8Project Name: Gas based Power Plant
8Project Cost: Rs 100 crore.
8Project Description: Promoter is planning development of a gas-based 20 MW thermal power plant. The project involves the addition of capacity to an existing unused 5 MW capacity turbine. Currently, the project is in pre-planning stage. The company is looking for a technology provider in order to support the project. Moreover, there has been a slight delay in hiring the consultant for the project. RFQ for the gas based engine is expected soon.
8Project Event: RFQ for hiring the consultant for the project is expected by Feb 2018.
RFQ for equipment is expected by Q2 2018.
8Expenditure Approval: Q1/2018.
8RFQ Date: Feb/2018.
8Release Date: Mar/2018.
8Start Date: Q4/2018.
8Completion Date: Q4/2020.
Click here for more details
8Project Name: POL Terminal Expansion Project
8Project Cost: Rs 119 Crore
8Project Description: An existing company is planning to expand its capacity from 191074 KL to 319874 KL by installing tanks with a capacity of 4 X 1,200 KL of ethanol, 4 X 25,000 KL of HSD and 2 X 12,000 KL of MS.
8Project Event: RFQ for the Project Management Consultant is expected by March 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Mar/2018
8Release Date: Apr/2018
8Start Date: Q2:2018
8Completion Date: Q2:2020
Click here for more details.
8Project Name: Greenfield Petrochemical Complex Project
8Project Cost: Rs 30000 Crore
8Project Description: An existing company along with EPCM contractor is planning to construct a petrochemical complex with a capacity of 1 MMTPA. At present licensor selection is under process.
8Project Event: RFQ for the equipment is expected by February 2018.
8Expenditure Approval: Q1:2017
8RFQ Date: Feb/2018
8Release Date: Apr/2018
8Start Date: Q2:2018
8Completion Date: Q2:2022
Click here for more details.
Details
8Project Name: Hydroelectric Plant (Unit - 1) Maintenance Project
8Project Cost: 20 crores
8Project Description: The owner has planned a 20-day scheduled maintenance of Unit-1 (165 MW) in the 990 MW (6*165) Hydroelectric Station covering annual inspection and overhaul of equipment which includes overhauling and checking of auxiliary parts of the turbine-generator set, bearing sets, level gauge, sensors and seals.
8Equipment required will be turbine bearings, gland seals, pipes, guide vanes seal, spiral casing, spiral drain valve, foundation parts, change of worn out bushes of guide vanes journals, among others.
8Project Event: RFQs for equipment are expected by third week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 22/Jan/2018
8Release Date: Feb/2018
8Start Date: 5/Mar/2018
8Completion Date: 24/Mar/2018
Click here for more information
8Project Name: Greenfield Thermal Power Plant
8Project Cost: 7000 crores
8Project Description: The owner along with EPC contractor is setting up a 1080 MW (4*270 MW) greenfield Thermal Power Plant. EC was granted to this project on March 15, 2017. At present, civil construction activities are ongoing.  has already floated tenders to procure long lead items like ESP (Electrostatic Precipitators) and transportation of boiler drum. Further tenders regarding erection and commissioning, transportation services and control and instrumentation (C&I) equipment have been released and are currently under scrutiny. The progress of works has been hampered due to heavy rains in the plant area. Now, RFQs for electrical equipment and FGD equipment are expected shortly.
8Project Event: RFQs for electrical equipment and FGD equipment are expected in February 2018.
8Expenditure Approval: Apr/2014
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Dec/2017
8Completion Date: Nov/2024
Click here for more information Details
8Long haul seaborne petrochemical transportation market continues to deteriorate: Despite the growth in underlying demand for petrochemical products, there has been a deteriorating long haul seaborne petrochemical transportation market over the past 5 years, in large due to declining Middle East ethylene exports (in the period 2011-2016 tons declined by 59%). Relevant data fields on carrier sizes, likely addition to fleet and future market size are carried here. Click on Report for more.
82017 global tanker market Round-Up. Average TCE VLCC rates for the year are hovering below US$ 10,500pd which is around a third of the average of 2016 rates which were US$ 30,400pd. On a slightly better note, Suezmax TCE rates, although down year on year have only fallen to around half of what they were, with the TCE having average at US$ 12,500pd this year. Similar to the Suezmax market, average Aframax TCE rates have also fallen to around half of what they were, with the TCE having averaged at US$ 9,000pd for the year so far. Click on Report for more.
8The ratio of Japanese LNG price and US Henry Hub has increased to 2.1 in the third quarter of 2017 while in April 2017 it was as low as 1.7. The average TTF/Henry Hub ratio increased to 1.9 in the third quarter of 2017 from 1.6 in May 2017. In absolute terms, the TTF/Henry Hub differential increased to 2.6 USD/mmbtu in the third quarter, up from an average 2.0 USD/mmbtu in the previous quarter. Click on Report for more.
8Get a detailed year-end roundup of the Indian oil & gas market. See how the government looks at the year, of course with satisfaction. Click on Report for more.
8Know all about the Shapoorji Pallonji Group: Which direction are they headed? Click on Report for more.
8Pneumatic Valves Market Development Trends, Market Scope and Overview by 2022. Click on Report for more.
8Transitioning Towards a Sustainable Energy Future: Challenges and Opportunities for India, a lecture by former Shell India boss, Vikram Singh Mehta. Click on Report for more.
8IOC: New CVO appointed. Click on Report for more.
8EIL is slated to grab large contracts: The company is likely to garner the contacts for HPCL Barmer refinery (expected refinery cost is Rs 410 Bn) and West Coast refinery (40 mn tonnes project; value Rs 1.4 trillion, PMC scope could be 5-7% of total cost) could get awarded over FY18-20. Find out more. Click on Report.
8Soaring prices, tight supply drive LNG tanker speeds to near 3-year high. Click on Report for more
8Outlook 2018: OPEC'S alliance to face stiff tests. Click on Report for more.
8OIL has come out with a coffee table book. Get a copy here. Click on Report. Details
This is how the SSLNG concept works:
8
Offshore: Large scale LNG terminal anywhere in the world: Offshore Loading LNG from large LNGC’s to small LNGC’s by ship-to-ship transfer (STS).
8In Port, Shallow Waters: Loading LNG from small LNGC’s to FSU’s by ship-to-ship transfer (STS).
8LNG Truck Loading: Loading LNG from FSU’s to trucks with ISO tanks by flexible hose facility.
8LNG Fuelling Station: Fuelling trucks and heavy transportation vehicles with LNG or CNG.
8Power Plant: Regasification of LNG for power production, supplying electricity for the grid.
8Industrial Area: Supplying LNG by trucks to industrial users.
8Retail Area: Supplying LNG to villages or cities with residences, office buildings, banks, hospitals etc.
Click on Reports for more Details
A unique fast-track, low capex Small Scale LNG (SSLNG) project has just been launched in Africa and can be a model for India as well.
8The “Proof of Concept” SSLNG uses flexible multigas vessels to provide near and medium term LNG
8The vessels have a shallow draft, which means they can operate in smaller ports with water draft and with length restrictions and limited access to a jetty in port.
8The vessels can load at conventional LNG terminals with its multiple height manifolds, and the vessels can arrange to offload where there is no jetty or limited jetty capability. There is a unique patented on-board LNG re-liquefaction plant that handle boil-off (BOGs)
8In addition, the cargo system can withstand pressure and the deck tank is designed for easy change of grade, allowing for efficiency and flexibility.
8Essentially, stranded assets can be provided gas at very short notice and in flexible quantities.
Click on Reports for more Details
The website carries here a very comprehensive study on India's air pollution
8All cities are ranked in terms of a pollution index
8Detailed city-wise data is available from where the pollution is coming from
8State-wise air pollution risk factors in Indian states is carried here
8The various options to curb pollution are discussed in a very detailed manner
Click on Reports Details
Find out how India has become the dumping ground for the global pet coke industry
8In the US, the use of PetCoke in power generation has plummeted due to heavy restrictions.
8Until 2014, China was the biggest buyer of US Petcoke. But sulphur restrictions and local bans on new power plants have closed this supply from US.
8Import of pet coke is under the Open General Licence (OGL). Not restricted like other hHazardous substances
8Import of Petcoke increased more than 14 times, since 2010-11 -- Compounded Annual Growth Rate of 45.92%.
8Lower prices incite petcoke use. Under GST, these fuels are in 18%  slab. But Input tax under GST is credited back to the industry, -- effective tax rate is 0%
8Cleaner alternatives such as Natural Gas and Electricity are taxed high – as high as 26% in some states.
Click on Reports for more Details
Initial studies on two offshore blocks given out under the Discovered Small Fields (DSF) round 2016 show that they do not have enough reserves for viable exploitation.
8This has sent the petroleum ministry into a tizzy
8Discussions are on with the promoters on how to handle this problem
8Also what has been the progress so far on the Round?
Click on Details for more Details
Ammonia-Urea & Captive Power Unit Greenfield Project
8Cost - Rs 7000 Crore
8Project Description: A Fertilizer Company is awaiting environmental clearance for its greenfield ammonia-urea unit with a capacity of 2x2500 MTPD of ammonia, 4000 MTPD of urea and 2x 150 MW of Captive power unit in India. The plant will be attached to an FRSU based terminal.The equipment requirements are Compressors, Turbines, Exchangers, Vaporizers, Subcoolers, Filters, Pumps, Heaters, Towers, Vessels,Storage systems, Cooler, Furnaces, Stacks, Converters, Boilers, Drums, Blowers, Economizers, Preheaters, Reactors, Tanks, Reactors, Evaporators, Condensers, Separators, Ejectors, Absorbers, Prilling towers, Absorbers, Heat exchangers, Columns, Generators Coal handling plant (CHP), Ash handling plant (AHP), Switchyard, Control and instrumentation equipment, Transmission lines, Substation, Transformers. The proposal for an environmental clearance has returned due to lack of information of land uses
8Project Event: RFQ for Project Management Consultant is likely to be released in March 2018, The tender for LSTK contractor is likely to be released in Q2 2018.
Click here for more information
Single/Triple Super Phosphate Greenfield Project
8Cost - Rs 30 Crore
8Project Description: A Fertilizer Company is awaiting environmental clearance for its greenfield Super Phosphate Unit with a capacity 100000 MTPA of Single Super Phosphate, 60000 MTPA of Triple Super Phosphate in India. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers, Screen, Mill, Elevator, Drum, Furnace, Cyclone, Blower, Belt, Weighing machine and more.The proposal for an environmental clearance is likely to be submitted in February 2018.
8Project Event: The terms of reference have been granted and RFQs for a contractor is likely to be released in March 2018
Click here for more information
Phosphoric Acid Greenfield Project
8Cost - Rs 10 Crore
8Project Description: A Fertilizer Company is awaiting environmental clearance for its greenfield Phosphoric acid unit with a capacity 30000 MTPA of Phosphoric acid in India. The equipment requirements are Storage Systems, Soda Ash Silos, Rotary Dryers, Grinding Unit, Ball Mill, Mixing Tanks, Blending Unit, Wet Scrubber Unit, Venturi Scrubber Unit, Cyclone System, Air Pollution Control System, Vibro Shifter, Screens, Sieves, Conveyors and more. The proposal for an environmental clearance is likely to be submitted in February 2018.
8Project Event: The terms of reference have been granted and RFQs for a contractor is likely to be released in March 2018
Click here for more information
Details
For reference purposes the website carries here the following tenders:
8Carrying out excavation for Non Destructive Testing by UT Flaw Detection with reports for Non-Piggable Underground Pipelines Details
8
Carrying out Hydrotesting of incoming ONGC and GGL pipelines Details
8Laying of Pipelines under KKBMPL Project Phase-II Details
8Carrying out Civil works at drill site GKJH_H & GKJI_H in Geleky area Details
8Procurement of Double Pipe Heat Exchangers for Propylene Derivative Petrochemical Project Details
8Supply of Chemical Neutralization for Panipat Refinery and Petrochemical Complex Details
8Hydro blasting cleaning of equipments with contractor supplied hydro jetting machine on ARC basis at refinery Details

8Consultancy Services for Ethanol Production Plant from PSA Off-Gas of Hydrogen generation Unit at refinery Details
8Providing Consultancy Services for detailed feasibility report preparation and EPCM services for production of Lignocellulosic second generation Ethanol Details
8Procurement of Tanks for Paradip-Hyderabad Product Pipeline Project at refinery Details
8Supply of Spares for Feed Gas and Tail Gas Analysers for refinery Details
8Supply of Ball Valves for Refuellers Details
8Supply of Dual Plate Check Valves for BS VI Project Details
8Installation, Testing and Commissioning of Gas Turbine Generator from Rokhia Gas Thermal Power Plant in refinery site Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Government takes back LPG price hike order after 'contrary' signal Details
8With new gas deals, Egypt closes in on energy hub goal Details
8NITI Aayog working on policy to cut crude oil import bill by $100 bn Details
8Israel to award gas exploration license to a consortium of Indian oil PSUs Details
8Year Ender: Oil and Gas Sector to step on the gas in 2018; Lack of clarity on GST prevails  Details
8Indian oil cos to drop anchor in Israeli waters as Iran deal hangs fire Details
8Oil Minister Dharmendra Pradhan to states: Cut sales tax or VAT on petrol and diesel Details
8OIL makes 2 hydrocarbon discoveries Details
8Foreign investor interest in India will be strong in 2018: Jon Thorn Details
8Need felt to convert furnace oil into gas Details
8Russia set to keep its grip on European gas market Details
8IndianOil to start production of biomass-based ethanol Details
You can also click on Newsclips for more   
Details
8Project Name: Oil Field Development
8Project Cost: Rs 150 crore.
8Project Description: Promoter is planning development of an oil field. The block had been awarded to the company under the Discovered Small Fields Round in 2016. Currently, the project is in pre-planning stage. The company is in the process of carrying out an oil and gas field study so as to estimate the possible oil reserve. Further RFQs for the project are expected shortly.
8Project Event: RFQs for hiring various oil and gas services is expected by Q1 2019.
8Expenditure Approval: Q2/2018.
8RFQ Date: Q1/2019.
8Release Date: Q2/2019.
8Date: Q4/2019.
8Completion Date: Q4/2021.
Click here for more details

8Project Name:  Exploratory Drilling
8Project Cost: Rs 710 crore
8Project Description: Promoter is planning exploratory drilling of oil wells in an onland block. The project involves exploratory drilling of onshore wells and has been listed out as an extension project for the already existing drilling project. Currently, the project is in clearance phase. The environment clearance for the project is expected by Q1 2018. The forest clearance and CRZ clearance for the project are not required. RFQ for the following equipment are expected shortly for: Cementing Unit, Blow Out Preventer, Pressure Gauge, Valves and Well Chemicals. There has been a slight change in the RFQ dates as well. Further RFQs are expected shortly.
8Project Event: RFQs for the equipment are expected by January 2018 instead of December end 2017.
8Expenditure Approval: Q3/2016
8RFQ Date: 30/Jan/2018
8Release Date: Feb/2018
8Start Date: Apr/2018
8Completion Date: Q4/2022
Click here for more information
8Project Name: Greenfield 2G Ethanol Bio-Refinery
8Project Cost: Rs 900 Crore
8Project Description: An existing company along with EPC contractor and licensor is planning to construct an ethanol plant based on the DBT-ICT 2G Ethanol technology developed indigenously to produce 60 KL fuel-grade ethanol per day, primarily from biomass and will use approximately 1.5 Lakh tons of biomass per year.
8Project Event: RFQ for equipment is expected by February 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Feb/2018
8Release Date: Apr/2018
8Start Date: Q2:2018
8Completion Date: Q1:2022
Click here for more details.
8Project Name: Additional Tankage POL Terminal Project
8Project Cost: Rs 9 Crore
8Project Description: An existing company along with EPC contractor is planning to expand its existing capacity by constructing a new Ethanol tank with a capacity of 1600 KL. The capacity will then go up from 76017 KL to 77617 KL.
8Project Event: RFQ for civil work is expected by mid of the January 2018.
8Project Event: RFQ for erection and installation is to be expected by March 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q2:2018
8Completion Date: Q1:2019
Click here for more details.
Details
8Project Name: Hydroelectric Plant (Unit - 3) Maintenance Project
8Project Cost: 11 crores
8Project Description: The owner has planned a 7-day scheduled maintenance of Unit-3 (28.94 MW) in the 77.34 MW Hydroelectric Station, covering annual inspection and overhaul of equipment which includes overhauling and R&M works of auxiliary parts of the turbine-generator set, bearing sets and seals.
8Equipment required will be turbine bearings, gland seals, pipes, guide vanes seal, spiral casing, spiral drain valve, fasteners, among others.
8Project Event: RFQs for equipment are expected by first week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 20/Jan/2018
8Release Date: Feb/2018
8Start Date: 19/Mar/2018
8Completion Date: 25/Mar/2018
Click here for more information
8Project Name: Renovation and Modernisation of ash slurry disposal system in Thermal Power Station
8Project Cost: 6 crores
8Project Description: The owner is planning to renovate and modernize its ash slurry disposal system for unit 1, 2 and 3 in the 1050 MW (5*210 MW) Thermal Power Station. The design capacity of the present pumps contains 19% ash content, whereas the coal now being used contains ash content of 40 to 45%. Due to this the height of the ash dyke and the length of the discharge pipe line has been increased but the existing arrangement is not advisable for the long term due to its proximity to the cooling water outlet channel. The owner will now renovate and modernize the existing ash slurry disposal system for long term needs, and the project is under proposal stage for obtaining administrative approval.
8Project Event: RFQ for R&M of ash slurry disposal system is expected by February 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Apr/2018
8Completion Date: Jun/2018
Click here for more information Details
8$15 billion Indian plan for a land-sea route to Afghanistan: The Iranian port of Chabahar provides India with an easier land-sea route to Afghanistan. The Indian government has committed $500 million to Chabahar but that will be only a part of a sprawling artery of roads and railways which is estimated to cost $15 billion. India has finalized a plan to build a 900 km railroad from the Afghan province of Bamiyan to Chabahar Port. It has also already spent $100 million on building a 220km road in the Afghan province of Nimruz, which will be extended to Chabahar. Find out more on India's grand plans. Click on Report for more.
8Gas compression and dehydration business offers high returns: Find out how operating margins of up to 35% are possible. Click on Report for more.
8India is set to surpass China as the biggest importer of liquefied petroleum gas (LPG) this month. Find out more about what are the implications of this change. Click on Report for more.
8Transformation of Asian Oil Fields Ltd: Find out more on the dramatic transformation of Asian Oil Fields Ltd after its takeover by Oilmax. The company sees a massive opportunity not just in the seismic industry but in the O&M segment, among others, not just in India but abroad. Click on Report for more. 
8New 3D seismic technology: A new multi-channel 3D cable-less real time seismic data acquisition technology is changing the dynamics of the Indian seismic industry. Click on Report for more.
8A pilot electric vehicle charging network coming up. The government is putting up the network in a hurry to test out whether the model will work. Find out more. Click on Report.
8Bharat Forge Ltd (BFL) is betting big on a push from the oil & gas industry. This will be on the back of the Make in India initiative. Find out more. Click on Report.
8The American Chamber of Commerce's pre-budget memorandum: The oil & gas sector figures prominently in it. Find out what specific issues about the industry bother the Chamber. Click on Report for more.
8There is a big SAP conference coming up in the oil & gas industry. Predictive maintenance, digital transformation, supply chain management, digital refinery, project planning, digital energy networking are among the issues to be discussed. Find out how you can benefit. Click on Report for more.
8What is the future of coal-based generation in India. Get into a discussion on the subject, if you are interested. Click on Report for more.
8Find out more on how HMEL gets one of the highest propylene yields in the country. Click on Report for more.
8Singed by riots, Myanmar may not seem like an attractive destination for Indian capital but it still is. Find out how. Click on Report for more. 
8The bulls are in control in the international crude market and the Asian premium is holding firm. click on Report for more.
8Indian companies have done well in the latest 2017 global rankings. Know more. Click on Report. Details
Why is HOEC considered a winning horse among private sector E&P companies?
8Also know more about how in the E&P space in India, more such players can still emerge
8What is needed is astute planning, experience and people who know the environment well
8E&P in India can provide very high returns for investors from all over the world
8HOEC's example illustrates the case
Comment: For the intrepid investor, the website has put together a best-in-class team of multi-disciplinary experts who can help identify the right investment prospect, source the right people and the equipment and services that you will eventually need to get that attractive return on investment.
Click on Reports for more. Also, go to our Consultancy Page under Products and Services on our website for more on what we can offer Details
The introduction of the GST has impacted the oil sector in many more ways than one.
8The exclusion of petroleum products is just one of the issues
Among the problems plaguing the industry are:
8The allowing of C form for purchase of excluded oil & gas products only for limited manufacturing activities and high VAT rate on excluded petroleum products
8Substantial credit for capital goods to be reversed with 18% interest. There is also difficulty in figuring out assets excluded and included
8ISGT paid is a cost for the oil and gas industry; resulting in increased cost due to dual taxation
8No clarity on whether corporate office, zonal office concepts needed to charge GST on other units
8There are problems with credit reversal in case of service and trading turnover
8No clarity yet on inter-unit billing for transportation through pipeline: Is GST payable in each state for self-supply of transportation of goods to subsequent state?
8Transportation of petroleum products through pipeline falls under residuary entry in Schedule 3 and is taxable at a very high 18%
8GST is payable on stock transfer of goods between two registrations, and that is a problem
8Payment for acquisition of land for laying pipeline or construction of refinery comes under GST
818% GST is levied on goods used for setting up new refineries or expansion of an existing refinery
Click on Reports for more on these issues Details
Recent announcements that manufacturers will soon sell autonomous cars raise hopes that self-driving vehicles will soon be widely available and solve many transportation problems.
8Advocates predict that by 2030, such vehicles will be sufficiently convenient and affordable to displace most human-operated vehicles.
8But the transition is not going to be easy
8It is likely to be chaotic
8And while everyone believes the benefits will come in the 2020s, they will not for a long time to come.
8The projection of this analysis is that autonomous vehicles become common and affordable, probably on in the 2040s to 2060s, and some benefits may require prohibiting human-driven vehicles on certain roadways, which could take longer.
Find out more about why that is going to be so. Click on Report for more. Details
A two year three-well drilling contract is coming up
8There will be a need for 2000 HP onland rig and attendant facilities
8RFQs are expected shortly
Click on Reports for detailed information Details
Private infrastructure creation for the LPG industry is a high return industry
8So is the private distribution of LPG because the footprint of the public sector is not so heavy in this segment.
8Lending out private LPG infrastructure to the public sector is big business too.
8Find out how a handful of private companies are building their core competency here.
8Also know more about business development opportunities coming up.
Click on Reports for more Details
The website carries here a comprehensive Linear Programming (LP) model used by the oil & gas consultant to arrive at an optimal refinery configuration involving an expansion in India
8LP is a mathematical technique for determining the most optimum allocation of resources to achieve a particular objective when there are alternative uses for the resources.
8Optimizing the operation of refinery or the determination of the optimal configuration is a typical application of linear programming.
8The refinery is described by a set of given equations and/ or inequalities involving variables, and solved by finding the non-negative values of these variables which satisfy the equations and inequalities while also maximizing profits.
8This analysis involved the creation of a model that represented nearly 2000 equations and more than 2000 variables.
8The end result is an upcoming 5 MMTPA expansion and all other attendant relationships
8Find out the full range of parameters which get thrown up from this programming model.
Click on Reports for more Details
The rise in LNG prices is not treating some domestic gas suppliers very well
8Passing on the price hike is not easy as industrial customers are fickle on account of the economic situation on the ground.
8Striking the right balance between volumes and margins is turning out to be a big challenge.
8Higher penetration is the way to go
Click on Reports to know more Details
The government's clarification that pet coke will not be banned across India has come as a big relief to the industry.
8International prices have begun settling down after this.
8Talk of a ban had sent jitters across various segments of the Indian industry
8Various categories of industries, such as cement, thermal power plants, fertilizers, nitric acid, lime kiln, ceramic, glass, foundry, reheating furnaces, calcium carbide, aluminium, boiler-based industries and others were using pet coke and furnace oil for various purposes
Click on Reports for more Details
You get a dedicated analyst with your subscription to our project monitoring website. No other website offers this advantage. And the subscription comes at an incredibly low price.
8 Dispel your doubts on a project and check out the rumors. Just get across to your dedicated analyst. Talk to him and he will check out the facts and get back to you within a given timeline.  
8He will be available between 9.30 AM to 6.30 PM IST, Monday through Friday. And all you have to do is to call him or send him a mail. In every project that you look at, you will get an opportunity to check out the facts with him
8Primary collection of project related data is conducted by trained mechanical engineers at our back end. We usually spend months training an engineer on the fine art and skills of collecting information.
8So whenever you speak to your analyst, he will most likely be aware of much more than what is available in the database. Do check him out. 
8We admit that data collection for projects is a vast exercise and it may not be possible to find all the answers
8But if you were to ask your dedicated analyst to clarify a rumor you have heard or a fact that you want double checked, just get across to him. He will help you out.
You can check out the following facts about any project:
8Validation of future RFQ dates, capital approval date, start up date or a commissioning date
8Details on specific equipment and service requirements coming up in the future 
8Information on possible forward movement in case of delay
8Key project related contacts, at the level of the owner or the contractor. Fully validated, so all you have to do is call and fix an appointment. 
8Extra information on maintenance schedules, annual contract expiration or retendering dates  
You can find out more on the 
8Energy matrix of an industrial facility, whether fresh demand is coming up 
8Technology in use 
8Raw material consumed or likely to be in demand
8Intermediate and finished product data 
8Maps and directions 
We have been in the business for two decades now. No one gives you project information like we do Details
For reference purposes the website carries here the following tenders:
8Supply of Sensors for Gas Detectors Details
8
Supply of Portable Gas Detectors Details
8Supply of Gas Detectors Details
8 Carrying out 2D-HR, UHR, MBES, SBP and Coring surveys at CPP location of KG-DWN-98/2 Project Details
8Procurement of Bitumen Details
8Supply of Linear Styrene-Butadiene-Styrene at refinery Details
8Consultancy Services for Market Study of Ammonia, Carbon Dioxide and Hydrogen Details

8Support Service for Maintenance of Compressors in all units of refinery Details
8Installation of Pipeline across Soan River Crossing by HDD Technique using Intersect Method for Pajpl-Una Branch Pipeline and associated works Details
8Carrying out T4S audit of PRRPL as per PNGRB regulations Details
8Inspection, repair and balancing of Drive Turbine Rotor of Hot Oil Pump of LAB plant in refinery Details
8Supply of Chemical Neutralization Agent for Panipat Refinery and Petrochemical Complex Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Indian manufacturing in downtrend in December: SBI Details
85 sectors that may see earnings recovery in 2018: Harish Krishnan, Kotak MF Details
8India challenges China as world's biggest LPG importer Details
8Moody’s lowers Oil India’s credit rating on acquisitions Details
8NOC says decline expected in Libya's oil exports post pipeline explosion Details
8IOC to source 10 per cent of crude requirement from own assets: Chairman Details
8Sensex gets off record level, oil risks linger Details
8Libya needs a week to repair blown-up crude oil pipeline: NOC Details
8PIL in Gujarat HC against use of petcoke, furnace oil Details
8Govt’s LPG subsidy burden increases as crude prices soar Details
8Essar Oilfields commences drilling contract with Mercator Petroleum Details
8Aviation: Pricier crude may shift focus to yields in 2018 Details
8Vedanta Ltd to buy majority stake in Japan's AvanStrate Inc from Carlyle Details
8Japan's Jan kerosene sales likely to stay steady year-on-year - JXTG Details
8Global crude oil prices near 2015 highs on tight market due to supply cuts Details
You can also click on Newsclips for more   
Details
8Project Name: Refinery Expansion Project
8Project Cost: Rs 27000 Crore
8Project Description: An existing company is planning to expand its existing 1 MMTPA refinery to 10 MMTPA by installing new 9 MMTPA crude distillation unit at its refinery. The pre-feasibility study was completed by Engineers India Limited and the project is awaiting various approvals.
8Project Event: RFQ for hiring DFR consultant is expected by January 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q3:2018
8Completion Date: Q2:2022
Click here for more details.
8Project Name: LPG Bottling Plant Greenfield Project
8Project Cost: Rs 116 Crore
8Project Description: An existing company along with EPC contractor is carrying out the engineering activities to install an LPG bottling plant with a capacity of 120 TMTPA by constructing 3 X 350 MT mounded storage vessels. At present civil work is going on.
8Project Event: RFQ for erection and installation work is expected by March 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Mar/2018
8Release Date: Apr/2018
8Start Date: Q3:2017
8Completion Date: Q2:2019
Click here for more details.
8Project Name: Oil Field Development
8Project Cost: Rs 150 crore.
8Project Description: Promoter is planning development of an Oil Field. The block had been awarded to the company in Discovered Small Fields round in 2016. Currently, the project is in pre-planning stage. The company is in process of carrying out oil and gas field study so as to estimate the possible oil reserve. Further RFQs for the project are expected shortly.
8Project Event: RFQs for hiring various oil and gas services is expected by Q1 2019.
8Expenditure Approval: Q2/2018.
8RFQ Date: Q1/2019.
8Release Date: Q2/2019.
8Start Date: Q4/2019.
8Completion Date: Q4/2021.
Click here for more details

8Project Name: Greenfield Early Production System Development.
8Project Cost: Rs 250 crore.
8Project Description: Promoter has proposed to set up an Early Production System. The project would also involve laying of a pipeline to the GGS from the oilfield. The proposed facilities in this project are: HP Separator Skid, CO2 and Moisture Removal Skid, Dew Point Depression Skid, N2 Based Skid, Produced Water Storage and Bay Facilities and Other Utilities and Offsites. The equipment requirement will be Gas Turbine, Air Compressor, Storage tanks, Well Head, Water Injection Well, Flare Stack,Gas pipeline.
8Project Event: RFQ for the civil works can be expected by Q2, 2018 instead of January 2018.
RFQ for equipment is expected by Q2 end 2018.
8Expenditure Approval: Q2/2016.
8RFQ Date: Apr/2018
8Release Date: May/2018
8Start Date: Q2/2018
8Completion Date: Q3/2019
Click here for more information
Details
8Project Name: Hydroelectric Plant (Unit - 2) Maintenance Project
8Project Cost: 11 crores
8Project Description: The owner has planned a 4-day scheduled maintenance of Unit-2 (28.94 MW) in the 77.34 MW Hydroelectric Station, covering annual inspection and overhaul of equipment which includes overhauling of auxiliary parts of the turbine-generator set, bearing sets, seals.
8Equipment required will be turbine bearings, gland seals, pipes, guide vanes seal, spiral casing, spiral drain valve, fasteners, among others.
8Project Event: RFQs for equipment are expected by first week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 8/Jan/2018
8Release Date: 25/Jan/2018
8Start Date: 22/Feb/2018
8Completion Date: 25/Feb/2018
Click here for more information
8Project Name: Super Thermal Power Greenfield Project
8Project Cost: 14336 crores
8Project Description: The owner along with Bharat Heavy Electricals Limited as an EPC Contractor, Alstom India Pvt Ltd as the Boiler Contractor and the Amans Group as sub-contractor continues with the construction and erection of the 1980 MW (3*660 MW) Greenfield Super Thermal Power Project. M/s Herbin Air Conditioning Co. Ltd. has been awarded the contract for air cooled condenser. Casting of TG Deck of Unit-1 was done on 12th April 2017. Casting of TG Deck Unit-2 is in process. TG erection work has been awarded to PowerMech Projects Ltd. BHEL will itself carry out the procurement for turbine. 
BHEL will now float RFQs for an electrical equipment which includes transformer, generator, bus ducts, relays, circuit breaker, capacitor bank, insulators and conductors, among others.
8Project Event: RFQs for electrical equipment are expected by Q2 2018.
8Expenditure Approval: Mar/2014
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Feb/2016
8Completion Date: Mar/2021
Click here for more information Details
 We have built a unique first-of-its-kind database of oil gas contacts in the country.
 
8Unlike a regular directory, very contact in our project monitoring software comes with a rich tapestry of information on the industrial facility and the unit in which the contact is present, along with attendant business development prospect, if any, around the contact. Every contact information is validated by our team of in-house analysts -- who are all mechanical engineers rigorously trained to look for little details -- on a regular three-monthly basis.
Around a contact within an industrial facility we give you a whole lot of additional information including:
-- Technology parameters
-- Design and actual Input-Output data for every raw material and product
-- Multi-parameter utility matrix
-- Long term maintenance contracts
-- Feedstock data
-- NIC codes
8A facility is further split up into its individual units and for each unit we have a similar set of parameters as in the facility
8And for each unit or facility, we have a resultant business development prospect, either in terms of maintenance prospect or a capital project, be an additional expansion or debottlenecking or a revamp or a new capital project
8The point to note is that we are always looking ahead and never behind, giving you exclusive information not on a tender that is already out but on a genuine future prospect, which may be a month, six months, a year or two years away from being tendered out.
8Having worked in the business for more than two decades, we know what you are looking for.
8India has so far had a poor business prospect database because the existing databases do not fulfill the requirements of a business development manager. What we have done is just plugged that gap
8For you, a deal can just be a phone call away
 
Contact us or fill up the registration form for a demo of what we have to offer Details
Energy Saving-cum- Ammonia-Urea Expansion Project 
8Cost - Rs 540 Crore
8Project Description: A Fertilizer Company has hired an EPC contractor, which has completed the Detailed Feasibility Report for the energy saving-cum-expansion project which will reduce energy consumption of urea from 6.5 Gcal/t to 5.75 Gca//t, ammonia from 9.6 Gcal/ ton to 8 Gcal /ton while enhancing ammonia capacity from 240900 MTPA to 328500 MTPA and urea from 419750 MTPA to 569400 MTPA in India. The project currently awaits environment clearance. The EPC contractor will begin taking out RFQs for equipment shortly. The equipment requirements are Compressors, Turbines, Exchangers, Vaporizers, Subcoolers, Filters, Pumps, Heaters, Towers, Vessels, Storage systems, Cooler, Furnaces, Stacks, Converters, Boilers, Drums, Blowers, Economizers, Preheaters, Reactors, Tanks, Reactors, Evaporators, Condensers, Separators, Ejectors, Absorbers, Prilling towers, Absorbers, Heat exchangers, Columns Generators and many more
8Project Event: RFQ for equipment is likely to be released in Q1 2018
Click here for more information
SSP-Sulphuric Acid & NPK Fertilizer Expansion Project
8Cost - Rs 75 Crore
8Project Description: A Fertilizer Company is awaiting environmental clearance for the expansion of its Single Super Phosphate capacity from 140000 TPA to 580000 TPA, Granulated NPK Fertilizer from 45000 TPA to 440,000 TPA and Sulphuric acid from 40000 TPA to 140000 TPA in India. The equipment requirements are Crane, Hopper, Feeder, Conveyor, Valve, Grinding Mill, Tank, Separator, Pump, ID Fan, Collector, Generator Mixer, Den, Scrubber, Screen, Mill, Elevator, Drum, Furnace, Cyclone, Blower, Fan, Belt, Weighing machine, Steam Turbine Generators, Economizers, Reheaters, Boilers, Sulphur Combustor, Drying Towers, Absorbers, Absorber Exchangers, Sulphur filters, Sulphuric Melting Tank, motor, Pumps and more
8Project Event: RFQ for a contractor is likely to be released in January 2018.
Click here for more information
Details
For reference purposes the website carries here the following tenders:
8Hiring of TPI services for inspection and CP survey of offshore pipelines and subsea structures Details
8
Procurement of One Level Control Valves for Dahej Plant Details
8Procurement of Chemicals for Rajasthan Kutch-Onland Exploratory Asset Details
8Procurement of Gas Line Corrosion Inhibitor (GCI) for B&S Assets Details
8Hiring Contract for carrying out Public Awareness Program at nearby ROU villages of Pipeline under Vijaipur, Kota, Bhilwara and Chhittorgarh Details
8Procurement of various types of Valves for LPG, C2C3 Recovery and HVJ Plant Details
8Hiring of Technical Consultant for G&G and other studies for OALP Bid Round 2017 Details

8Procurement of Line Pipes for LPG Import Terminal Facilities Project at Haldia Details
8Supply of Level Transmitters for Rochester Gauges at Bottling Plant Details
8Inspection and Refurbishment of Hot Oil Turbine Rotor at OEM works and spares required for refinery Details
8Obtaining NOC for installation and commissioning of Mounded Storage Vessels and Underground HSD tank Details
8Support Service for upkeepment of Instruments in various process units and Instrument workshops at refinery Details
8Carrying out Comprehensive Risk Analysis study of refinery Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8Engineering and construction major L&T bags orders worth Rs 3,355 crore Details
8China halts oil product exports to N.Korea in November as sanctions bite Details
8China probes 17 gas firms in anti-monopoly investigation -state planner Details
8China becomes world's No. 2 LNG importer in 2017, behind Japan Details
8Top India oil explorer to buy, not drill, its way to output goal Details
8India business optimism positive, but slides to lowest in 4 years: Report Details
8Tata Group needs simpler management and organisation structure: N Chandrasekaran Details
8India cuts 2017-18 fuel demand growth estimate to 4.5 percent Details
8GEECL aims to raise production with Rs 2,500-cr investment Details
8India’s biggest explorer to buy, not drill Details
8Essar Oilfields commences drilling on Mercator Petroleum contract Details
8Top Indian oil explorer to buy-not drill-its way to output goal Details
8Diesel, petrol prices soar across states as crude oil surges on good demand Details
8Crude oil prices at 2 year high Details
8Indian economy on the upswing Details
You can also click on Newsclips for more   
Details
8Project Name: Drilling Site Hydrofracturing
8Project Cost: Rs 8 crore.
8Project Description: Promoter is planning hydraulic fracturing work primarily in the various oil fields. The reservoir characteristics of the oil fields have wide variations ranging from shallow depth to depth more than 2000m. The requirement from promoter's end for Hydrofracturing services will be for lightweight ceramic/sintered bauxite proppant having a preferable mesh size of 20/40 & 16/30 respectively. An annual requirement of 1000 MT of proppant is expected from promoter's end.
8Project Event: RFP for the 20/40 proppant is expected by January end 2018 instead of December 2017.
RFP for the16/30 proppant is expected by February end 2018 instead of December 2017.
8Expenditure Approval: Sep/2017.
8RFQ Date: 25/Jan/2017.
8Release Date: Feb/2018.
8Start Date: Q1/2018.
8Completion Date: Nov/2019.
Click here for more details

8Project Name: DG Set Hiring
8Project Cost: Rs 5 crore
8Project Description: Promoteris planning to hire Diesel Generators (DG Sets) for various ongoing projects at its Asset. The project involves supply as well as maintenance of Gensets on an annual contract basis for an overall period of 3 years. The contractor shall be responsible for the supply of fuel. Further RFQs for the project are expected shortly.
8Project Event: RFQ for hiring Diesel Gensets are expected by January 2018.
8Expenditure Approval: Q4/2017
8RFQ Date: 20/Jan/2018
8Release Date: Feb/2018
8Start Date: Mar/2018
8Completion Date: Mar/2021
Click here for more information
8Project Name: Refinery BS-VI Greenfield Project
8Project Cost: Rs 513 Crore
8Project Description: An existing company along with EPC contractor and licensor is planning to construct an IndselectG unit with a capacity of 80 KTPA to reduce sulphur from the indmax light gasoline and coker gasoline for making MS components to meet BS-VI MS pool specification at its refinery. RFQ for the horizontal centrifugal pump and underground pipes are already out and the selection process is under completion.
8Project Event: RFQ for procuring rest of the equipment is expected by January 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Jan/2018
8Completion Date: Q1:2021
Click here for more details.
8Project Name: Brownfield LPG Bottling Plant Expansion
8Project Cost: Rs 100 Crore
8Project Description: An existing company is planning to expand its LPG bottling plant capacity from 1000 MT to 2500 MT by constructing new 3 X 500 MT mounded storage vessels. Environmental clearance was granted by June 2017. Some of the equipment is ordered and rest of the equipment is under tendering. At present Civil work is going on.
8Project Event: RFQ for the erection and installation work is expected by February 2018.
8Expenditure Approval: Q1:2017
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Jul/2017
8Completion Date: Q1:2019
Click here for more details.
Details
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 1000 crores
8Project Description: The owner along with an EIA consultant is planning to construct a 120 MW (2*55 MW surface power-house + 2*2.5 MW+1*5 MW auxiliary power-house) hydroelectric greenfield hydro power plant. EC has been accorded on 05 December 2017. The forest clearance FC-I has been approved by the Assam State Government and sent to the MoEF. The proposed project will be funded by the Asian Development Bank. The levellized tariff for the project is Rs. 3.37/unit. The owner will come out with package wise bids for the project, of which civil and infrastructure package is soon to come out.
8Project Event: RFQ for civil and infrastructure package is expected by Q1 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: Q1:2018
8Release Date: Q3:2018
8Start Date: Q2:2019
8Completion Date: Q4:2023
Click here for more information
8Project Name: Hydroelectric Plant (Unit - 1) Maintenance Project
8Project Cost: 14 crores
8Project Description: The owner has planned a 10-day scheduled maintenance of Unit-1 (28.94 MW) in the 77.34 MW Hydroelectric Station, covering annual inspection and overhaul of equipment which includes overhauling of auxiliary parts of the turbine-generator set, bearing sets, seals, check all fasteners of upper and lower air baffles.
8Equipment required will be turbine bearings, gland seals, pipes, guide vanes seal, spiral casing, spiral drain valve, fasteners, among others.
8Project Event: RFQs for equipment are expected by first week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 7/Jan/2018
8Release Date: 24/Jan/2018
8Start Date: 12/Feb/2018
8Completion Date: 21/Feb/2018
Click here for more information Details
8Get the latest announcements by global automakers in 2017  for the launch of electric vehicles. The number of projected models are set to go up dramatically. Click on Report for more.
8Find out more on how ONGC's drilling contract for a CBM block is coming undone. The E&P major may have to re-tender the project, thereby allowing for a business opportunity here. Click on Report for more.
8800 million people in India still do not have access to LPG, a study has shown. How much of it is on account of lack of access or lack of education on the hazards of indoor pollution or lack of affordability? A new study is trying to get to the root of the problem. Find out more. Click on Report.
8Find out more on the GMR Kakinada Special Investment Region. Click on Report for more.
8What are the business development opportunities available in China's One Road One Belt programme? Click on Report for more. Details
The evolution of the electric car is of profound interest to the oil & gas industry in India which still hasn't factored in the coming revolution
8The mileage projections of EVs are is growing. What was projected in 2015 is significantly lower than what is the reality now. The average mileage of a car is now around 500 km. Mileage projections made in 2017 are carried here up to 2030 as per vehicle type
8Latest battery pack cost projections by 2030 by leading research agencies are also carried here. The low side of the estimate pegs it at very competitive $73 per kwh
8The likely prices of different types of EVs going up to 2030 are projected here as well. Cost per mile is going down rapidly.
8Fuel cell vehicles are also going to be rapidly on the rise
Click on Reports for more Details
Where is India headed now in the electric vehicle revolution?
8Latest data indicate that the annual total cost (ATC) of ownership of a commercial three-wheeler is already lower than a conventional unit and post BS-VI, the differential will widen to 25%. What is more, the purchase cost too is expected to be lower. A mild push by the government can bring about a wholesale transformation of the market
8The ATC of a two wheeler is currently 6% higher than its petrol counterpart but post BS-VI, this cost will be 13% lower, according to latest estimates. The purchase cost will equal out too
8As for commercial passenger vehicles, current ATC is 18% higher but post BS-VI, the cost will come down by 4%. The purchase cost of a diesel vehicle will be higher than an EV while petrol cars will be cheaper.
8As for privately owned vehicles, the ATC differential will come down from 40% now to 10% post BS-VI.
8A component-wise cost structure comparison of a conventional and a battery car is given here, showing where the differentials arise
Click on Reports for more Details
The website also carries here full details of the Indian electric vehicle manufacturing business.
8Detailed plans of major companies involved are carried here in different segments of the industry.
8Also find out more on the progress made in the plans to buy 20,000 electric cars by the government.
8The auto component segment is likely to undergo a dramatic change, with some segments going to be severely hit. Which are the companies likely to be hit hard and which will do better? Get a company-wise analysis.
8How is the charging infrastructure coming up?
8The electric revolution is going to have a huge impact on the industrial economy.
8Oil companies need to keep a close watch on what is going on and how realistic is the government's plan is to go all electric by 2030. What are the projected EV numbers going ahead and how will diesel and petrol consumption be impacted?
8Find all the answers here
Click on Reports for more Details
Industry 4.0 is here, with artificial intelligence, internet of things and cloud computing.
8Where is the talent in India and which industries is in demand? What kind of talent is needed to go to 4.0?
8Is the oil industry prepared for the transition? 4.0 is going to profoundly influence the world of the Indian oil & gas professional.
8And as a professional, are you tuned in to 4.0?
8Where are the new opportunities here?
8Get to know more about the 9 technologies which are transforming this world.
8In India, people with relevant domain skills are readily available in the market, but they need to collaborate with domain leaders from the oil & gas industry.
Click on Reports for more Details
A Rs 15,000 crore downstream business development opportunity is coming up.
8This will be a 5 MMTPA refinery expansion
8Alongwith, there will be an expansion of attendant units and offsite
8An investment an additional Rs 1000 crore is planned in value-added products
Click on Reports for full details Details
Is Bangladesh coming dangerously close to China and it is likely to see India as "enemy" again?
8Here is a full update on the massive extent of the Chinese intrusion into the Bangladesh economy
8As Bangladesh gets more fully entrenched in the Chinese One Road One Belt programme, the space for Indian industry will get that much more squeezed
8The Chinese invariably demand full political commitment from their partner countries in return for billions of dollars of investments.
8Will Bangladesh have to give up India in return for its Chinese affiliations?
Click on Reports for more Details
For reference purposes the website carries here the following tenders:
8Hiring of 20 KVA DG Set on firm basis at GSPC Warehouse, Kerala GIDC for onshore blocks Details
8
Carrying out Turnaround Jobs in Process Units in CCU RRS and CO Boiler Systems at refinery Details
8Carrying out Chemical Cleaning in CCU turnaround during April 2018 Details
8Invitation of bids for LSTK Package for NHT, PENEX and balance of units for Ms Block Project at refinery Details
8Floating of EOI for setting-up of 65 KV, Micro Turbine at Linch GGS Details
8Installation and Commissioning of Ultrasonic Flaw Detectors Details
8Carrying out Ultrasonic Thickness Gauging of Pipings and Static Equipments at refinery Details

8Carrying out Scaffolding jobs for MI shutdown 2018 of various Process Units and Offsite Area and other Miscellaneous Works at refinery Details
8Removal and Refixing of Insulation in various insulated tanks for Tank M and I jobs at refinery Details
8Carrying out Onshore Pipeline Survey for Ratnagiri Refinery and Petrochemical Project Details
8Reconditioning of Piston rod of Make Up Gas Compressor and Off Gas Compressor installed at new unit area of refinery Details
8Expert supervisory services during the overhauling of Flowserve make pumps in refinery Details
8Replacement of Refractory Lining in PG Boiler of HGU during forthcoming shutdown in refinery Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8After a three-year dream run, Modi's luck may slip on oil next year Details
8Natural gas may come under GST in 2018 Details
8Iraq invites companies for interest in building new Kirkuk-Ceyhan oil pipeline Details
8Reliance aims to become big clean energy provider: Ambani Details
8As energy markets evolve, blockchain powers up Details
8UN slaps new sanctions on N Korea, limits petroleum access Details
8Oil producers to discuss exit plans from cuts once market near balance: Russia Details
8Iraq aims to increase Nasiriya oilfield output to 200,000 bpd in few years Details
8Fuel shortage in oil-rich Angola tests new president Joao Lourenco Details
8Singapore firm Keppel Offshore & Marine to pay $422 million in corruption fines Details
8Reliance to be amongst the top 20 companies in the world: Mukesh Ambani Details
8Gujarat Gas hikes natural gas rates for industry by Rs 2.5 per unit Details
8Chinese customs seizes $13 million worth of smuggled fuel Details
8GST made 2017 most significant year for economy since Independence Details
8Russia's Gazprom Neft sees 2018 investment programme unchanged Details
82017 in Retrospect: Despite 'Trump effect', global climate change momentum gains Details
8IOC, BPCL keen to acquire GAIL; company wants to merge with ONGC Details
8Budget 2018: Government spending, deficit in focus ahead of budget Details
8War in middle east could drive up oil prices to $80 in 2018, warns nomura Details
8Oil prices near June 2015 high as production cuts tighten market Details
8U.S. regulator proposes scaling back offshore drilling safety rules-WSJ Details
You can also click on Newsclips for more   
Details
8Project Name: Hydro Power Station Maintenance Project (Unit - 3)
8Project Cost: 16 crores
8Project Description: The owner  has planned a 20-day scheduled maintenance of Unit-3 (157 MW) in the 785 MW Hydro Power Station covering annual inspection and overhaul of equipment which includes overhauling of auxiliary parts of the turbine-generator set, bearing sets, seals, governor and oil cooling unit.
8Equipment required will be turbine bearings, gland seals, pipes, guide vanes seal, spiral casing, spiral drain valve, among others.
8Project Event: RFQs for equipment are expected by first week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 5/Jan/2018
8Release Date: 28/Jan/2018
8Start Date: 20/Feb/2018
8Completion Date: 11/Mar/2018
Click here for more information
8Project Name: Thermal Power Plant - FGD Addition
8Project Cost: 300 crores
8Project Description: The owner is scheduled to install an FGD for a 600 MW super-critical thermal power complex. The company is expected to float tenders for the same. At present, feasibility studies are ongoing by the owner. The project start date is slated for early 2020. RFQ for supply of FGD is expected to be out by Q3 of 2018. The major requirements will be FGD, stacker- reclaimer, earthwork, cranes, pipes, installation, gypsum disposal, wet lime among others.
8Project Event: RFQ for supply of FGD is expected to be out by the Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q1:2019
8Start Date: Q1:2020
8Completion Date: Q2:2022
Click here for more information Details
8ONGC has put together a Fraud Prevention Policy. Find out more on how it works. Click on Report for more.
8The government is trying to push methanol as a clean energy option. The plan seems to be to covert high ash coal, stranded gas, and biomass into ethanol. Find out what it is trying to do. Click on Report for more.
8Oil marketing companies are together setting up five Emergency Response Centres capable of responding within a 300-km radius. Find out more. Click on Report.
8Here is a backgrounder on Mozambique, where the Indian trio is heavily invested in trying to set up an LNG project off the country's coast. The desperately poor but resource rich country is fraught with political risks that these companies should not ignore. Click on Report for more.
8China’s burgeoning refining capacity has transformed China into a net exporter of refined petroleum products and capacity expansion will likely shift further down the value chain towards high-value chemical feedstocks. Click on Report for more.
8After a slow period with rates sliding for all the major VLCC-routes we have this week seen a 180 degree turn. Click on Report for more.
8Find out more on how OPEC and China are forging a special relationship with a special China chapter to be written by Chinese analysts in the prestigious World Oil Outlook. India should follow in Beijing's footsteps and strike a similar deal with OPEC. Click on Report for more.
8A Rs 2500 crore oil & gas R&D centre is coming up. It will have oil & gas processing test facilities, pilot plants, steam-based reaction test facilities, polymer foam testing plants, bitumen/asphalt/concrete and emulsion blending & testing facilities, catalyst preparation & testing pilot plants,  fouling & corrosion testing facilities,  distillation research and testing units; flow assurance test facilities, styrene monomer and propylene oxide derivatives research pilot plants, among others. Find out more. Click on Report.
8Qatar, from where India imports the bulk of its LNG, has one of the highest per capita incomes in the world. Yet imports are rising, real estate prices are falling and hotel occupancies have fallen. Find out more. Click on Report. Details
Find out more about how an Indian software company worked with an oil & gas supermajor to dramatically change their supply chain and demand forecasting backend in its lubes division.
8The deliverables were astonishing:
--
A 30% reduction in forecast errors
-- 30% reduction in safety stock
-- 10% reduction in cycle stock
-- And a Rs 100 crore reduction in supply chain costs
8Indian companies should try this out, given that the benefits come in within a few months
Click on Reports for more Details
Now that the award of three more ammonia-urea projects has been settled, the demand for gas from the fertilizer sector is likely to see a sharp increase beginning early 2019.
8A CBM based urea plant was recently commissioned but it will eventually end up seeking more natural gas.
8The website carries here an overview of the fertilizer sector and its peculiar cost-plus dynamics. India's import dependence for urea is coming down, and some optimists think that the country in fact can become an exporter of urea.
8The likely commissioning dates of new projects do not necessarily mean a higher offtake of LNG as the commissioning dates are likely to match with first gas from the KG Basin developments.
8But going ahead, if new urea projects get traction, more capacity can come up, as India's demand for urea will continue to rise on the back of the government's attempt to increase farm income and productivity.
Click on Reports for more details
Comment: Our software can provide the best estimates of commissioning dates of urea units as we update our data on a continuous basis. If you are looking for gas a connectivity matrix of the fertilizer industry as a whole, regulated and non-regulated, and the incremental likely increase in gas demand, subsequent to expansion of de-bottlenecking, you will get it all with us. Our market demand estimations are the best because of our continuous connection with what is happening on the ground Details
8The biofuel business in India is expected to touch 50,000 crore by 2022.
8For the intrepid entrepreneur, the website carries here the list of such projects which can be set up
Click on Reports for more Details
We have been monitoring fertilizer projects for the last 15 years but now a new software format has allowed us a 100% coverage. We provided very detailed project related information on the entire fertilizer fertilizer sector. Our services include:
-- A 100% catch of all equipment and service requirements going ahead in the industry
-- All raw material requirements
-- Daily fertilizer prices, domestic and international
-- A rich database of information on the fertilizer sector
-- Our regular 100% coverage of the sector in terms of reports, news and analyses

NPK Fertilizer Greenfield Project  
8Cost - Rs 1517 Crore
8Project Description: ThyssenKrupp Industrial Solutions (India), Tecnimont Private Limited, Intexa- Tata Project are in the race for a greenfield NPK Fertilizer unit. The techno-commercial discussion has been completed and price bids are to be opened. The equipment requirements are Feeding hoppers, Electronic belt scales, Conveyors, Mixers, Crushers, Granulators, Dryers, Feeders, Coolers, Elevators, Blowers, Collectors, Towers, Chimneys, Drums, Bins, Screens and more
8Project Event: RFQ for EPC contractor was floated in February 2017 and price bid is likely to be opened in January 2018. The EPC contractor is likely to be finalized in February 2018.
Click here for more information
SSP Annual Maintenance Project  
8Cost - Rs 0.20 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in April 2018 at their existing fertilizer complex in India. The existing capacity is made up of 100000 MTPA of SSP.
8Project Event: RFQ for equipment and services is likely to be released in March 2018
Click here for more information
SSP Annual Maintenance Project 
8Cost - Rs 0.15 Crore
8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in December 2018 at their existing fertilizer complex in India. The existing capacity is made up of 132000 MTPA of SSP.
8Project Event: RFQ for equipment and services is likely to be released in October 2018.
Click here for more information
  Details
For reference purposes the website carries here the following tenders:
8Providing Civil Works at "NKKDG" Drill Site and carrying out Pre and Post Rig Building Works Details
8MDPE Connectivity for City Gas Distribution Project at Bengaluru Details
8Carrying out Environmental Impact Assessment study and Rapid Risk assessment for Polyol/ Propylene Glycol/ Mono Ethylene Glycol Petrochemical Project Details
8Preliminary Feasibility Report for Ethylene Cracker and Associated Facilities at Rasayani Details
8Supply of Skid Mounted Chemical Injection Skid to refinery Details
8Compact Steam Trapping Assembly and Steam Supply Condensate Recovery Manifold for VGO-HDT Unit Details

8Supply of Spares of RGC Turbine and Compressor in refinery Details
8Procurement of Pipeline Gaskets at refinery Details
8Lining up of consultant for designing facilities to utilize Natural Gas within refinery Details
8Supply of Reciprocating Compressor Spares in refinery Details
8Carrying out Stevedoring/ Handling Jobs at Bedi Port for Thermal Non Cocking Coal/ Petcoke Details
You can also click on Tenders for more   
For reference purposes the website carries here the following Newsclips:  
8BP and Kosmos Energy partner on five Ivory Coast offshore oil blocks Details
8Saudi energy minister: premature to discuss potential changes in oil policy Details
8Iraq oil ministry says has started to take over operations of Majnoon oil field Details
8Oil market capped as U.S. output fast approaches 10 million bpd Details
8Qatargas signs deal to deliver LNG to Austria's OMV Details
8We are aligning our growth with the changing energy landscape: S. Thangapandian, Essar Oil UK Details
8Russia's Rosneft, BP agree to jointly tap Arctic oil and gas Details
8Putin, Saudi king agree to continue cooperation to keep oil prices stable Details
8Nigeria's state oil firm more than doubles fuel supply amid run on petrol Details
8Oil dips away from 2015 highs as rising US output weighs on outlook Details
8Oil refinery will destroy beauty of Konkan: Sena MLA Details
8Crude Oil prices edged higher Details
8Rising crude oil prices, fiscal slippage a concern, says Patel Details
8India’s time to capitalize on oil and gas sector Details
You can also click on Newsclips for more   
Details
Our project data comes with validated key contacts, detailing which stage and phase a project is, while matrixing individual equipment and service requirement going ahead. The point to note is that we generate future equipment and service RFQs either from the owner or the EPC contractors right through the life of a project, until commissioning. The software is now capable of throwing up detailed utility matrices, raw material demand outlines, shutdown details and individual equipment profiles. All these inputs are available in an easy-to-use way. And it comes embedded inside a best-in-class software. While benchmarking our unique software solution, we did not find a reasonable competitor, not just in India but in the world, for the features that we provide. Our analysts are all mechanical engineers, trained in-house for project monitoring purposes.
8Project Name: Offshore Field Development.
8Project Cost: Rs 500 crore.
8Project Description: Promoter is planning the development of an offshore block. The project involves drilling of oil wells, installation of a production platform, laying of the subsea pipeline. The drilling will be carried out using a jack-up rig. Currently, the project is in pre-clearance phase and the TOR for the project is expected by the end of February 2018. The company is in process of oilfield analysis, so as to estimate the actual potential of the oil reserve. Further RFQs are expected shortly.
8Project Event: RFQ for hiring an EIA consultant is expected by January end 2018.
RFQ for various oil and gas field services is expected by Q3 2018.
8Expenditure Approval: Q4/2017. 
8RFQ Date: 30/Jan/2018. 
8Release Date: Feb/2018. 
8Start Date: Jan/2019. 
8Completion Date: Dec/2022. 
Click here for more details 
8Project Name: Oilfield Redevelopment
8Project Cost: Rs 1200 crore 
8Project Description: Promoteris planning redevelopment of an oilfield to augment oil production. The project involves drilling of oil wells, revamping and upgradation of 2 GGS-cum-CTFs in the field and construction of a new ETP Effluent Treatment Plant (ETD) of 5000 m3/d capacity. After implementation of this scheme, cumulative oil production from the field is expected to be 20 MMT by the year 2029-30, with an incremental crude oil production of 4 MMT. 
The LSTK contract for the revamping of the GGS-cum-CTFs was awarded to HALOffshore Ltd for the bid price of Rs 400 crore. Currently, the work on the 2 GGS is going on since August 2017. The drilling part of the project would be done by ONGC itself. Further RFQs are expected shortly
8Project Event: Promoter will come out with RFQs for hiring the LSTK contractor for the ETP by January end 2018 instead of December 2017. 
8Expenditure Approval: Feb/2017 
8RFQ Date: Jan/2018
8Release Date: Feb/2018 
8Start Date: Q2/2018 
8Completion Date: Sep/2020 
Click here for more information 
8Project Name: Greenfield 2G Bio-Refinery

8Project Cost: Rs 950 Crore
8Project Description: An existing company along with EPC contractor and licensors is planning to set up a Bioethanol project. RFQ for the equipment is already out. Tendering process for the equipment is going on.
8Project Event: RFQ for civil work is expected by February 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Feb/2018
8Release Date: Mar/2018
8Start Date: Q1:2018
8Completion Date: Q4:2020
Click here for more details.
8Project Name: Refinery BS-VI Upgradation Project
8Project Cost: Rs 497 Crore
8Project Description: An existing company along with EPC contractor and licensors is carrying out engineering activities for a new FCC gasoline desulphurisation unit and expansion of the DHDT at its refinery.
8Project Event: RFQ for procuring listed equipment is expected by January 2018.
8Expenditure Approval: Q4:2016
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q2:2017
8Completion Date: Jun/2019
Click here for more details.

Details
8Project Name: Greenfield LPG Bottling Plant Project
8Project Cost: Rs 120 Crore
8Project Description: An existing company along with EPC contractor is planning to set an LPG Bottling Plant with a capacity of 1500 MTPA by installing 3 X 500 MT mounded storage vessels.
8Project Event: RFQ for equipment is to be expected by February 2018.
8Expenditure Approval: May:2017
8RFQ Date: Feb/2018
8Release Date: Apr/2018
8Start Date: Q1:2018
8Completion Date: Q3:2019
Click here for more details.
8Project Name: Oil Field Development
8Project Cost: Rs 100 crore.
8Project Description: Promoter is planning development of an oil field.The block was awarded to the company under-discovered small fields round (DSF) in 2016. The project involves development drilling of oil wells and laying of an infield pipeline to connect with nearest production facility (GGS). Currently, the project is in pre-clearance phase. The production from the block is expected to start by the end of the year 2019. Further RFQ's are expected shortly.
8Project Event: RFQs for hiring services for Rigs and other oilfield services are expected by Q1 2018.
8Expenditure Approval: Q4/2017.
8RFQ Date: Q1/2018.
8Release Date: Q2/2018.
8Start Date: Q4/2018.
8Completion Date: Q2/2020.
Click here for more details

8Project Name: Offshore Field Development
8Project Cost: Rs 3500 crore
8Project Description: Promoterhas planned development drilling of 4 wells in an offshore field. The project also involves subsea tie-back of wells through a pipeline in a daisy chain structure. An average daily gas rate of 6 MMSCMD has been envisaged from the project.
Further RFQs are expected shortly.
8Project Event: RFP for hiring an LSTK contractor for the deep water chemical management system is expected by January 2018.
8Expenditure Approval: Q2/2013
8RFQ Date: Jan/2018
8Release Date: Feb/2018
8Start Date: Q2/2018
8Completion Date: 2018
Click here for more information
Details
8Project Name: Hydro Power Station Maintenance Project
8Project Cost: 25 crores
8Project Description: The owner has planned a 28-day scheduled maintenance of Unit-1 (77 MW) in the 231 MW (3*77 MW) Hydro Power Station covering a capital overhaul of equipment which includes overhauling of auxiliary parts of the bearing sets, seals, and turbine auxiliaries. 
8Equipment required will be turbine guide bearings, gland seals, inspection of runner blades, throttle part of governor, cleaning and painting of spiral casing and draft tube liner, among others.
8Project Event: RFQs for short lead equipment required are expected by first week of January 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 3/Jan/2018
8Release Date: 20/Jan/2018
8Start Date: 1/Feb/2018
8Completion Date: 28/Feb/2018
Click here for more information
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 1000 crores
8Project Description: The promoter is planning to construct a 150 MW (3*50 MW) greenfield hydroelectric power plant. TOR was accorded on 15 December 2015. Currently, survey and investigation works for various hydro-logical, geological, meteorological, power potential studies, etc are underway at the project site. Bids for exploratory core drilling works were out in March 2017. The owner will come out with a bid for a consultant for preparation of DPR.. After preparation of DPR, the owner will decide whether to come out with an EPC contractor or package wise bids.
8Project Event: RFQ for a DPR consultant is expected by Q2 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q2:2018
8Release Date: Q4:2018
8Start Date: Q1:2020
8Completion Date: Q2:2025
Click here for more information Details
The world needs to continue working to protect the climate—this is generally undisputed. However, there is no agreement on which technologies should be used to decarbonize the energy sector.
8Many international scenarios still assume a relevant role for nuclear power in the future.
8However, a study shows that the Paris climate protection target -- limiting global warming to below two degrees -- can be achieved inexpensively without nuclear power.
8The results of a global energy system model indicate that no new nuclear power plants have to be built in order to meet the global climate target.
8It would be cheaper to use a combination of renewable energy and energy storage systems isntead.
Click on Reports for more Details
8The crude carriers market has witnessed an admittedly steadier environment during the course of last week, with only a few negative exceptions across the board and hopes that this could finally be the turning point for a
 stronger winter season building up quickly. Click on Report for more.
8The cost of India's LNG imports have gone up sharply in recent months in comparison to the previous year and this is not entirely due to rising volumes but on account of higher cost of LNG. Find out more. Click on Report.
8India's import dependency for crude oil has gone up by a full percentage point over the last one year. India's import dependency on gas has gone up faster than crude. Click on Report for more.
8Find out more on how disruptive cloud based technology is overhauling project implementation in the oil & gas sector.
Click on Reports for more Details
 1 2 3 >  Last ›

Showing 1–50 of 213 items