will shape who finally bids and how they price risk.
 
4) Four extensions and strict RFQ-over-GeM rules reset bidding ground for VBPL vertical pumps
8BPCL’s VBPL pump package stretched its bid clock by 21 days, but tightened its governance. The RFQ explicitly overrides GeM boilerplate on delivery, EMD, consignee and evaluation, and MSE/MII preference now hinges on correct clicks and uploads. Pre-bid replies lock in dry-running seals and forced-draft cooling, pushing bidders to price reliability, not exceptions.
 
5) MRPL extends feasibility study bid for aromatics recycle gas compressor turbine-to-vsd conversion by 10 days
8MRPL has pushed the GeM deadline on its turbine-to-VSD feasibility and constructability study to 13 November. The move keeps commercial terms intact while giving bidders more room to stress-test constructability and POC scope. Zero-rated SEZ supply remains in force, but dispute-resolution language needs watching.

Click on Details for more
Details
BPCL Andhra Pradesh PP licensor tender pushes to 14 Nov as EIL pivots award to highest NPV and trims foreign EMD
8BPCL’s polypropylene licensor race just picked up seventeen extra days. EIL has also clarified that award rides on highest NPV while easing foreign EMD. That combination could widen the field and tighten lifecycle pricing discipline.
Click on Details for more Details
Three-way contest for BF-702 A/B tanks as owner extends schedule and tightens eligibility
8This acetic acid tank tender drew three bidders after multiple deadline shifts. The package leans on dense Technip specs and an LSTK construct that front-loads quality control and documentation. A stringent support-company clause could widen the field yet raise surety costs for foreign-backed entrants.
Click on Details for more
Details
8There are as many as 25 vendors vying for a job
Click on Details for more Details
8Find out who they were
Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Supply of potseal bituminous pothole patching mix Details
8Tender for supply of compressor spares Details
8Procurement of conveyor parts Details
8Procurement of kosan make electronic filling system critical OEM spares Details
8Supply, testing & commissioning of 4 no’s pensky marten’s closed cup flash point apparatus Details
8Hiring of services for obtaining crossing permissions from NH, SH, foreign utility owners, pollution control boards, etc. Details
8Procurement of MR 0280 MV power and control cables Details
8Hiring of services for all-risk protection and comprehensive maintenance contract for HVAC systems Details
8Procurement of sheet gaskets for routine maintenance of various equipment at C2C3 recovery plant, LPG plant, and HVJ compressor station Details
8Procurement of 30-inch and 36-inch spacer rings Details
8ARC for scaffolding erection and assistance works during plant shutdown and breakdown maintenance jobs at C2C3 recovery plant and LPG plant Details
8Procurement of sealants for valve maintenance under khera pipeline region Details
8Procurement of respiratory protective devices – filtering half masks Details
8Hiring of services for RoW/RoU line walking using line walking method for a period of three years Details
8Hiring of well servicing package comprising coiled tubing unit (CTU), nitrogen pumping unit (NPU), and fluid pumping unit (FPU) with heating facility Details
8Contract for testing of all power transformers at different production units Details
8Procurement of casing pipe grease API modified Details
8Procurement of pneumatic actuated globe control valves Details
8Tender for supply of know-how, BEDP, catalyst, proprietary items, and services for integrated hydroprocessing block Details
8Procurement of spares for carbon-sulphur (CS) analyzer Details
8Tender for supply of safety valve Details
8Supply of 5 nos cylindrical mesh Details
8Tender for supply of pipes Details
8Tender for construction of low height RCC culvert Details
8Tender for providing 25th filling machines at various locations Details
8Procurement of NextGen firewall (cyber security appliance) Details
8Tender for providing security & allied services at 2 locations under Siliguri DO (DGR-sponsored agencies only) Details
8Contract for security and allied services Details
8Tender for rectification and replacement of pipeline using double stopple hot tapping Details
8Tender for piping and mechanical works for PBR project Details
8Tender for support services works for physical possession of RoU/RoW land & compensation Details
8Supply of fiber reinforced plastic (FRP) warning markers Details
8Hiring of bundled services comprising cementing and mud engineering for 6 drilling wells under frontier basin project (with provision for 1 additional well) (amendment-2) Details
8Hiring services of supplying qualified & experienced professionals to be engaged temporarily at executive cadre on call-out basis in operational area (corrigendum -2) Details
8Procurement of supply of open hole logging units with tools and accessories alongwith installation & commissioning, training and AMC (non comprehensive) for 10 years (amendment-2) Details
8Supply and installation of biodiesel screw pumps Details
8Procurement of pipes for industrial applications Details
8Procurement of pyrometer swing fixture Details
8Rate contract for providing di-electric epoxy flooring inside various substations Details
8Tender for procurement of 20 nos. of CCTVs Details
8Procurement of thermowell for W-RTD IVTE 4457B Details
8Procurement of Rockmaster 4SH DN51 hose for PDV2102 Details
8Supply of Siemens LOGO 230RCE PLC for HVAC systems Details
8Procurement of RMP SRU sulfur pit pump for process operations Details
8Procurement of detachable-type conveyor chains Details
8Procurement of XLPE cable for working voltages up to and including 1.1 kV Details
8Tender for ultrasonic thickness gauging (UTG) of tanks and pipelines Details
8Procurement of strainer buttons for DM plant vessels from OEM M/s Thermax Details
8Supply of BBRAM with battery backup from OEM for EDXRF 3500 Details
8Three-year rate contract for lube oil analysis services Details
8Supply and installation of surveillance cameras along the periphery of compound wall Details
8CAMC for remote-operated high-volume long-range monitors Details
8Tender for repair and refurbishment of 02 nos. of SHW AHU2 blowers Details
8Tender for supply of centrifugal horizontal pump Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8India's ethanol consumption projected to reach 8 billion liters by 2025 Details
8Jio-BP sees 34% growth in petrol, diesel sales in July–September quarter Details
8BPCL to host global energy technology meet 2025 in Hyderabad next week Details
8India fuel price update: petrol, diesel and LPG rates on October 22 Details
8China gets tenth cargo from Russia's Arctic LNG 2 despite sanctions Details
8US exports record levels of natural gas to Mexico Details
8BPCL bets big on India’s energy transition with Rs.1.7 lakh crore investment plan Details
8India plans to start oil extraction in Western Georgia Details
8GAIL launches free CNG scheme in Jamshedpur Details
8Gasoline prices drop toward pandemic-era lows Details
8U.S. buys a token barrel to refill the strategic reserve Details
8Kazakh oilfield cuts production after Russian gas plant drone attack Details
8India’s energy demand soars: 67 million daily fuel station visits, says Hardeep Singh Puri Details
8US seeks 1 million barrels of oil for strategic petroleum reserve Details
8Oil maintains gains on supply risks and US plan to refill strategic reserves Details
8Brazil okays oil drilling in sensitive Amazon area Details
8Oil prices drop for second day as oversupply concerns at forefront Details
8Paris verdict due in TotalEnergies 'greenwashing' case Details
8Reliance grabs Middle East crude amid US scrutiny of India's Russian oil imports Details
8Oil rises on U.S. reserve refill Details
8NatGas posts biggest single day gain since 2022 Details
8Phillips 66 and Kinder plan 1st ever California-bound fuel pipe Details
8RRC announces members of petroleum theft task force Details
8North America enters rig gain streak Details
8BP confirms 11 discoveries in 2025 Details
8Petrobras to supply India's HPCL up to 6 MM oil barrels Details
8State-run oil and gas companies spend Rs.46,600 cr – 35% of FY26 capex target till August Details
8US-India trade deal: significant tariff cuts and potential shift in oil imports Details
8Mukesh Ambani's Reliance grabs Mideast oil as Russian flows face US scrutiny Details
You can also click on Newsclips for more
Details
8The licensor must cover the steam cracker plus BdEU, C4 hydrogenation, PGHU, and BTX extraction. The scope spans know-how through PGTR, including catalysts and proprietary equipment. This compresses accountability into one licensor offer.
8What is more, a single line item for 1,3-butadiene has been split into ≤130 KTPA and >130 KTPA prices. This reduces evaluation buoyancy for aggressive extraction cases. It will reshape C4 strategy in bidder BEDPs.
Click on Details for more Details
That is a lot of work compressed into a narrow window
8There is more, in another package
8And to top it all, there is a third package to deal with in this turnaround job
8And a fourth, And a fifth, and even more
8Qutie a turnaround job here
Click on Details for more Details
This was the core pipeline that triggered the gas supply revolution in India
8And the fact that the capacity is being expanded after a long time.
8And that is a commentary on what is ahead
Click on Details for more Details
8It wants licensors to co-develop its in-house naphthenic base oils process with pilots and a 200 KTPA design. The EOI pushes for hefty fee cuts, a license-fee waiver at go-decision, and royalty sharing under a joint brand. If accepted, it could reset licensor economics in India’s specialty base-oil niche.
Click on Details for more Details
8The licensor IFB locks in performance guarantees and even the arithmetic of deployment costs. Catalyst metals move to an index-anchored regime, trimming room for post-award drift. A tight deviation protocol signals fewer surprises—and sharper competition on real technology.
Click on Details for more Details
8There is a Rhodium AcAc EOI prioritises true local manufacture with ABG-guarded precious-metal procurement
8The refinery has opened a vendor-development EOI for Rhodium AcAc to support LP Oxo operations in its NBA unit. The specification locks a 38.5–40 wt% Rh band and routes precious-metal buys through ABG-secured, reconciled transactions. Guarantee waivers and PP-LC discipline will shape who can credibly participate and at what risk premium.
Click on Details for more Details
8There is a lookout for agro-residue pellets meeting geometric limits and rice husk (dry).
8What exactly is going on here?
Click on Details for more
Details
8The pre-tender pack hard-codes a 14-month schedule and part-wise L1 with a two-part award cap. Liquidity, UDIN-based proofs and notarised PTR break-ups aim to choke off credential arbitrage while keeping competition active. But with no EMD/PBG figures in sight and scope still defined at a composite level, bidders must price schedule and verification risk with limited visibility.
Click on Details for more
Details
8Project Name: Sirsa, Fatehabad and Mansa District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
8Project Name: Anand District (except areas already authorized) District City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
For reference purposes the website carries here the following tenders:
8Supply, installation, testing, and commissioning of tilting-type hydrostatic test bench Details
8Supply of ring packing 2S0216 03 Severn PDPP Details
8Supply, installation, testing, and commissioning of CCTV and accessories Details
8Tender for development of packed truck parking Details
8Tender for grid connection and net metering job Details
8Supply of natural gas commercial meters with AMR and regulators Details
8Tender for lumpsum rate contract for Package 1 HCU Part A Details
8Tender for servicing of pulled-out sucker rods from SRP wells Details
8Annual rate contract for scaffolding erection and dismantling jobs Details
8Procurement of total sediment potential analyser Details
8Procurement of digital particle counter machine Details
8Procurement of gas detector LEL TFMC Details
8Procurement of top and bottom loading arms Details
8Procurement of boiler fuels – agro-residue-based biomass pellets and dry rice husk for 2G bioethanol refinery Details
8Procurement of 12-bit 2-channel analog output module Details
8Procurement of floating suction assembly Details
8Tender for PDPP exchanger jobs for Nov–Dec 2025 turnaround (TA) Details
8Procurement of RTD BRG PT100, size 4 mm × 10 mm, for SRU-3 Details
8Design, supply, erection, testing, and commissioning of 12-station carousel and associated equipment Details
8Tender for the supply of fire proximity suit Details
8Procurement of instruments for QA mobile laboratories Details
8Tender for routine environmental monitoring Details
8Tender for conducting T4S audit Details
8Procurement of door frame metal detector (Q2) Details
8Tender for dismantling of BBU switch house transformer station no. 6 Details
8Procurement of cast iron and stainless steel dead weights Details
8Procurement of gasket seat 1134187 for Severn PDPP Details
8Procurement of instrumentation spares for HPNU expansion turbine Details
8Tender for conducting independent third-party impact assessments of three CSR projects undertaken Details
8Tender for procurement of soya lecithin Details
8Supply, fabrication, and installation of lead protection shield for CCRU & FCCU nucleonic level gauges Details
8Procurement of polyamine-based BFW (boiler feed water) treatment chemical Details
8Procurement of ammonium polysulphide Details
8Tender for supply of lab chemicals Details
8Annual rate contract for providing environmental hygiene services and other allied office services Details
8Procurement of industrial digital portable videoscope Details
8Supply of marine breakaway couplings Details
8Procurement of gear boxes for TSP dosing tank agitators Details
8Tender for conducting PNGRB T4S audit Details
8Tender for development, customization, supply, implementation, and maintenance of e-locking system Details
8Contract for annual mechanical maintenance and allied works Details
8Procurement of auto oxidation stability apparatus Details
8Tender for procurement of V-belts Details
8Procurement of couplings of M/s. Rathi TransPower Pvt. Ltd. make Details
8Procurement of 20Kg PPCP grease Conipalis for Vashi grease plant Details
8Tender for procurement of additive package Details
8Supply of spares for 48-point Flexi Speed Makeen carousel Details
8Procurement of spares of stripper bottoms pump Details
8Tender for procurement of Inconel 800HT ferrules Details
8Annual maintenance contract for expert service visits of Krohne Marshall instrument Details
8Annual maintenance contract for PMCC, DG sets, fire engines, air compressors, and electrical systems Details
8Tender for safe loading, unloading, and transportation of electrical cable drum Details
8Procurement of silicone anti-foaming agent Details
8Annual rate contract for attending steam leakage jobs Details
8Contract for inspection, repair, and refurbishment of STG-I gearbox Details
8Annual rate contract for erection and dismantling of scaffolding for EM and IM jobs Details
8Tender for pantry official expenses for customer visits, events, and higher authority visits for 2 (1+1) years Details
8EOI for reputed contractors/vendors for services in deep-water block KG-DWN-98/3 (KG-D6), East Coast India Details
8Annual rate contract for servicing and repair of solar inverters and solar PV systems Details
8Rate contract for supply of spares of KSB make pumps Details
8Two-year contract for cementing and BHP services in OIL’s Rajasthan and Western India wells (amendment-3) Details
8Tender for procurement of control valve Details
8Appointment of agency for expert services of M/s GEA Westfalia Separator Group GmbH for centrifuge operations Details
8Three-year AMC for advanced process control systems in CDU I & II, VDU I & II, and CDWU I units Details
8Tender for double earthing for all lighting poles Details
8Annual rate contract for maintenance of communication systems Details
8Supply and installation of rooftop solar power plant for ONGRID system Details
8Annual rate contract for screw air compressor spares Details
8Procurement of LED lights and other miscellaneous equipment Details
8Procurement of carbon steel tube Details
8Tender for procurement of transmitters Details
8Tender for third-party assessment and certification of ERDMP document for Panipat marketing complex Details
8Tender for procurement of all-in-one PC Details
8Tender for transportation of oil-well cement using truck-mounted mobile silos from NIA, Duliajan to drilling/workover locations Details
8Annual maintenance contract for 5 nos. Cummins make fire engines for 3 years Details
8Procurement of 6-inch pressure relief valve for hydrant line Details
8Tender for inspection, maintenance, and servicing of columns in train III sulphur recovery unit (SRU) complex Details
8Tender for procurement of speed breaker Details
8Tender for inspection, maintenance, and internal servicing of diesel hydrotreater (DHT) columns Details
8Tender for inspection, maintenance, and servicing of ejectors and silencers in new hydrogen generation unit (NHGU) Details
8Tender for comprehensive inspection, hydrotesting, and maintenance of ISBL process piping for CDU-3 and VDU units Details
8Supply of proximity switch assembly with multiple position sensors Details
8Tender for procurement of control valves Details
8Tender for collection, transportation, analysis, and environmentally safe disposal of hazardous industrial wastes Details
8Providing pickup facility for Ahmedabad LPG plant staff Details
8Supply and installation of flameproof exhaust fan for battery room of RCP Details
8Annual rate contract for expert supervisory services for maintenance and troubleshooting of MS Frick India Limited make compressors installed in N2 plant Details
8Supply of 122±212wt.% liquid sodium hypochlorite in drums to HRR Details
8Procurement of 3.5 × 42sq2mm EPR cable Details
8Procurement of wheeled foam compound trolley 200/210 L for SRPL Details
8Procurement of spares for Elliot Ebara make drive turbines Details
8Annual rate contract for general electrical maintenance works Details
8Tender for miscellaneous electrical works at colony phase 1, phase 2, and bachelor accommodation Details
8Tender for replacement of thermal insulation of exhaust stack of TPP PGC A Details
8Hiring of structural audit agency for the KV school Details
8Tender for replacement of crude heater bends of Tatipaka mini refinery Details
8Tender for fabrication and supply of chiller barrel of NQP CHU 3 Details
8Tender for repair of exhaust elbow assembly for PGC-A Details
8Tender for supply of 400 watt LED lights Details
8Provision of services for preparation of water audit report Details
8Annual maintenance contract for data logger, accessories, and online data connectivity Details
8Supply of spare parts for top gear box of boiling house on door delivery basis Details
8Tender for standing order/rate contract for supply of EDP spares and consumables on door delivery and call-up basis Details
8Hiring of PMC services for capacity augmentation of DUPL DPPL project Details
8Rate contract for CIPL on-off CAT and DCVG survey of pipelines under HVJ network Details
8Tender for maintenance contract for miscellaneous civil work Details
8Design, engineering, manufacturing, procurement of materials and bought out components, assembly Details
8Supply of fasteners for RTA 2027 and routine maintenance Details
8Annual rate contract for internal & external painting of oil storage tanks and off sites pipelines during tank M&I Details
8Tender for repair & replacement of rain water down take pipes and rain water gutters Details
8Procurement of low alloy steel heat exchanger Details
8Tender for supply of PPU peroxide Details
8Engagement of contractor for renovation of 12 rooms at INSA guest house Details
8Tender for procurement of fasteners Details
8Expression of interest (EOI) for technology licensors for license and technology supply Details
8Tender for material handling services for job B933 and job B957 for Bina petrochemical and refinery expansion project Details
8Tender for supply of nickel-cadmium batteries and battery chargers for PDH-PP plant with ethane and propane handling facilities project Details
8Supply of strainers for PDH-PP plant with ethane and propane handling facilities project Details
8Tender for composite works for Visakh–Raipur pipeline project Details
8Supply of know-how/license, basic engineering design package (BEDP), catalyst, proprietary items, and related services for delayed coker unit Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8REI Expo 2025 to attract more than Rs. 1,800 crore investments in India’s biogas sector: IBA Details
8Reliance Industries’ Rs. 1.5 lakh crore new energy venture to boost revenue from next year Details
8India plays its own energy game: balancing Russian oil, US pressure, and strategic autonomy Details
8US says India halves Russian oil imports, sources say no cuts seen Details
8India’s Russian oil import rebound in October after dip in previous quarter Details
8Nigeria’s Dangote Refinery says crude inflow reduction driven by high prices, not faults Details
8Oil set for weekly loss as global conflicts ease, signs of glut emerge Details
8Uttarakhand High Court lifts 31-year-old Centre ban on contract workers in ONGC Details
8GAIL signs pact to set up CBG plant in Bengaluru under tripartite agreement Details
8MEIL wins $225.5 million gas sweetening project from Kuwait Oil Company Details
8Russia continues to ship oil to India: deputy foreign minister Andrey Rudenko Details
8Oil settles at five-month low as supply glut fears mount Details
8Desco Infratech, KPI Green Hydrogen and Ammonia join hands for hydrogen–natural gas blending Details
8Oil prices slip on concerns over US-China trade tensions Details
8Ukrainian drones hit key Russian gas plant as Trump suggests Kyiv may cede land for peace Details
8India opens 99% offshore area for oil and gas exploration amid energy diversification strategies Details
8Uttarakhand High Court quashes 1994 ban on contract workers in ONGC, cites violation of Contract Labour Act Details
8How India is playing its oil-buying game Details
8India’s Russian oil import rebound in October after dip in previous quarter: Kpler data Details
8Venezuela revives coal as oil remains off limits Details
8Kurdistan’s oil exports top 200,000 bpd amid fragile new deal Details
8Ukraine strike on Orenburg plant exposes Kazakhstan’s gas reliance on Russia Details
8Tanker explosion off Yemen deepens Red Sea security fears for LPG trade Details
8Brent flirts with $60 as oversupply fears deepen Details
8Petrobras signs contract to sell six million barrels of oil to Indian state-owned company Details
8India’s pivot? Agreements signed for oil imports from the U.S. Details
8Russia continues oil shipments to India, TASS cites foreign ministry Details
8EIL Women’s Forum organised Diwali Mela at Gurugram complex Details
8BPCL women leaders were honoured at IndianPSU Nari Shakti Samman Awards 2025 Details
8Trump’s India squeeze to push Russian oil further into the shadows Details
8Trump vows to keep ‘massive’ tariffs on India until Russian oil imports cease Details
8New $11 billion Indian refinery plan reinforces the positives for tankers Details
8Reliance Industries posts consolidated Q2 FY26 PAT at Rs. 18,165 crore Details
8GAIL signs concession agreement for setting up an MSW-based CBG plant in Bengaluru Details
8Desco Infratech inks MoU with KP Group for hydrogen–natural gas blending projects Details
You can also click on Newsclips for more
Details
8Gujarat Gas Limited shareholders approve composite scheme of amalgamation [GGL] Details
8India's oil & gas sector sees widespread production shortfalls in September [MOPNG] Details
8Cambay PSC update [Synergia] Details
8Public notice for the commencement of the e-filing portal [PNGRB] Details
8G E Shipping contracts to sell its 2005-built medium range product tanker “Jag Pooja” [GES] Details
8Change in senior management [CSL] Details
8Resignation of chief financial officer of the company [IRM] Details
8Intimation regarding delivery and mobilization of vessel “SEAMEC III” for charter [Seamec] Details
8Intimation regarding breakdown of vessel “SEAMEC SWORDFISH” on October 17, 2025 [Seamec] Details
8Completion of tenure of independent directors Dr. Sudhir Kumar Jain and Shri Bhadresh Mehta of Gujarat State Petronet Limited [GSPL] Details
8Appointment of Shri Jayant Misra, IRS (Retd.), as independent director of Gujarat State Petronet Limited [GSPL] Details
8Q2 FY26 financial results presentation [RIL] Details
8Consolidated financial results for the quarter ended September 30, 2025 [RIL] Details
8Execution of sponsor support undertaking by GAIL for Talcher Fertilizers Limited [GAIL] Details
8GAIL signs concession agreement for setting up an MSW-based compressed bio gas plant in Bengaluru [GAIL] Details
8Company scheme application (C.A./CAA/MB/220/2024) filed by Talwandi Sabo Power Limited with NCLT [Vedanta] Details
8Change of R&T agent for connectivity for Bharat Petroleum Corporation Limited [BPCL] Details
Details
1) Foam system overhaul on ARN & SKO tanks tightens schedule and quality screws in ONGC Hazira
8ONGC Hazira’s foam-system retrofit hard-codes a 15-day mobilization inside a 180-day completion clock and links cashflow to commissioning.
8Dual LDs and chargeable retests push first-time-right execution under OISD-116.
8But an SCC-GCC timeline mismatch could be the sleeper risk bidders must price in.
 
 2) Cycle-tight gas detector maintenance hard-codes dual LDs and cash-flow discipline in ONGC Cauvery Asset
8ONGC Cauvery Asset’s three-year calibration plan forces six-monthly cycles with installation-wise accountability.
8Dual LDs for mobilisation and completion raise the cost of delay while an option clause gives room to scale.
8No advances and a long ePBG push financing onto vendors, reshaping who can compete.
 
 3) World Fire wins Tripura drilling fire-tender hire, L2 trails by 16.2% in OIL Frontier Basin Project fire tender
8OIL has closed a three-year hire for a fully kitted multi-purpose fire tender to shadow its Tripura drilling campaign.
8
The spec loads in UHP mist, SCBA redundancy, and crew standards more common to downstream plants than remote pads.
8A two-horse race left L2 at a 16.2% premium, raising questions on crew logistics and inventory risk that the market will parse behind the wall.
 
Click on Details for more
Details
8The award locks in a relocatable API 674 pumping fleet to unblock injectivity at eight wells without fixed lines.
8A tighter telemetry regime and DO-linked penalties could reshape contractor practices on dosing and uptime.
8The price curve shows a sharp mid-pack step-up and an extreme outlier, raising questions on risk loading that the market will parse behind the scenes.
Click on Details for more
Details
8Find out what it is
Click on Details for more
Details
1) Butene-1 licensor bar tightened with cross-border proof and 20-week BEDP clock
8BPCL has opened licensor selection for a 50 KTPA Butene-1 unit with strict global reference criteria. The IFB compresses BEDP to 20 weeks from kick-off and fixes a 12-month bid validity under a CPP-only process. Catalyst swaps are allowed, but only with proven alternate references and one-year operating proof.
 
2) BPCl’s Ramayapatnam Phenol unit licensor race sets 24-week BEDP clock and export-proven BQC filter
8BPCL has drawn a hard line on licensor credibility and schedule for its Ramayapatnam phenol unit. A 24-week BEDP and strict non-home-country ≥100 ktpa references narrow the field to a handful. The payoff lies in who can pair guarantees with lowest lifecycle NPV.
 
3)
L1 at 21% below estimate splits the field in BPCL AP refinery ODC/OWC survey
8A three-month cap and no reverse auction created a clean, SOR-anchored price war. One bidder dived 21% below estimate while three clustered near Rs 10 lakh. The structure signals speed over ceremony for early-works logistics.

Click on Details for more
Details
8FInd out what it is
Click on Details for more
Details
1) BPCL’s Bina petchem expansion seeks six-riser, 155 m demountable flare under strict eil standards
8The flare brief is big on maintainability and hazardous-area discipline, light on civil. A six-riser, shared-derrick architecture with high-load legs tightens integration risk. KOD pumps as FIM tilt capex, but the commissioning clock still bites.
 
2) IOCL Panipat PBR cooling water composite bid pushed through four extensions to mid-November
8The cooling water network package for IOCL’s PBR project has slipped from an 18 August close through successive addenda. Each push appears tied to tightening technical baselines and refinery-adjacent HSE governance. The final stretch into November could improve bid quality—but risks utility-path compression later.
 
3) MRPL pushes SAF certification bid close to 20 Oct with two micro-extensions
8MRPL has twice extended its ISCC-CORSIA consultancy bid, nudging the close from 13 October to 20 October. The securities, PQC, and milestone structure remain intact. The move looks designed to improve bid quality in a documentation-heavy, audit-critical scope.
 
4) GAIL’s 12.6 TPD CBG PMC tender pivots pre-bid online and sets high experience bars
8GAIL has moved the pre-bid to MS Teams and anchored clarifications in the ATC pack. The BEC demands prior PMC/EPCM experience on unusually high-throughput CBG plants. With no EMD but strict document authentication, only battle-tested advisors are likely to make the cut.
 
5) Eight bid extensions stretch BPCL Mahul–Rasayani HDD tender to 30 October, signaling rig-readiness and compliance friction

8BPCL’s HDD package for Mahul–Rasayani has slipped eight times from a mid-July target to 30 October. The scope and BQC remain unchanged, but rig documentation and verification demands raise the entry bar. The bid pool could deepen—or consolidate—depending on who lands compliant Category-1 assets in time.

Click on Details for more
Details
Three make the technical cut for SAC facilitation at Hathua LPG hub
8BPCL’s Hathua LPG hub consultancy pushes a dense SAC checklist into a 90-day window with 100% payment on final approval. GeM shows EMD switched off even as the ATC frames an EMD regime, a tension bidders cannot ignore. With four bidders and three qualified, watch how balance-sheet stamina prices regulatory uncertainty.
Click on Details for more
Details
8Find out why that is so
Click on Details for more Details
It is easy to get month-old import data but it is difficult to solicit forthcoming shipment information in India. We go through a laborious process of data collection to get you full import information, including company-wise, quantity-wise, port-wise, vessel-wise cargoes which are coming into India in the next 15-to30 days.
Get the daily updates for :
8LNG
8Crude
8Chemicals
8Fertilizers
8Coal and Coke
8LPG
8Ammonia
8All tankers
8Bulk and Dry cargo
Click on Reports for more. Details
8Here's what's happening today in the E&P, midstream-downstream, and CGD section
Click on Reports for more Details Details
For reference purposes the website carries here the following tenders:
8Tender for pneumatically operated hydraulic pump Details
8Tender for supply of firefighting equipment Details
8Tender for PNGRB T4S audit for Siliguri terminal Details
8Procurement of Flowmore pumps spares Details
8Annual rate contract for hiring of audio-video and lighting system Details
8Supply of complete cartridge double mechanical seal Details
8Tender for market study of polyester industrial yarn derivatives Details
8Supply of complete charge of hydro-treating catalyst for DH DS unit Details
8Supply of demulsifier for low-temperature application for N G crude tank dehydration Details
8Tender for cooling tower repairs in HVAC system Details
8Tender for supply of turbine spares Details
8Supply of complete electric heater assembly as replacement for Reboiler-5 Details
8Tender for procurement of cartridge filter Details
8Tender for Air Liquide nitrogen unit cold box – valve HCV 104 Details
8Tender for procurement of sulfur pit ejector Details
8Supply, installation, testing, and commissioning of high mast lightning towers Details
8Procurement of M/S ROTO Pump Pvt Ltd pumps spares Details
8Tender for procurement of gate valve Details
8Tender for supply of Swelore pump spares Details
8Annual maintenance contract for network security devices Details
8Supply of Swagelok make union elbow Details
8Annual maintenance contract for troubleshooting field services diagnostics jobs for non-intrusive online remote sensing thickness monitoring system Details
8Tender for expert services of M/s Valmet Flow Control Private Ltd. required at HGU PSA unit Details
8Supply of soft silicon bellows in PP unit Details
8Supply of Rathi make coupling spares Details
8Tender for supply of wall tube hanger for type-J Details
8Procurement of pump spares from M/s. Mather & Platt Details
8Tender for carrying out structural health assessment of buildings & RCC structures Details
8Tender for supply of spares for access control system Details
8Tender for engagement of design consultant for design & development of blow mould container packs for premium servo grades Details
8E-tender for bottling and allied jobs Details
8Comprehensive annual maintenance contract of hyper converged infrastructure solution Details
8Annual maintenance contract service for robotic drum filling at PDPP Details
8Tender for OEM service for Olikkara tower lights Details
8Tender for operation and maintenance of telephone line and EPABX system Details
8Tender for total basic supply price on FOT dispatch point basis Details
8Annual maintenance contract for expert supervision services for troubleshooting and overhauling of Nash supplied water ring compressor Details
8Procurement of diffuser plate for CP292 pump Details
8Tender for fire fighting equipment maintenance Details
8Supply and installation of air dryers Details
8Procurement and contract services (pipeline) at ‘A’ installation, Sewree Fort Road, Sewree (E) Details
8Annual rate contract for Swelore make positive displacement pumps Details
8Comprehensive annual maintenance contract of solar energy power plants Details
8Three-year rate contract for PDPP tank repair jobs Details
8Procurement of instrument and control cables Details
8Procurement of gaskets from OEM MS Flexitallic Details
8Annual rate contract for service for Yokogawa DCS/PL Details
8Tender for IRC for maintenance of air conditioners & refrigerators under G. Konduru jurisdiction Details
8Annual rate contract for calibration of mechanical measuring instruments of GREP plant for three (03) years Details
8Annual rate contract for mechanical maintenance of three (03) heat recovery steam generator boilers Details
8Procurement of PSVs for GPU & GCU2 plants Details
8Hiring of 12-hour duty vehicle with 3000 monthly fixed KMs Details
8Procurement of protective suits (low temperature) Details
8Procurement of insulated tools for SS#41 in PP plant Details
8Hiring of canteen & pantry services for GAIL Eastern Region Headquarters, Ranchi for 2 years Details
8Tender for annual rate contract for external safety audit (ESA) of COCO CNG stations Details
8Tender for additional AC & DC interference mitigation works of VSPL Details
8Rate contract for mechanical testing and metallurgical analysis of failed samples Details
8Procurement of valves for execution of MOC in GCU-II unit Details
8Hiring of services for supply of 20 litre packaged drinking water jars/cans for various offices Details
8Annual rate contract for repair and maintenance jobs in cone/dome roof hydrocarbon storage tanks Details
8Tender for maintenance and housekeeping of ERMC building Details
8Tender for supply of loading arms Details
8Tender for renewal of secure internet gateway Details
8Annual maintenance contract for RTDBMS Details
8Supply of GA temperature sensor (0–200°C) with field-mounted case compensation Details
8EOI for procurement of Design B industrial & electrical safety shoes for Mehsana asset employees (2024-25) Details
8Hiring services for establishing microgrid solutions (Corrigendum-2) Details
8Tender for fabrication supply and installation of condenser units Details
8Supply of know-how, BEDP, catalyst, proprietary items & related services for Butene-1 unit Details
8Supply of know-how, BEDP, catalyst, proprietary items & related services for Phenol unit – Refinery Cum Petrochemical Complex Details
8Hiring agency for conducting satisfaction survey for GAIL Gas Limited Details
8Tender for procurement of ceramic balls Details
8Tender for supply of advanced fire monitor Details
8Tender for repair or refurbishment of exciter rotor of M/s BHEL make generators Details
8Contract for security and allied services Details
8Tender for revamping of washing unit with filtration system Details
8Tender for retubing repair of II stage aftercooler of H.P-D compressor Details
8Tender for disposal of oily sludge from Refinery-III Coke dome pit Details
8Rate contract for the period of 2 years for comprehensive AMC of UPS system Details
8Procurement of spares required for Tanka and make instruments Details
8Tender for demountable flare package for Bina Petchem and refinery expansion project Details
8Tender for repair of fire tube of Heater Treater-A of Sobhasan CTF Details
8Supply, installation with modifications, testing and commissioning of semi-fixed foam systems of ARN and SKO tanks Details
8Procurement of sodium dichromate Details
8Procurement of methyl nonadecanoate Details
8Tender for procurement of laminates Details
8Tender for supply of fittings Details

You can also click on Tenders for more
For reference purposes the website carries here the following Newsclips (These are public domain newsclips and the website is not responsible for their content):
8What are green hydrogen hubs? Indian maritime puts clean energy in the forefront Details
8Hydrogen bus trials begin in Pune under National Green Hydrogen Mission Details
8U.S. urges Japan to quit Russian LNG imports Details
8New Mangalore Port to get boost with 8 maritime project Details
8Natural Gas: The LNG Boom that’s Pricing Out American Consumers Details
8India Power Regulator launches insider trading probe Details
8EIA confirms US crude oil inventories are rising Details
8Russia's fuel crisis spills into Central Asia Details
8India set to boost LPG imports from U.S. Details
8Prime Minister Modi inaugurates Indian Oil’s LPG bottling plant in Chittoor Details
8Petrobras to sign major oil supply contract with India Details
8Next-gen “RE” forms: How reforms can transform India’s energy transition Details
8Russia claims it’s offering top-grade oil at bargain prices to countries Trump is courting Details
8Mangalore Refineries and Petrochemicals seeks cheaper oil amid US pressure, aims to continue Russian imports Details
8China warns of ‘firm countermeasures’ over US sanctions threats, defends Russia oil imports Details
8UK sanctions Gujarat oil refinery: There should be no double standards on energy trade, says India Details
8PM Modi launches development projects worth Rs.13,430 crore in Andhra Pradesh Details
8India refiners to buy more US LPG in 2026, cut Middle East imports, sources say Details
8Russia backs India’s ‘national interest’ stance after US claims Modi agreed to stop Russian oil Details
8MRPL announced Q2 results in its 271st meeting Details
8Indian auto makers look for alternatives as China tightens EV tech export Details
8Opposition parties question PM’s ‘silence’, say key decisions outsourced to US Details
8Russia confident of continuing energy trade with India: Deputy PM Novak Details
8India already cutting Russian oil imports by 50% after US talks, White House official says Details
8India refutes Trump’s claim on halting Russian oil purchase Details
8Can India really stop Russian oil purchase? What are the options before it? Details
8Indian refiners buy first Guyanese oil from Exxon: Report Details
8Understanding India’s oil trade with Russia | Number Theory Details
8Cheap oil, high stakes: Can India do without Russia? Details
8Chiyoda and Toyota partner to build water electrolysis system for hydrogen project in Japan Details
8KP Group to invest Rs. 8,000 crore on hydrogen and EV fuel stations in Gujarat Details

You can also click on Newsclips for more
Details
8Project Name: Arwal, Jehanabad, Bhojpur and Buxar Districts City Gas Distribution
8Project Cost: Rs 350 crore Click here for more details Details