There is an attached gas gathering station coming up and RFQs are to be floated by March, 2017 for: 8Manifolds 8Headers 8Piping system 8Test separator 8Production separator 8Test tank 8Production tank 8Oil Transfer pump 8Flare stack system Click on Details for moreDetails
There will also be an early production system involved. And RFQ s are expected to be released in March, 2017 for the following equipments: 8Stabilizers 8Heat Exchanger 8Crude Export Air Cooler 8Pumps Skids 8Crude Metering Skids 8Heaters 8Flare Stack 8Vent Stack 8Degassing Units 8Slug Catchers 8Scrubbers 8Stripping Columns 8Knock Out Drums 8Fuel Gas Conditioning Skid 8Desalters 8Gas Boots 8Manifolds 8Flow Back Package 8Fuel Gas Conditioning Skid Click on Details for moreDetails
A major refinery shutdown is coming up 8The shutdown will begin from mid-February to March, 2017 8The company is still figuring out the equipment repair and replacement list 8As and when the list is prepared, we will keep you posted on the requirements> 8The usual maintenance work requirements will of course be there Click on Details to find out the more details including of the refineryDetails
For the benefit our business development subscriber base, we believe in catching projects well before they come to the tendering stage. 8That way a manger has a longer time period to work on relationships that will eventually transform into orders. 8For some, the longer the lead time, the better it is. 8Contractor selection for a 2000 km plus gas pipeline is slated sometime in June-July, 2017 8Environmental clearance is expected in 2018 and project completion is slated by December, 2020 Click on Details to find out moreDetails
For reference purposes the website carries here the following tenders: 8Leakage repair of manifold line & separator lines, ONGC Details 8Supply of line pipe-PVPL Details 8Supply of SS Pipe under Third Party Inspection with MTC as per Specifications Details You can also click on Tenders for more For reference purposes the website carries here the following News Clips: 8Where India’s and China’s energy consumption is heading Details 8India has emerged as a new engine of global growth: Petroleum Minister Dharmendra Pradhan Details 8Crude oil prices remain static on uncertainty over planned production cut Details 8Saudi Aramco's novel technology to help find new oil fields Details 8Oil companies shoulder pain of downturn with lower output Details 8Flash fire at Reliance Industries' Jamnagar refinery; 8 workers injured Details 8Affordable energy fuels India's growth: Dharmendra Pradhan Details You can also click on Newsclips for moreDetails
A national and global slowdown in key verticals have forced L&T to cut a massive 14,000 jobs 8The $16-billion diversified conglomerate said on Tuesday the step was an attempt to “right size” its strength in the face of business slowdown. 8Among other reasons, digitization of operations also caused redundancies that led to downsizing, thus raising the specter of jobless growth of the Indian industry. 8Weak industrial demand and low capacity utilization continue to challenge the business environment, with revenues impacted by lower offtake in construction and mining equipment, delayed defence ordering and end-stage execution of current realty projects 8Q2 margins have been adversely affected by inventory write down in shipbuilding and cost overruns as well as under-recoveries in the metallurgical and material handling business 8Yet the hydrocarbon segment of the company seems to standing up pretty well despite the slowdown, making up 14% of the order inflow whereas it makes up just 8% of the total order book. 8Some credit goes to L&T aggressive hydrocarbon marketing teams not just in India but across the world where it has earned a reputation for good work. Click on Reports for full detailsDetails
The RFQs are out for an EPC contractor for a big 630 km gas pipeline project 8The pipeline diameter will stretch from 30 to 12 inches 8There is strict commissioning deadline of 17 months 8The minimum networth of Rs 250 crore Click on Reports for moreDetails
The website carries here the full data set on the Indian LPG industry in terms of: 8Number of bottling plants and bottling capacity 8Number of LPG Distributors 8Detailed Packed domestic LPG Sales 8Number and distribution of of Auto LPG Dispensing Stations (ALDS) 8LPG domestic customer population 8New enrolments 8DBC customer population 8DBC enrolments 8Waiting list of customers 8BPL customers covered under various schemes. Click on our Database for more Details
Are the finances of Shapoorji Pllonji Infrastructure Capital Company Pvt Ltd going to be stretched by the setting up of its LNG terminal? 8There is some consternation over the fact that the company's portfolio is skewed towards projects that are under implementation and funding requirement is high. 8A Special Purpose Vehicle of the company is setting up the LNG terminal. 8There is talk that the company may have to sell some assets in order to be able to meet the finding requirements pf some of its high gestation projects. Click on Reports for moreDetails
City Gas Distribution companies seem quite worried about competition using their infrastructure to market PNG and CNG once their exclusivity periods come to an end. 8The worry emerges from the regulator's attempt to fix third party access rights and transportation rates for CNG and gas shortly. 8There are worries that PNGRB may try and benchmark costs on normative basis without taking into account actual costs, particularly the high cost of land acquisition in some cases 8The post tax rate of return at 12% set by the regulator has been found to be too low, and most companies want the return raised to 14 or 15% 8There are worries that benchmarking of costs will not take into account the additional capex of last mile connectivity of domestic PNG networks 8Those who think of making an entry into lucrative city gas markets through third party common carrier arrangements must be careful before going in, because existing entities are capable of raising non-tariff barriers or using the legal system to hold up connectivity Click on Reports for a summary of all the views that have poured in on the PNGRB;s draft regulations on third party transportation rates in CGD networksDetails
After drilling a few exploratory wells in the three blocks awarded to it, an Indian private company seems to have decided to call it quits. 8It has decided to walk away from its Minimum Work Programme 8According to sources, the company has decided to shut shop and get out of the oil & gas business 8Looks like there may be delays in the payment of outstanding dues for equipment and service providers Click on Details for moreDetails
For reference purposes the website carries here the following tenders: 8Hiring of third party inspection agency for B-127 cluster pipeline project retender Details 8Construction of storage tank and bore well at ‘MSAA’ EPS in Krishna area (Bantumilli block). Sh(i): drilling and boring of 2 nos. of tube wells of 300mm dia meter including lowering of casing at MSAA-EPS. Sh(ii): construction of storage tank of 300 cum capacity at MSAA-EPS Details 8Truck mounted Hydrostatic Coring Drill rig having capacity to drill 1000 meters (Minimum) in "N" series wireline drill rods.(10 NOs.) Details 8Alloy steel rolled Round Bars of different Diameters Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Subhash Chandra, Dilip Shanghvi in race for oil blocks Details 8Realtor becomes wildcatter in India’s crude oil hunt Details 8Dharmendra Pradhan says oil & gas block fields to be awarded by end-2016 Details 8BPCL to export light diesel oil in rare move, industry sources say Details 8Oil prices edge up on anticipation of OPEC-led production cut Details 8CBI raids office, residence of Indian Oil Corp's manager in Bhopal Details 8Three foreign oil companies keen on hiring strategic oil storages Details You can also click on Newsclips for moreDetails
There is a Rs 400 crore onland exploratory programme coming up early next year RGQs are coming up for: 8DG sets (3 Nos.) with High stacks will be floated by Feb-2017 8Water Pumps by Feb-2017. 8Mud Pumps, motors, liner pits, other pumps, blow out preventers, mobile ETP, solar evaporator and acoustic enclosures by February, 8Motors will float by mid of Feb-2017. 8RFQs are to be floated in March, 2017 for rigs, casing pipes, consumables and spaces Click on Details for moreDetails
RFQs for material and equipment requirement for a 200 plus km product pipeline by Nov. 2017 8Environmental clearance expected around September, 2017 8The contractor selection process will begin earlier by May-June, 2017 8The cost of the project is going to be closer to Rs 500 crore Click on Details for moreDetails
As an equipment and service provider, do you some innovative environmental protection solutions for the E&P industry? 8If so, now is the time to step in as ONGC is planning to overhaul its air, noise, water and land protection safeguards 8Air handling units are going to be in, as will be noise and particulate matter reduction equipment 8Mobile ETPs are in, even for small drilling holes 8New technology and drilling methods are also be surveyed, and if you are a supplier, this is the time to pitch in 8An Experts Technical Meeting will finalize all of this by around April, 2007 So there is little time to waste, click on Details for moreDetails
By and large India's onland oil and gas investments have not been impacted by the fall in prices 8But some investments have been put on hold until the price line shows an upward curve 8An Early Production System along with complete processing facilities in an onland field has been put off because of unfavorable ecoonomics Click on Details and on Reports for more Details
EPC contractors are being sought for a new gas processing terminal 8The capacity will be around 60 mmscmf 8The CGR will be of around 120 bbls/mmscf and WGR for 20 bbls/mmscfd The following are the requirements: 8Well fluid receiving facility 8Gas cooling and separation system 8Dehydration and reclamation centre 8Hydrogen dew pointing system 8Gas export system 8Condensate stablization system 8Condensate storage and export system 8Produced water treatment centre 8Utility systems 8Power generation and distribution system 8Associated infrastructure Click on Reports for more
Details
Engineers India Ltd is riding high with an order book position that is the highest in five years 8The domestic refinery modernization and expansion projects are a big addition to the company's order book 8But the company is still to tie up a few of these projects. 8It is eying the fertilizer sector in a big way too 8Find out which are the projects that the company does not have in its bag and it intends to bag in the current year and in the next 8Business development managers too must know which are the projects where EIL will be a very strong contender. Click on Reports for more
Details
Petronet LNG Ltd is the favored stock among analysts in the petroleum sector 8The company's margins and volumes have surged in recent times 8What is more the margins are sustainable in the long run 8Marketing margins are normalising after renegotiation of the RasGas contract. Incremental contracts from the expanded capacity at Dahej are mostly service contracts, which carry no risks of marketing margin loss for PLNG. 8Margins could see structural improvement over FY17-FY19, as volumes improve along with tariffs. Find out more Details
If Indian companies promoting clean energy as well as energy efficiency projects can now tap into a $ 100 million international loan facility 8This facility has been drawn up for emerging economies and Indian companies can qualify. 8The process for loan entitlement is rather simple and can suit companies which are looking at a larger financing pool Click on Reports for more
Details
The Welspun Group is one of the world's largest producers of high quality line pipes 8But the fall in E&P capex and the march of rewewal technology along with volatility in steel prices and severe competition have forced the company to look at a "sustainable" growth scenario for the future. 8The big question is how to survive and thrive as a pipeline manufacturer in an increasingly uncertain world Click on Reports to find out more on what the company is planning to do
Details
The DGH had received a total of 134 e-Bids for the 34 contract areas under the Discovered Small Fields (DSF) Bid Round 2016 8This is a big pat on the back for the petroleum ministry as such an enthusiastic response was not expected 8Clearly there are players who want to still replicate the success of Cairn, Reliance, Jubilant, Videocon , Essar and a few others who make it big while starting small. 8Out of the total 134 e-bids received, 120 e-bids were received for onland areas and 14 e-bids were received for offshore areas. 8As many as 42 companies (Individually or as member of the bidding consortium) have participated in the bid round. Click on Reports for more
Details
While one scenario looks at continued use of coal -- by using high technology ultra super critical turbines -- by the Indian power sector, another sees a dramatic decarbonization of the sector. 8If the world were to stay within the 1.5-2% climate change target, there will have to be an unexpected decarbonisation of the Indian electricity grid, with coal fired power generation falling from 75% in 2014 to 52% by 2040, and a radical 12% by 2040 under what is called the "450 Scenario". 8Following the well-established path of transformation evident in China, India's planner may look at rapid grid and energy efficiency gains combined with diversification from coal into all alternative sources available. 8Beyond the policy implications of the energy-water nexus plus the health and climate change drivers, the financial driver of increasingly cost competitive renewable energy has become clear over 2016. 8A second key economic motivation for India improving domestic self-sufficiency is that India’s oil and gas imports are forecast to drain an annual US$460bn from the economy by 2040, an unaffordable sevenfold increase on US$65bn in 2015. Click on Reports for more
Details
One of the biggest boost gas in India can come from the power sector. But the website carries here two different scenarios, both of which do not see gas playing a big role in India 8One believes that ultra super critical technology which will burn coal more efficiently will resolve India's carbon emission problems arising out of its need for more power generation capacity. Another view point believes that India's renewable energy thrust will plug the gap. 8The use of sub-critical and super critical coal technology in the power sector may come under the lens of the government because of high carbon emissions 8The Indian government is now a signatory to bringing down emissions and it will have to look carefully at the coal option to generate power. 8But new ultra super critical low emission power projects can be a preferred option for power generation if gas prices continue to remain unaffordable Click on Reports for more
Details
Demonetization will hit gas sales in the industrial segment, according to initial reports. 8Utilization in many small industrial units are likely to decline initially before things improve 8Some gas suppliers are feeling the pinch more than others 8But the outlook may be positive as supplies of coal and even some volumes of liquid fuel in cash is curbed 8Volume decline in the industrial sector had been a concern due to low priced competing fuels resulting from sharp fall in the price of crude 8Find out more on how demand shrinkage has hit one prominent gas supplier very badly Click on Reports for more
Details
Business development opportunity is coming up for a big Rs 1300 crore onland field development project 8The field development plan is to be submitted in February, 2017 8Sources said that the environment clearance is expected thereafter Click on Details to keep up to date with the developments
Details
Tenders for pipeline material for an approximately 70 km branch product pipeline is expected to be floated in the by January, 2017 8Site work will start soon thereafter The following are the main requirements 8T-Point facilities 8Delivery facilities 8Telecommunication and cathodic protection system 8SCADA system 8Line pipes Click on Reports for more
Details
RFQs are to be foated by January, 2017 for a Rs 40 crore infield pipeline system in an onland E&P project. 8The network will carry gas to the gas gathering station Click on Details for more about the project
Details
RFQs are expected around mid-February, 2017 for another infield gas pipeline project in an onland block 8The cost of the project is also pegged at Rs 40 crore Click on Details for more information
Details
RFQs for basic engineering for a refinery expansion project is likely to be floated in two months from now 8The basic engineering work will have to be completed within six months 8The total project cost has been estimated at around Rs 3500 crore Click on Details for more
Details
For reference purposes the website carries here the following tenders: 8Hiring of third party inspection agency for B-127 cluster pipeline project retender Details 8Industrial Painting Work of SRU Ph-I, II & III Through Paint Manufacturer On Supply and Apply Basis at ONGC Hazira Plant, Surat. Details 8Hiring of Services for Pipeline modification & hook-up jobs for integrating existing and upcoming process facilities at Odalarevu Onshore Terminal Details 8Dismantling, testing, servicing, repair, calibration, certification& re-installation of Pressure Safety Valves and relief valves of onshore terminal & GCS (Gas collecting station) at Odalarevu Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Trump’s Day 1 plan to fire up US shale gas and “clean coal” industries Details 8Oil & gas bids lose steam as big firms like RIL, BP fight shy Details 8Minister: Indian refineries owe over $2b oil dues to Iran Details 8Petroleum ministry to enhance safety measures for first-time domestic cooking gas consumers Details 8'PM Narendra Modi should give statement on reports that former Gujarat energy minister had interest in oil companies' Details 8Demonetisation: GAIL (India) stock flow comes to a screeching halt Details You can also click on Newsclips for moreDetails
For those looking for business development opportunities on the Jagdishpur-Haldia/Bokaro-Dhamra gas pipeline project, the website carries here the full details. 8Progress made so far is tabulated 8The ancillary industries which will come up are also documented and this will create further downstream business development opportunities 8The pipeline itself will require dedicated business development resources from equipment and service providers 8We an also provide dedicated analyst support to our subscribers to provide specific future business development intelligence. Click on Reports for moreDetails
IOC has joined hands with SBI to set up banking facilities in its 6500 Kisan Seva Kendras in rural and remote areas of the country 8The website carries here the full details of the scheme 8Also carried here is the state-wise distribution of IOC's KSKs Click on Reports for more Details
For reference purposes, the website carries here the following pricing details: 8Retail selling price revisions since 2013 for: 8Petrol 8Diesel 8SKO 8Subsidised LPG 8Non-subisidsed LPG Click on Reports for moreDetails
8The website carries here details of State and oil marketingcompany-wise details of irregularities of under-measurement and adulteration found at Retail Outlets during the last three years and in the current year (April-September, 2016) 8The petroleum ministry has clarified that at present there is no discount on sale of crude oil by ONGC and royalty is being paid to states on the basis of price realized by ONGC. 8The website carries here the list of agreements, including one that looks at the feasibility study of a gas pipeline from Russia to India, signed between Russia and India at the Goa Summit 8Details are carried here of the total foreign investment in India's E&P sector so far along with company-wise investment details 8Details are also carried here of the latest ethanol and biofuels policies as well as procurement and pricing details 8Latest data on LPG connections released by the government are documented here 8Total approved cost for building crude storage facilities in India and the amount spent year-wise so far are tabulated 8Details of product-wise import of crude and petroleum products in the last three years, along with data up to April-September, 2016 8LPG import data for the last three years up to April-September, 2016 8Region-wise, country-wise crude import data for the last three years 8Production vs. consumption of petroleum products over the last three years Click on Reports for more. Click on our Database for more Details
Latest data shows that Indian public sector companies have paid up their oil dues to Iran 8It is Essar Oil Ltd however that still has an outstanding of a massive $ 2.31 billion 8MRPL paid up $2.35 billion in dues in the last four months 8IOC has also cleared its dues during this period as well 8The payment clearance mechanism has eased as far as Iran is concerned under President Obama but the dynamics may change subsequent to Donald Trump's election. Click on Reports for moreDetails
RFQs for CBM fracturing requirements are to be floated for an existing CBM block sometime in August-September, 2017 8Work on the ground for the drilling programme is expected to start earlier 8Total cost of the programme has been slated at around Rs 1400 crore Click on Details for moreDetails
We have hired a large team of mechanical engineers to keep track of projects coming up in the future in the oil & gas sector 8The team works through a highly proactive software that is programmed to look only at future RFQ dates along with key owner and EPC or EPCM contact information. 8For you, a deal can just be a phone call away 8We have begun carrying some of the alerts coming out of the software in the regular news section 8We are now offering the service of a dedicated analyst to our subscriber. 8In case he has a project related query or he requires a clarification on published project information, he can call the dedicated analyst. 8The analyst will do the research and get back to him within a time bound period. 8This facility will be available at a fraction of the cost of hiring a full time analyst. Fill up the subscription form or call our marketing team to know moreDetails
A public sector company is serious considering a Project Management Consultant for its Refinery Modernization Programme 8This follows an inability to arrive at a consensus over "some major issues" with Engineers India Ltd, well placed sources told this website. 8Given EIL's near monopoly, it is difficult to escape its stranglehold but nevertheless a consensus is emerging that the PMC role should be contracted out Click on Details for moreDetails
A business development possibility has emerged for an integrated LPG import facility. 8It is a storage capacity of around 16 TMT 8The EPC contractor is still be finalized. 8The cost of the project is slated at around Rs 500 crore Click on Details for moreDetails
A four-well, Rs 80 crore onland drilling programme is coming up. 8Drilling is expected to start by August, 2017 8RFQs for a Rig will be floated by May, 2017. 8RFQs for Drill pipes by April,2017. 8RFQs for Drilling Equipments and Consumables by April, 2017. 8RFQs for Bulbs and Spacers will float subsequently. 8RFQs for the Infrastructure Development of wells by the Mid Of May, 2017. 8RFQ for Generators by May 2017. Click on Details for moreDetails
Another onland drilling programme is coming up where RFQs are expected in April-May, 2017 8The cost of the programme is Rs.200 Crore and it covers Drilling, Infrastructure Development and Operating Cost. 8The programme is currently under environment clearance. Public hearing dates are to be announced soon Click on Details for moreDetails
An LPG plant is coming up in an existing refinery 8It is still at a planning stage however 8And the website will keep you posted as it moves forwards and initial RFQs for consultants are to be released Click on Details to find out where it is going to come upDetails
A shutdown is expected to take place in the lube block of a major refinery within the next one month The following maintenance work is expected: 8Piping works 8Replacement of exchanges 8An alternate reactor RFQs are expected immediately Click on Details for moreDetails
For reference purposes the website carries here the following tenders: 8Rate contract for Route & Cadastral Survey of pipelines of Mehsana Asset For A Period Of three Years Details 8Terminal automation system at Hubli, Hazira, Miraj and Solapur IRDs of HPCL Details You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Dharmendra Pradhan says govt taking steps to make India a gas-based economy Details 8Indian govt implements Ethanol blending programme Details 8Gas deal with India's ONGC likely by January Details 8Oil, gas majors skip auction of small fields Details 8Modi govt’s first oilfields auction: 42 companies submit 134 bids Details 8Indian Oil Corp has set up 6,811 kisan seva kendras: Pradhan Details You can also click on Newsclips for moreDetails
Petroleum product consumption registered a growth of 6.6% during October, 2016 as compared to 19.4% growth during October, 2015. 8Except for SKO and Bitumen, all other products registered a positive growth during October, 2016. 8Cumulatively for April-October 2016, petroleum product consumption registered a growth of 8.9% as compared to the same period last year. 8Gross production of natural gas for the month of October, 2016 was 2,755 MMSCM which was lower by 1.43 % compared with the corresponding month of the previous year (2,795 MMSCM). 8The cumulative gross production of natural gas 18,479 MMSCM for the current year till October, 2016 was lower by 3.98 % compared with the corresponding period of the previous year (19,244 MMSCM). 8LNG import for the month of October, 2016 was 2,262 MMSCM which was 18.6 % higher than the corresponding month of the previous year (1,908 MMSCM). The cumulative import of 14,915 MMSCM for the current year till October, 2016 was higher by 25.0 % compared with the corresponding period of the previous year (11,928 MMSCM). 8The prices of Brent crude averaged $49.66/bbl during October, 2016 as against $46.67/bbl during September, 2016. 8The Indian basket crude averaged $49.25/bbl during October, 2016 as against $44.48/bbl during the previous month. 8The import bill of crude oil is estimated to increase by 4% from $ 64 billion in 2015?16 to $67 billion in 2016-17 considering Indian basket crude oil price of $ 45/bbl and $/Rs 67 for the balance part of the financial year. Click on Reports for moreDetails
Indigenous crude oil production during October, 2016 was lower by 3.2% (100 TMT) in relation to the same month last year 8On overall basis, indigenous crude oil production was less by 3.3% (713 TMT) in April-October, 2016 8Total crude oil processed by the refineries during October, 2016 was 21,028 TMT against crude oil as against 18,258 TMT in October, 2015 and a target of 20,670 TMT for the month of October,2016. 8Production of petroleum products during October, 2016 saw a growth of 12.7% (2334TMT) while on a cumulative basis for the April-October period output grew by 8% 8Export of POL products increased during October, 2016 by 38.9% (1724 TMT) as compared to October, 2015. 8Further, imports increased by 17.2% (429 TMT) over the corresponding period of 2015. 8LPG, Lubes and Petcoke imports contributed 79.1 % share of the total POL imports during October, 2016. Click on Reports for moreDetails
A new third party inspection agency has been added to PNGRB's list of such agencies 8These agencies carry out inspections of gas pipelines and related entities on behalf of the Board Click on Reports for moreDetails
Singapore is pitching hard to become the biggest Asian LNG trading hub 8The island nation claims it has the necessary infrastructure and legal framework. Click on Reports to find out moreDetails
A business development opportunity is also coming up for the following additional tankages: 81600 KL of ethanol 81500 KL biodiesel Click on Reports for moreDetails