Dec 2017

For reference purposes the website carries here the following tenders:
8Supply of H2S Gas Detectors Details
8Hiring of Services for Integrated HAZOP Study of Plant Complex at Vijaipur Details
8Annual Civil Maintenance Contract of RT, Pipeline And SVs Under GAIL, RT Cherlapally Jurisdiction Details
8Carrying out External Safety Audit of Pipeline Installations of GAIL for Southern Region Details
8Annual Rate Contract for Handling Pipeline Emergency works Details
8Hiring Services for Calibration of PSVs of GAIL, Agra, Malanpur and Kailaras Details

8Supply of Online Dew Point Analyser for refinery Details
8Repair and refurbishment of Frame Gas Turbine Rotor in refinery Details
8Supply of Reciprocating Compressor Spares for refinery Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8EPA chief Pruitt jets to Morocco to help promote fossil fuel use Details
8India's November Iran oil imports skid to lowest since February 2016 Details
8China suffers natural gas shortage as coal ban backfires Details
8OPEC, allies look at plans for prolonged crude oil supply restraint Details
8Saudi Aramco to push ahead with market share, expansion strategy - CEO Details
8Oil rises on lower U.S. crude stocks, but growing output caps gains Details
8Need to continue momentum on building infrastructure: FM Jaitley Details
8Vedanta rejigs Cairn leadership to drive $1 billion investment plans Details
8Lebanon approves offshore oil, gas exploration bid Details
8GST council may bring petroleum products, realty under GST in future Details
8Investors pour cash into U.S. shale despite questions on returns Details
8Oil stable on tighter market, but rising U.S. output looms for 2018 Details
You can also click on Newsclips for more   
Details
8Project Name: Offshore Field Development.
8Project Cost: Rs 400 crore.
8Project Description: Promoter is planning the development of an Offshore Field. The project involves drilling of 2 wells, installation of one wellhead platform and laying of 4-inch 10km pipeline. Currently, the project is in clearance stage. The whole project is expected to be executed by lump sum Integrated Project Management consultant and Engineering Procurement Installation and commissioning model. Further RFQs for the project are expected shortly.
8Project Event: RFQs for hiring IPM consultant and EPIC contractor is expected by Q1, 2018.
8Expenditure Approval: 23/Feb/2017.
8RFQ Date: 25/Nov/2017.
8Release Date: Q1/2018.
8Start Date: Q1/2018.
8Completion Date: Nov/2019.
Click here for more details

8Project Name: Decommissioning Project.   
8Project Cost: Rs 500 crore
8Project Description: Promoter is planning an Offshore decommissioning project. The project involves the abandonment of wells and 5 platforms along with the associated intra-field pipelines. Currently, the project is in pre-clearance phase. The TOR for the project has not been granted on account that the said project/activity is not listed in the schedule to the EIA Notification, 2006, and thus not requiring the prior environmental clearance. Further RFQs for the project are expected shortly.
8Project Event: RFQ for hiring EPC contractor for project decommissioning is expected by Q1 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Q1/2018
8Release Date: Q1/2018
8Start Date: Q1/2019
8Completion Date: Q4/2019
Click here for more information
Details
8Project Name: Hydroelectric Plant Maintenance Project (Unit- 4)
8Project Cost: 20 crores
8Project Description: The owner has planned a 40-day scheduled maintenance of Unit-4 (115 MW) in the 690 MW (6*115 MW) Hydro Power Station covering annual inspection and overhaul of equipment which includes overhauling of auxiliary parts of the turbo-generator set, bearing sets, seals, governor and oil leakage unit, rotor assembly.
8Equipment required will be turbine guide bearings,vacuum breaking valve, pipes, air seals, water seals, cleaning of field winding, fabrication of platform in the draft tube for inspection of runner, among others.
8Project Event: RFQs for equipment required are expected by fourth week of December 2017.
8Expenditure Approval: Q2:2017
8RFQ Date: 28/Dec/2017
8Release Date: 10/Jan/2017
8Start Date: 29/Jan/2018
8Completion Date: 9/Mar/2018
Click here for more information
8Project Name: Pumped Storage Greenfield Plant
8Project Cost: 1000 crores
8Project Description: A Joint Venture is planning to construct a greenfield 400 MW pumped storage scheme which envisages re-circulating the water between lower and upper reservoirs. TOR is yet to be granted. Currently, the owner is carrying out the project scoping activities with the Government of Maharashtra. The owner will come out with a bid for S&I activities and DPR preparation.
8Project Event: RFQ for S&I and DPR preparation is expected by Q2 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Q2:2021
8Completion Date: Q4:2025
Click here for more information Details
8The global market for residual fuels faces strong headwinds going forward that could dramatically alter demand-supply balances and projections. Click on Report for more.
8OPEC predicted that global oil markets won’t rebalance until late next year after boosting forecasts for supplies from the U.S. and other rivals. OPEC's  monthly report raised its outlook for non-OPEC supply in 2018 by 300,000 barrels a day. As a result, an initiative by OPEC and Russia to clear a global oil glut by cutting production -- previously seen succeeding in the third quarter of 2018 -- will take effect more slowly. Click on Report for more.
8HPCL has a significant marketing presence with a market share of about 18.1% in petroleum product distribution in India. Find out more on why its EBITDA margins are lower as compared to other state-owned refiners? Click on Report for more.
8A conference is coming up with a focus on new technology gas products and safety with emphasis on LPG and CNG, along with bottling and marketing. Click on Report for more.
8Find out more on how the strategic Chabahar port is changing the dynamics of the region. Click on Report for more.
8More on the Great Game India is playing with Israel, Middle East, the US and China: There is more to all of it than meets the eye. click on Report for more.
8Corrosion monitoring market size, manufacturers: Analysis and competitive insights to 2022  Click on Report for more. Details
The glass is either half full or half empty, depending upon which side of the climate change debate you are on.
8Latest research done by fossil fuel adherents indicates that demand for crude will continue to increase right up to 2040
8And not just that, India will remain one of the biggest destination for crude cargoes in the world, with the highest rate of import growth till then
8Huge refining capacities have to come up in India, the study has reasoned.
8Due to increasing demand for clean and high-quality products, secondary capacity additions have become a key gauge of the refining sector’s capability to meet demand
8For those who think the advent of electric cars is going to dent this capacity creation are apparently on the wrong side of the divide
Click on Reports for more Details
Unbundling GAIL has been a cause of much debate and friction in India
8Is it good or bad for the country, eventually?
8While apologists have their reasons and whether or not open access measures eventually result in an efficient actively competitive natural gas market is the final proof of whether mechanisms for unbundling have been successful or not.
8What is more, the unbundling process is of great importance, and depending on the extent to which unbundling takes place, it can be split into different categories
8If at all GAIL has to be unbundled, can it be done through a gradual process?
8The reform of the natural gas market is a long-term and difficult process, requiring a particular political environment, relevant infrastructure and associated government policy.
8India is way behind in the process
Find out more oaboutwhat is going on on this front. Click on Report for more. Details
The Middle East is not just a crude hub but has now emerged as a global centre for trading of refined products
8Historically, prices for refined fuel products in the Middle East have been measured in terms of their relative value to the predominant Asian trading hub, Singapore – primarily because of the lack of local spot market liquidity in the past.
8But the dynamics have changed permanently.
8Find out more on what is going on in the Middle East products market and how it can possibly impact India
Click on Reports for more   Details
A large refinery in India, operating multiple crude & vacuum unit complexes, wanted to systematically increase the TAN operating limits of their crude feed, as a way to provide greater flexibility in crude selection, lower overall cost of crude, and improve refinery margins
8A phosphate-ester based corrosion inhibitor and its synergistic blend of phosphate-ester and phosphonate salt were suggested as it had the lowest potential to foul the vacuum column packed beds.
8The results were that corrosion rates, in the highest risk loops, were controlled within acceptable limits.
8There was no measurable increase in the pressure drop in any of the vacuum column packed beds
Click on Reports for more Details
Industrial water treatment is big business in India
8Find out more on the top 10 such firms and their expertise
8What is the overall market size
8Which segments are growing the most
8What kind of equipment and systems are needed in this business
8Digitalization has become an important aspect of water management
Click on Reports for more Details
What kind of anti-pollution measures should Indian ports keep in place, particularly in terms of crude and petroleum product spillage?
8The website has accumulated a list of vessels and equipment required to be in place at a given port.
8Are all Indian ports fulfilling these requirements?
8What are the day rates or leasing rates of standard anti-pollution equipment  such as dispersants, skimmers, spray systems, booms, tankers, tugs, vessels and sprays?
Click on Reports for more Details
Urea (Granular) and Captive Power Unit Expansion Project  
8Cost - Rs 700 Crore
8Project Description: A fertilizer company a Project Management Consultant, which is completed a basic engineering study for an expansion of Urea (Granular) Unit from 1500 MTPD to 1800 MTPD and Captive Power Unit from 7.5 MW to 32.5 MW in India. The equipment requirements are Gas Turbine Generating Set, HRSG Unit, Pumps, Heaters, Compressors, Reactors, Evaporators, Condensers, Coolers, Separators, Ejectors, Absorbers, Filters, Prilling tower Absorbers, Heat exchangers, Columns and more
8Project Event: RFQ for the EPC contractor is likely to be released in March 2018
Click here for more information
Customize Blending Unit for NPK Fertilizer & Ammonia Storage Tank Greenfield Project 
8Cost - Rs 90 Crore
8Project Description: A fertilizer company has hired a Project Management Consultant, which is completed a basic engineering study for its 30 TPH of Customized Blending Unit and 5000 MT of Ammonia storage tank in India. The equipment requirements are Steam Granulator drum, Rotary Dryer, Rotary Cooler, Belt / Screw Conveyors, Crushers, Screens, Weigh feeders, Cyclone Separators, Bag filters, Scrubbers, Bucket Elevators, Screw conveyors, Coating drum, Blowers, Compressor, Centrifugal Pumps, Safety Showers, Wind Sock, Flare package consists of Flare Tip Pilot, Flare stack, Local control stations (LCS) with canopy, Flame proof light fittings, GI earthing & lightning protection materials, Non addressable fire alarm system consisting FA panel, detectors, manual call points, etc., Ammonia gas detector, Bellows,Firefighting hydrants/ Spray Nozzles and more
8Project Event: RFQ for the EPC contractor is likely to be released in March 2018
Click here for more information
Ammonia-Urea Annual Maintenance Project
8Cost - Rs 30 Crore
8Project Description: A fertilizer company is planning an annual shutdown maintenance in March or April 2018 at their existing fertilizer complex in India. The existing capacity is made up of 1100 MTPD of Ammonia, 1650 MTPD of Urea. Pre-Vendor Qualification is necessary for maintenance contractor.
8Project Event: Tender for maintenance contractor is likely to be released in Q1 2018
Click here for more information
Details
For reference purposes the website carries here the following tenders:
8Supply of Natural Gas/ RLNG for Non-Urea Activity Details
8Sale of Natural gas from Ahmedabad field Details
8Hiring Services of Turnkey Transportation for Drilling Rig and Workover Rigs for Logistics Section of Cambay Asset Details
8Procurement of Potassium Hydroxide (Caustic Potash) for Drilling Fluid Services in Mehsana Asset Details
8Procurement of Caustic Soda (Sodium Hydroxide) for the Drilling Fluid Services in Mehsana Asset Details
8Consultancy Services for Sustainable Development and Preparation of Sustainability Report for FY 2016-17 & FY 2017-18 of Oil India Limited Details

8Repairing/ Replacement/ Modification of different Piping Systems inside and outside at different Oil, Gas and Water Handling Facilities of various production Installations Details
8Procurement of Valves as per tender specification at refinery Details
8Rate Contract for fabrication of Mild Steel Horizontal Liquid Petroleum Storage Tanks Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Investors turn against fossil fuels at Paris climate summit Details
8Broken pipeline cuts British supply during peak energy demand Details
8Climate commitments made at the 'One Planet Summit' in Paris Details
8OPINION: E-Vehicle challenge and opportunity Details
8Sudan seeks up to $200 mln prefinancing to fund oil development Details
8U.S. natural gas output seen up 1 pct in 2017, but below 2015 record Details
8Govt to boost trade ties with Asean: Dharmendra Pradhan Details
8India’s Q2 current account deficit more than doubles to $7.2 billion on high oil imports Details
8ADB cuts India’s growth forecast to 6.7 per cent Details
8Gas exports from Total's North Sea field halted until early Jan Details
8Oil crossing $65 mark is a worrying sign for Modi government Details
8Green panel nod to SECL's Rs 11,816 cr expansion project Details
8Supreme Court allows cement industry to use petroleum coke Details
8India in talks with Indonesia for refineries, LNG plants Details
You can also click on Newsclips for more   
Details
8Project Name: Refinery Maintenance Project
8Project Cost: Rs 20 Crore
8Project Description: An existing company along with EPC contractor is planning to overhaul its 300,000 barrels per day, refinery for about 45 days in the month of March-April 2018. The company had earlier planned to shut the refinery for 20 days in the month of November-December 2017 but that had to be deferred.
8Project Event: RFQ for manpower is expected by last week of December 2017
8Expenditure Approval: Q2:2017
8RFQ Date: Dec/2017
8Release Date: Jan/2018
8Start Date: Feb:2018
8Completion Date : Apr:2018
Click here for more details.
8Project Name: Floating Storage & Regasification LNG Terminal Greenfield Project
8Project Cost: Rs 1200 Crore
8Project Description: An existing company along with EPC contractor is carrying out construction activities to install a 4 MMTPA Floating Storage & Regasification LNG Terminal. At present mechanical work is going on.
8Project Event: RFQ for commissioning and pre-commissioning work is expected by February 2018.
8Expenditure Approval : Q4:2014
8RFQ Date : Feb/2018
8Release Date: Mar/2018
8Start Date: Q1:2015
8Completion Date: Jul:2018
Click here for more details.
8Project Name: Offshore Field Development.
8Project Cost: Rs 500 crore.
8Project Description: Promoter is planning the development of the Offshore Field. The project involves drilling of oil wells, installation of one wellhead platform and laying of pipeline. Currently, the project is in clearance stage. The whole project is expected to be executed by lump sum Integrated Project Mangement consultant and Engineering Procurement Installation and commisioning model. Further RFQs for the project are expected shortly.
8Project Event: RFQs for hiring IPM consultant and EPIC contractor is expected by Q1, 2018.
8Expenditure Approval: Q2/2016.
8RFQ Date: Q1/2018.
8Release Date: Q2/2018.
8Start Date: Q2/2019.
8Completion Date: Q2/2021.
Click here for more details

8Project Name: CBM Block Development
8Project Cost: Rs 447 crore
8Project Description: Promoter is planning the development of the CBM Block by drilling a total of 68 wells. An overall quantity of 0.3 MMSCMD of gas has been envisaged to be produced from the project. Promoter, in turn, has selected a US firm, to carry out the feasibility study for the project. Further RFQ's for the project are expected shortly.
8Project Event: EOI from promoter for drilling rigs as well as various mechanical and electrical equipment are expected by January 2018.
8Expenditure Approval: Q1/2016
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q3/2018
8Completion Date: Q3/2021
Click here for more information
Details
8Project Name: Gas Power Station Maintenance Project (GT-4)
8Project Cost: 14 crores
8Project Description: The owner has planned a 35-day scheduled maintenance of GT-4 (130.19 MW) in the 817 MW (4x130.19 MW GT + 2x154.51 MW ST) Gas Based Power Station covering boiler license renewal of 8000 equivalent operating hours, flame tube inspection, inspection of air-fuel ratio and compressor washing. 
8Equipment required will be valves, filters, casings, furnace tubes, seals, among others.
8Project Event: RFQ for equipment is expected by third week of December 2017.
8Expenditure Approval: Q2:2017
8RFQ Date: 21/Dec/2017
8Release Date: 5/Jan/2018
8Start Date: 15/Jan/2018
8Completion Date: 18/Feb/2017
Click here for more information
8Project Name: Procurement of a Generator rotor in Thermal Power Station - O&M supply
8Project Cost: 25 crores
8Project Description: The developer is planning to replace the existing generator rotor in the generator at a 600 MW Thermal Power Station in Salem district of Chennai, Tamil Nadu. The generator was supplied by BGR Energy Systems Ltd. The owner will procure a new generator rotor in case of failure of existing generator rotor, as repair of the rotor will take a long time. Administrative approval is awaited, subsequently after which the procurement team of the owner will come out with a bid for the new rotor.
8Project Event: RFQ for purchase of a new generator rotor is expected by Feb 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Feb/2018
8Release Date: Feb/2018
8Start Date: Mar/2018
8Completion Date: May/2018
Click here for more information
Details
8With the United States increasingly perceived as an unpredictable ally, Europe perceived as inward looking, and Asian powers perceived as only lightly engaged in the Middle East, many participants expressed the view that Saudi Arabia was left with Russia as a vital partner for collaboration on issues ranging from oil market management to conflicts across the Middle East. 
8Counterview: There is increasing skepticism about whether US shale can indeed perform as a highly elastic source of supply—a “swing producer”—in the global oil market. Why is that so?
8Find out more on why it will be dangerous for policy planners to depend on gas demand increase in India and China to be pegged just to air quality concerns
8A new balance sheet based financing model for LNG terminals is coming up, and two of the biggest companies in the world are setting up such a terminal on this concept instead of setting up a separate project company and raising debt on project-finance basis. If this takes off, a lot of similar projects can go on stream globally and particularly in the US. Find out more on how this can dramatically change the LNG game.
8Find out why Russian methane emissions may weaken the case of gas as a clean fuel. Click on Report for more. Details
Pressure is mounting on the coal industry and finding a bank to loan to a coal mine is getting to be all that much more difficult.
8A list of "Dirty 30" top global financial institutions have been identified along with their shareholding or loans in coal companies
8LIC figures high up
8But the list is lead by some surprising names
8Then again a ranking system has been introduced from A to F, for banks and financial institutions invested in coal.
8All of this makes for interesting reading.
Comment: Will what is happening to coal also happen to gas when renewable energy is the sole competitor? Unless methane emissions are curbed, gas may go the same way as coal one day
Click on Reports to find out more Details
The going is good for Petronet LNG for now
8It plans to increase its LNG capacity at Dahej by 2.5 MMTPA to 17.5 MMTPA by FY19E.
8Already, of its 15 MMTPA of Dahej capacity, 90% has been contracted, giving decent revenue visibility.
8Where will the company's big volume ramp-up going to come from next?
8That is the big question
Click on Reports for more Details
8The petroleum ministry is furious over spurious advertisements calling for dealership applications. Find out more. Click on Report.
8BHEL is trying its luck with cryogenic storage technology. Find out more. Click on Report.
8More on Dispersing Agent Market 2017: Development and trends, including gross margin analysis going up to 2022. Click on Report for more. Details
Find out a little more about the political pitfalls of petro-promises.
8An experiment has shown that politicians can gain from over promising on opportunities from oil discoveries
8How does the mechanism really work on voters
Click on Reports to find out more Details
A Rs 1800 crore 14 well business development programme is coming up
This will involve requirements among others for:
8Three well head platforms
8140 km of subsea pipelines
Click on Reports for more Details
Find out why GAIL still faces serious opposition in building an evacuation network out of the Kochi terminal
8The rate of compensation for ROW has been raised 10 times
8The cost of equipment and services has gone up significantly as well
8And yet, completion deadlines are unlikely to be achieved
Click on Reports for more Details
GAIL's attempt at playing the volatile LNG market will be tested by at least one of its swap arrangements.
8The attempt by GAIL to take delivery of oil-indexed LNG in return for Henry Hub based FOB sale from its US commitment will be watched keenly by analysts.
8Most believe that deal was made on the basis of horse sense instead of any complicated predictive modeling.
8Will such kind of gambling really work?
8The fact is that after the oil price crash, GAIL's 5 MMTPA of US LNG offtake commitments are no longer viable for the Indian market and swapping will not mitigate or take away this underlying problem
8Unfortunately, GAIL has not invested enough in acquiring the prerequisites to become a global gas trader and it faces many disadvantages that its competitors or counter parties do not
8GAIL is both outgunned and out maneuvered.
Find out more, Click on Reports and also see Details Details
Two well known foreign geologists have come up with the conclusion that the Deccan Plateau may indeed have large volumes of petroleum reserves.
8The sediments can, in fact, be linked to the Bombay coast
8And all possibilities exist for promising oil and gas zones
 Click on Reports for more   Details
Find out more on how integrating the South Asian market can unleash huge benefits for all member countries
8What are the incremental steps which can be taken to unlock the potential
8What can be their implications for the oil & gas sector?
Click on Reports for more Details
Ammonia-Urea & Captive Power Unit Greenfield Project  
8Cost - Rs 7000 Crore
8Project Description: A Fertilizer Company is awaiting environmental clearance for its greenfield ammonia-urea unit with a capacity of 2x2500 MTPD of ammonia, 4000 MTPD of urea and 2x 150 MW of Captive power unit at in India. The plant will be attached to an FRSU based terminal.The equipment requirements are Compressors, Turbines, Exchangers, Vaporizers, Subcoolers, Filters, Pumps, Heaters, Towers, Vessels, Storage systems, Cooler, Furnaces, Stacks, Converters, Boilers, Drums, Blowers, Economizers, Preheaters, Reactors, Tanks, Reactors, Evaporators, Condensers, Separators, Ejectors, Absorbers, Prilling towers, Absorbers, Heat exchangers, Columns, Generators Coal handling plant (CHP), Ash handling plant (AHP), Switchyard, Control and instrumentation equipment, Transmission lines, Substation, Transformers
8Project Event: The tender has already been released for Engineering Consultant in November 2017 and finalization is due in Q1 2018. The tender for equipment is likely to be released in Q1 2018.
Click here for more information
DAP/NPK- Phosphoric Acid & Sulphuric Acid Greenfield Project
8Cost - Rs 2000 Crore
Project Description: A Fertilizer company is awaiting environmental clearance for its greenfield DAP/NPK unit with a capacity of 6000 MTPD of DAP/NPK, 3000 MTPD of Phosphoric Acid and 4500 MTPD of Sulphuric Acid Unit in India. The equipment requirements are Steam Turbine Generators, Economizers, Reheaters, Boilers, Sulphur Combustor, Drying Towers, Vapor Separators, Converters, Absorbers, Absorber Exchangers, Sulphur filters, Sulphuric Melting Tank, Motors, Pumps, Storage Systems, Soda Ash Silos, Rotary Dryers, Grinding Unit, Ball Mill, Mixing Tanks, Blending Unit, Wet Scrubber Unit, Venturi Scrubber Unit, Cyclone System, Air Pollution Control System, Vibro Shifter and more
8Project Event: RFQ for Project Management Consultant is likely to be released in March 2018, The tender for LSTK contractor is likely to be released in Q2 2018
 Click here for more information
SSP/Sulphuric Acid Annual Maintenance Project   
8Cost - Rs 0.35 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in April 2018 at their existing fertilizer complex in India. The existing capacity is made up of 120000 MTPA of SSP and 79000 MTPA of Sulphuric Acid. Pre-Vendor Qualification may be necessary for a maintenance contractor.
Project Event: RFQ for a maintenance contractor is likely to be released in Q1 2018
Click here for more information 
Those subscribing to our petroleum portal may not have access to these items. Please contact our marketing department for access.
Details
For reference purposes the website carries here the following tenders:
8Procurement of Heat Exchanger at refinery Details
8Procurement of Pressure Safety Valves at refinery Details
8Purchase of Aviation Turbine Fuel (ATF) from ONGC s Hazira Plant on Domestic Competitive Bidding basis Details
8Arc for Corrosion Monitoring System for Dabhol Bangalore Pipeline Details
8Skilled and Unskilled Assistance for carrying out various Pipeline Maintenance Jobs Details
8Supply of Spare for Sulphur Analyser as per technical specification at refinery Details

8Fixing of Permanent Magnetic Markers in mainline in BK 12" inch Pipelines Details
8Procurement of MDPE and Valves for City Gas Distribution Projects Details
8Hiring of Engineering and Project Management Consultant for City Gas Distribution Projects Details
8Corrigendum: Hiring of Gas Compression Services on Build, Own and Operate (BOO) basis Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8ONGC seeks access to data room to fix HPCL acquisition price Details
8Brent crude jumps above $65 for 1st time since 2015 after North Sea pipeline outage Details
8Researchers develop cleaner, cheaper way to turn methane into fuel Details
8Chinese auto giant to end petrol vehicle sales by 2025 Details
8China's gas shortage spreads to southern China -Shanghai Securities News Details
8World Bank will stop funding oil and gas projects Details
8Why OMC shares lack fuel these days Details
8Reliance Industries owes over Rs 1,900 crore in surcharge dues to MMRDA: CM Devendra Fadnavis Details
8Petrochemical park being set up in Kochi Details
8Inflation accelerates to 15-month high of 4.88% in Nov Details
8Essar Energy disburses Rs 891 crore to erstwhile public shareholders of Essar Oil Details
You can also click on Newsclips for more   
Details
8Find our more on HPCL's Rs 60,000 crore of capex in the next four years. Where is the money going? Click on Report for more.
8Petrochemical prices are going to face downward pressures. There is a bearish outlook going ahead. Why so? Find out more. Click on Report.
8Pressure is mounting from all directions to reduce bank and financial institution funding to oil & gas and coal projects. There is also increasing pressure on the government to reduce subsidies on fossil fuels production and consumption. Where are the pressures coming from? Find out more. Click on Report.
8The valuation for IGL's stock has been raised, considering the company's debt free balance sheet, huge demand potential and scope for increase in area of operation, government and judicial support to increase usage of CNG and PNG, firm allocation of gas India to meet the domestic gas consumption, long term RLNG contracts with GAIL/BPCL and ability to generate high return on capital. But there are concerns as well. What if the gas mix changes? Find out more. Click on Report. Details
All our project updates lead to a sophisticated multiple-parameter software, which includes equipment requirement profiles and key contacts, technology used, utility matrices, maintenance contracts, NIC codes, and dozens of other variables.
8Project Name: Development Drilling
8Project Cost: Rs 400 crore.
8Project Description: Promoter is planning the development drilling of oil wells in Rajasthan. The project is listed out as an expansion project for the already existing 20 wells development drilling project. Currently, the well fluid collection and testing facilities for the oil field are located at GGS and GPC, each with a Gas processing capacity of 1 MMSCMD and 0.4 MMSCMD respectively.
The rig package and pipeline contract are in the final stage of the award. RFQs for all well consumables and production equipment namely X-Mas tree, Tubing Head Spool, Hanger Flange / Tubing Hangers, Separators with all accessories, Steam Jacket, Ground X-Mas tree, Tubing Pipes for surface fittings and flare line etc are expected shortly.

8Project Event: RFQ for hiring an EPC contractor for platform installation and pipeline is expected by November end 2017.
8Expenditure Approval: Q4/2016.
8RFQ Date: 24/Dec/2017.
8Release Date: 15/Jan/2018.
8Start Date: Jun/2018.
8Completion Date: Q2/2021.
Click here for more details

8Project Name: Oilfield Development
8Project Cost: Rs 150 crore
8Project Description: Promoter has proposed the development of an oil field in an onshore block. The project involves development drilling of wells, construction of surface facilities in the already existing CTF and the laying of a 6 inch, 35 km pipeline from the oil field to the CTF. Till now 27 kilometers of the pipeline has already been laid and the work for the remaining 8 kilometers of pipeline laying is to be bidded out. Moreover, promoter is expecting to start production from the field by December 2018. RFQs are expected shortly.
8Project Event: RFQ for hiring an EPC contractor for laying the pipeline is expected by January end 2018 instead of December 2017 as projected earlier.
8Expenditure Approval: Q2/2016
8RFQ Date: 25/Jan/2018
8Release Date: Feb/2018
8Start Date: Mar/2018
8Completion Date: Jun/2019
Click here for more information
8Project Name: Refinery BS VI Greenfield Project
8Project Cost: Rs 2771 Crore
8Project Description: An existing company along with EPC contractor and licensor Indian Oil's own R&D Wing is carrying out engineering activities to construct a new DHDT unit with a capacity of 2 MMTPA in its refinery.
8Project Event: RFQ for procuring items is expected by January 2018.
8Expenditure Approval: Q3:2016
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q3:2016
8Completion Date: Q1:2019
Click here for more details.
8Project Name: Refinery Debottlenecking Greenfield
8Project Cost: Rs 2519 Crore
8Project Description: An existing company along with EPC contractor is currently conducting engineering activities for a low cost debottlenecking of its refinery, raising its capacity from 6 MMTPA to 7.8 MMTPA. RFQ for the equipment is already out.
8Project Event: RFQ for civil work is expected by February 2018.
8Expenditure Approval: Q4:2017
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Q2:2017
8Completion Date: Q4:2018
Click here for more details.

Details
More than India, it is Pakistan that needs gas supplies through a pipeline network from Turkmenistan via the proposed Turkmenistan-Afghanistan-Pakistan-India pipeline.
8Like India, Pakistan too is hobbled by a two-part gas price policy, one for domestically produced gas and another for LNG.
8The demand-supply gas is big and Pakistan, like India, has an affordability problem.
8There have been some reforms in Pakistan, such as making oil & gas a concurrent subject, that Indian policy makers perhaps emulate to get state government into a more participative mode.
8Eventually, economics will hopefully triumph politics for Pakistan to push ahead with the pipeline
8A deeper understanding of the Pakistan gas sector will keep policy planner in India motivated to keep pushing for the TAPI as well as the Iran-Pakistan-India pipeline.
Click on Reports for more Details
8Find out more on why if LNG from the distant Yamal LNG project in Russia can come to China, it can also be sent to India but through an entirely different route.
8Find out why while LNG shipping capacity will rise by 22% till 2020, there are no uncommitted vessels in 2018 deliveries
8In fact there are a couple of uncommitted FSRUs and Indian companies will do well to grab them before it is too late
8Also find out more on how the demand side of FSRUs is going to develop going up to 2022
8Find out more on LNG vessel deliveries by vessel type up to 2020. Click on Report. Details
Increasing competition from Australia and the US seems to have forced Qatar to lose market share
8Find out by how much has Qatar has lost in Q3, 2017 in relation to Q1
8Also know more on why fresh chartering activity has moved almost entirely to shot and spot fixtures with very few long term contracts
Click on Reports for more Details
How is Vedanta's $ 1 billion capex in Barmer spread out?
8Capex spend has picked up speed in the second half of the current year
8Momentum will be maintained in the next year
8Where exactly is the money going to?
 Click on Reports for more Details
Captive Power Unit Expansion Project  
8Cost - Rs 224 Crore
8Project Description: A Fertilizer Company 
is awaiting environmental clearance for an expansion of its captive power unit from 125 MW to 141 MW at Kota In Rajasthan. The equipment requirements are Turbine Generator with their Auxiliaries and Utility, Boiler House including ESP, Ash Handling and other Auxiliaries, Fuel Handling plant, Automation, Instrumentation, Electrical Installations, Civil Work equipment and more.
8Project Event
The tender has already been released for Engineering Consultant in November 2017 and finalization is due in Q1 2018. The tender for equipment is likely to be released in Q1 2018.
Click here for more information
SSP Annual Maintenance Project 
8Cost - Rs 0.28 Crore
8Project Description: A Fertilizer company 
is planning an annual shutdown maintenance in Q2 2018 at their existing fertilizer complex at Hamirgarh in Rajasthan. The existing capacity is made up of 132000 MTPA of SSP. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event
RFQ for a maintenance contractor is likely to be released at the end of December 2017.
Click here for more information
SSP Annual Maintenance Project
8Cost - Rs 0.25 Crore
8Project Description: A Fertilizer Company 
is planning an annual shutdown maintenance in Q2 2018 at their existing fertilizer complex at Moraiya in Gujarat. The existing capacity is made up of 166000 MTPA of SSP. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event:
 RFQ for a maintenance contractor is likely to be released in Q1 2018
Click here for more information
Details
For reference purposes the website carries here the following tenders:
8Supply of Sulphuric Acid in tankers for a period of one year Details
8Retubing of Heat Exchanger tube bundle during shutdown Details
8Procurement of Portable Radiation Pyrometer for GAIL Pata Details
8Civil Works for deployment of Work Over Rig HH-100T at Well Site Details
8Hiring of Services for Testing and Calibration of Pressure Safety Valves of eight Offshore Rigs for three years Details
8Procurement of Transmitters for Neelam and Heera Platform Details

8Annual Maintenance Contract for Emergency Response and ROU Maintenance for Mumbai region Pipeline Details
8Carrying out Operations and Maintenance of Fuel handling facilities of BPCL/ NTPC at Cheppad and Kayamkulam Details
8Procurement of Laser based Portable Gas Detection Instrument for GAIL Gas Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Indian govt favours petcoke import ban, US would be biggest loser Details
8AIIB approves $250 million in loans for building China gas pipelines Details
8China coal prices soar as gas shortages spur unexpected demand Details
8Premier Oil Plc to sell North Sea pipeline stake to CATS Management Details
8India's fuel demand rose 6.2 percent in November Details
8Goldman sees strong OPEC, Russia compliance to oil cut through first half of 2018 Details
8Israel gives initial nod to Indian, Greek exploration companies Details
8Here are some of the macro mess-ups that drove companies to bankruptcy Details
8Chinese suitor to AWE looking to ship LNG from Australia's west to east Details
8Saudi Arabia plans to maintain oil supplies in Jan at 6.9 mln bpd -industry source Details
8UAE says OPEC, allies to announce an exit strategy from supply cuts in June Details
8Definition change may let private exploration companies exploit shale Details
8Tankers gather off PDVSA ports amid delays in exporting fuel oil Details
8Brazil likely to limit cuts to local content requirements in oil contracts Details
8British energy prices spike on major North Sea gas pipeline outage Details
8UP sanctions Rs 17.84 crore for LPG connections in 42,000 govt schools Details
8Global banks undermining Paris climate agreement goals, say reports Details
You can also click on Newsclips for more   
Details
8Project Name: Brownfield LPG Import Terminal Project
8Project Cost: Rs 500 Crore
8Project Description: An existing company along with EPC contractor is planning to expand its existing capacity from 0.6 MMTPA(2X15000=30000, 2X150) to 5 MMTPA(4X15000, 3X600, 2X150) in the LPG import terminal plant. RFQ for equipment is already out. Environmental clearance is expected by February 2018.
8Project Event: RFQ for Civil work is expected by February 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Q1:2018
8Completion Date: Q2:2021
Click here for more details.
Details
8Project Name: Drilling Site Development
8Project Cost: Rs 700 crore
8Project Description: Promoter is planning exploratory drilling of oil wells in onland block. The project involves exploratory drilling of onshore wells and has been listed out as an extension project for already existing drilling project. Currently, the project is in clearance phase. The environment clearance for the project is expected by Q1 2018. The forest clearance and CRZ clearance for the project is not required. RFQs for the following equipment are expected shortly for: Cementing Unit, Blow Out Preventer, Pressure Gauge, Valves and Chemicals.
8Project Event: RFQ for the equipment is expected by December end 2017
8Expenditure Approval: Q3/2016
8RFQ Date: 30/Dec/2017
8Release Date: Jan/2018
8Start Date: Feb/2018
8Completion Date: Q4/2022
Click here for more information

8Project Name: Gas Pipeline Upgradation.
8Project Cost: Rs 10 crore.
8Project Description: Promoter is planning upgradation of existing submarine trunk gas pipelines. The project involves upgradation of the pipeline network, passing through an airport considering their proximity to the present runway and proposed runway extension plan crossing over the pipeline, in compliance with International Safety Standards and Operating Practices.
Airport authorities have proposed a runway extension from 2900 m to 3700 m, which will cross over the pipeline. Currently, the promoter is in process of carrying out hazard analysis study. Further RFQs are expected shortly.
8Project Event: RFQ for hiring EPC contractor is expected by March 2018.
8Expenditure Approval: Q1/2018.
8RFQ Date: March/2018.
8Release Date: Q2/2018.
8Date: Q3/2018.
8Completion Date: Q4/2018.
Click on details for more information.
Details
Ammonium Nitrate Greenfield Project: RFQs in Q1, 2018  
8Cost - Rs 1750 Crore
8Project Description: A Fertilizer Company is awaiting clearance for its greenfield Ammonium Nitrate project with a capacity 2550 MTPD in India. The equipment requirements are Power receiving switchyard and sub-station, DG set, Complete firefighting system, Fire and smoke / gas detectors, Intake pipeline for water, Water treatment plant, Water reservoir, DM Water plant, DM Water tank, Condensate tank, Process water tank, Cooling Tower including pumps, motors / turbine and dosing system, Boilers and stack, Instrument air compressors, receivers and dryer, Effluent treatment plant including Reunite, Storage tanks including pumps and more.
8Project Event: RFQ for the Contractor is likely to be released in Q1 2018
Click here for more information
Ammonia-Urea Energy Saving Project: Finalization in January, 2018
8Cost - Rs 300 Crore
8Project Description: Thermax, Mitsubishi Hitachi Power Systems India Private Limited, Tata Power and BHEL are in the race for an energy saving project of National Fertilizer Ltd at its Fertilizer Complex in India. The project consultant is PDIL. There is a requirement for Compressor, Gas Turbine, Air Intake System, Filters, Centrifugal Fans, Pumps, HRSG and its Auxiliaries, Heat Exchanger Shell and Tube, Pressure Vessel, Dosing Pump, Motorised Agitator, Generator, Excitation System, Relay Panels, Generator Control Panels, 11KV Switch Gear, 3.3 KV Switch Gear, DC System, Battery Charger, 11KV/ 11.5KV Generator Transformer,11KV /3.3KV Transformer, 11KV /415V Transformer, Low Voltage Switch Gear, HV Motors, Control Panels, Neutral Earthing Resistor, Light fitting of each Type & Rating, Fire Detecting System, LV Motors, PA Systems, Capacitor bank, LCS, Annunciator panel, Load Management System, EOT Crane, Instrument Items and more.
8Project Event: The tender has already been released for an LSTK contractor in March 2017 and price bid is likely to be opened at the end of December 2017 finalization is due in January 2018.
Click here for more information
SSP Annual Maintenance Project:
RFQ in Q-1, 2018
8Cost - Rs 0.25 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in Q2 2018 at their existing fertilizer complex in India. The existing capacity is made up of 180000 MTPA of SSP and 36000 MTPA of Sulphuric Acid. Pre-Vendor Qualification may be necessary for a maintenance contractor.
8Project Event: RFQ for a maintenance contractor is likely to be released in Q1 2018
Click here for more information
Details
8Find out more on India's oil & gas investments in East Africa. Click on Report for more.
8Find out more how ONGC Petro Additions Ltd, with its 1.1 MMTAP ethylene capacity, has suddenly caught on the fancy of analysts and rating agencies. Click on Report for more.
8LNG demand can get stymied by rising domestic production. Find out the argument behind this logic. Click on Report for more.
8Pet coke imports from the US will choke India further. Find out how. Click on Report.
8Does Myanmar provide a business development case for the Indian oil & gas industry? Find out here. Click on Report.
8Find out more on this Indian JV that is rolling out customizable solutions of Indian LPG plants with state of art technology. Click on Report for more.
8How does one maneuver through the intricate web of state pollution board standards? Here is a document that helps you do that. Click on Report for more.
8The fresh OPEC deal is causing US producers to spur up production. US oil rig count continues upward crawl for third straight week. Click on Report for more.
8Fossil fuels may not have a future in shipping. Find out more. Click on Report.
8There is a conference on electric vehicles coming up and oil & gas sector planner must attend. Click on Report for more. Details
IOC has become extra cautious after facing an unusually high amount of political flack for tying up with the Adanis for the Dhamra LNG project.
8The point to note is that IOC will be an anchor customer for the LNG terminal
8IOC's offtake will be as much as 7 mmscmd from the terminal
8It is now putting in a conscious effort at future-proofing its relationship with the Adanis.
Find out more on how it is doing it and will it eventually work for the company?
   Details
Are independent bio-diesel operations a successful business model.
8The cost of bio-diesel is significantly cheaper than unsubsidized diesel as of now
8Find out what is the differential
8Bio diesel complies with new emission norms and can be used in existing vehicles and bio diesel and diesel are seamlessly interchangeable.
8Is the setting up independent bio-diesel retail outlets a viable proposition?
8What bio-diesel probably needs to really take off is some kind of policy push from the government
Find out more. Click on Report. Details
The real driver of global oil prices is not demand pressure but endogenous supply shocks.
8Exogenous disruptions, like the OPEC deal to keep production capacity out, also really do not have an impact
8Only if basic oil production capacity is hurt or curtailed or is less than what is required, will oil prices be impacted
8So if capacity continues to be created, as is the case with US shale, prices may not move up much, unless constrained by lack of adequate capacity creation in conventional oil & gas resources.
Click on Reports to find out more Details
OECD crude inventories have fallen and oil futures curves are in backwardation. Does that mean OPEC has achieved its mission?
8The answer seems to be an emphatic "no".
8There is little indication that the backwardation in futures curves is going to stop US production from expanding. In 2018, US production will likely hit an all-time high, surpassing the cycle peak reached before the price war in 2014 and above the 10 million barrel mark last hit in 1970.
8Simultaneously, OPEC and it non-OPEC partners last week announced they will extend the deal to cut supply from October 2016 by 1.8mn barrels to the end of 2018.
8But the expectation is that compliance in this extended deal will fall short of expectations.
8Surpluses are going to back again, and Q4 2017 is likely to be the last quarter of deficit for a while.
Click on Reports for more Details
For reference purposes, the website carries here data on break even price data for international oil majors in 2018-19
8The point to note is that industry has driven cash flow break-evens from $90B to $53B since the oil price crash, heralding a tentative increase in investment
8Quite a few companies do not make the cash flow break even point of above $50/bbl, pushed by a high dividend policy
8BP's cost is higher than Shell and is above the breakeven point
8For many, if the cash flow model is changed to the basic breakeven level, then the cost is significantly lower, at between $30 to $40/bbl
8How do ONGC's domination oil stand up to these breakeven levels?
8That is an interesting question to ask
Click on Reports for more Details
Latest estimates seem to show that the global offshore E&P spend in 2018 is not going to be better than 2017.
82019 is not going to be a good year too
8How is it is going to pan out in 2020 and 2022.
8Does that mean that equipment and services companies will have to continue to keep their price lines low for now?
Click on Reports for more   Details
Lifecycle greenhouse gas emissions are now increasingly used as a tool to fight the case against the use of gas.
8While gas is relatively cleaner fuel than coal, it is not clean enough to fight emissions, is the new argument.
8Fossil fuel technologies are way more carbon-emitting than fossil fuel based fuels
8All renewable technology fuels are 1,000 g CO2eq/kWh lower than their fossil-fuelled counterparts (without CCS).
8Increasingly, this is going to be an important component of future conversations.
Click on Reports to know more Details
Can India's transportation sector use long haul LNG-based gas engines to beat the lack of a gas distribution system?
8In combustion, there is no difference between LNG and CNG, but there are significant differences in the operational range
8With new large haul, highly efficient gas engines, LNG can provide a range of as much as 1,100 kilometres for a typical truck on a flat road whereas CNG usually provides a range of up to 500 kilometres.
8So it is possible to use gas-powered trucks to deliver medium haul transport solutions with return trips without refueling.
Click on Reports for more Details
What are the key new drivers in the building of ports in India?
8There is now a trend for port operators to go into attendant related areas such as dredging
8The trend towards port-based SEZs is gaining momentum
8The focus is on draft depth
8Specialized terminal based ports are coming up
Click on Reports for case case studies and business opportunities  Details
Another round of business development opportunities is coming up with the proposed brownfield expansion of 6 MMTPA of refining capacity
8What is more, this will involve a petcoke gasifier itself.
8This is over and above attendant ongoing petrochemical expansions
Click on Reports for more   Details
The Indian LPG logistics business still provides an attractive investment case for the intrepid entrepreneur.
8Private, non-subsidized LPG consumption is growing at a rapid pace in its different segments
8A big supply-demand gap exists which the public sector companies alone cannot take care of. The demand CAGR is very high and slated to stay high.
8A comprehensive model, involving a sourcing-to-retail solutions is a better business case than LNG is at this point
8Find out more why this is so
Click on Reports for more Details
Energy efficiency labeling in India has so far not been a success
8The system is full of holes
8How can effective verification, monitoring and implementation rules be enforced?
8What should policymakers do?
Find out more Details
 < 1 2 3 4 5 > 

Showing 101–150 of 213 items