For reference purposes the website carries here the following tenders: 8Re-tubing and Retrofitting of Tube Bundles of LPG condenser and Pilot GIU inter cooler heat exchangers and fabrication of heat exchanger of Naphtha cooler at Ankleshwar Asset Details 8Three years Rate contract for construction of drill site including approach roads at Mehsana Asset Details 8Carrying out Pipeline and associated civil works Details 8Procurement of Rotary Evaporator and accessories Details 8Procurement of Pipeline Locator and Holiday Detector for GAIL Details 8Supply of Domestic and Commercial Gas Meters Details 8Provision of Diving Services at Ravva on Coast of Andhra Pradesh and CB/OS-2 in Cambay BasinDetails 8Procurement of Ball Valves for City Gas Distribution ProjectDetails 8Hiring of Consultant for finalization of Financing Arrangement in addition to Financial Appraisal for setting up Butene-1 and HPG Hydrogenation UnitsDetails 8Carrying out Civil works for RLNG Project in refineryDetails 8Supply of Gate Valves for Rajasthan ProjectDetails 8Annual Maintenance Contract for restoration and repair of Cathodic Protection System of Pipeline DepartmentDetails 8Carrying out Foundation Settlement Test of Horton Sphere in LPG/ Propylene area at refineryDetails 8EIA and RA Study for Haldia Barauni Product Pipeline of PHBPL and conversion of existing HBPL Crude Mainline and Loop Line to Product and Gas ServicesDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Indian Oil planning to enhance fuel trade with Bangladesh, Myanmar Details 8German court to rule in March on power, gas network returns Details 8BSVI norms: India revises standards specifications for petrol and diesel Details 8India Ratings projects economic growth at 7.1 per cent next fiscal Details 8Exxon Mobil signs deal for deepwater oil exploration off Ghana Details 8Allow honest promoters to bid for assets: Anil Agarwal, Vedanta Group Chairman Details 8India launches first auction of exploration blocks under new licensing policy Details 8OPEC sees more oil supply from rivals, countering its cuts and Venezuelan woes Details 8Crisis-stricken Venezuela's oil output plummeted to decades low in 2017 Details 8Government recovering tax from Cairn UK, why come after us: Cairn India to HC Details 8Petrol prices breach Rs 71-mark in Delhi, highest in 3 years Details 8Keeping close watch on petrol, diesel rates, says Dharmendra Pradhan Details 8Indonesia to offer 43 oil, gas blocks in 2018 tender Details 8Oil prices drop on uptick in U.S. production Details 8GST Council: Tax rate on 49 items reduced, 29 handicraft products put under 0% Details 8India mulls incentives policy for adoption of enhanced recovery methods at oil-, gasfields Details 8City to get 14 more CNG stations Details 8Earnings recovery seen starting in FY18, but rising oil prices may affect margins Details You can also click on Newsclips for moreDetails
8Project Name: Thermal Power Station Maintenance Project (Unit - 6) 8Project Cost: 18 crores 8Project Description: The owner has planned a 45-day scheduled overhaul of the Unit-6 (250 MW) in the 1140 MW Thermal Power Plant covering overhaul of the complete complex in which equipment includes turbine bearings, refilling of gas for HP, IP, LP turbine cylinders, boiler linings, safety valves, inspection of rotor blades, replacing of conveyor belts, among others. 8Project Event: RFQ for equipment is expected by fourth week of January 2018. 8Expenditure Approval: Q2:2017 8RFQ Date: 24/Jan/2018 8Release Date: 5/Feb/2018 8Start Date: 20/Feb/2018 8Completion Date: 5/Apr/2018 Click here for more information 8Project Name: Thermal Power Greenfield Project : Land acquisition delays RFQ 8Project Cost: 12000 crores 8Project Description: RFQ for a BoP package for a greenfield 1600 MW (2*800 MW) super-critical thermal power plant has been delayed on account of a delay in the land acquisition. BTG and allied civil works has been given to BHEL. Civil works comprising piling, bolt fixing has already been floated by BHEL. 8Project Event: RFQs for a BoP package are expected in Q2 instead of Q1 2018 8Expenditure Approval: Mar/2017 8RFQ Date: Apr/2018 8Release Date: Q3:2018 8Start Date: Q4:2018 8Completion Date: Q1:2023 Click here for more informationDetails
Our forward looking oil & gas project monitoring software provides a dynamic feedback matrix on the situation on the ground. Our team of mechanical engineers updates RFQ dates for projects all the time. In a large project, there are can be dozens of updates up until commissioning happens. Two weeks before an RFQ date is projected, our backend software sends out an alert to the concerned analyst to follow up on what happens next. And this leads to a continuous cycle of follow ups. In today's update, we have one new project prospect and two updates. Two RFQs have been held up and new dates have been projected and the reasons for the delays have been unambiguously documented. The information comes straight from the project promoters so they are never off the mark. Dozens of project-related parameters are highlighted in our software updates along with key contact data. And to top it all, we provide a dedicated engineer who will offer live support. 8Project Name: Oilfield Development. 8Project Cost: Rs 50 crore. 8Project Description: Promoter is planning the development of an oil field. The block was awarded to the company under NELP IX round in 2015. The project involves development drilling of oil wells, development of existing wells and laying of an infield pipeline to connect with the nearest existing production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2019. A requirement for PMC and an EIA consultant is expected from promoter's end. Further RFQs are expected shortly. 8Project Event: RFQ for hiring PMC consultant is expected by March 2018. RFQ for hiring EIA consultant is expected by March 2018. 8Expenditure Approval: Q4/2017 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q4/2018 8Completion Date: Q4/2019 Click here for more details 8Project Name: Desalination Plant. 8Project Cost: Rs 350 crore 8Project Description: Promoter's RFQ for the construction of a Sea Water Reverse Osmosis Desalination Project at the facility has been delayed. Currently, the project is undergoing environment clearance. CRZ clearance for the project has already been awarded. RFQs for the project are expected shortly. In this project, 18 MLD of the capacity of the desalination project will cater to the process water requirement and 2 MLD shall cater to the boiler feed water requirement 8Project Event: RFQ's for hiring an LSTK contractor is expected by March 2018 instead of January 2018. 8Expenditure Approval: Q1/2016 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: June/2018 8Completion Date: Sep/2019 Click here for more information 8Project Name: Pipeline Greenfield Project 8Project Cost: Rs 1542 Crore 8Project Description: An existing company is planning select a contractor for the construction of a multi-product pipeline with a capacity of 2.78 MMTPA has been delayed on account of forest clearance issues. A revised application for forest clearance is yet to be submitted. An EPCM contractor is to be selected and the RFQ for the equipment will be out subsequently. Further RFQs are awaited. 8Project Event: RFQ for the equipment is expected by May 2018 instead of March earlier. 8Expenditure Approval: Q3:2017 8RFQ Date: May/2018 8Release Date: Jun/2018 8Start Date: Q3:2018 8Completion Date: Q4:2021 Click here for more details. 8Project Name: Refinery BS VI Greenfield Project 8Project Cost: Rs 2771 Crore 8Project Description: An existing company along with EPC contractor and licensors is carrying out engineering activities to construct a new DHDT unit with a capacity of 2 MMTPA in its Refinery. RFQ for the equipment is already out and other RFQs are expected shortly. 8Project Event: RFQ for composite work of DHDT and SRU is expected by March 2018. 8Expenditure Approval: Q1:2016 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q3:2016 8Completion Date: Q2:2019 Click here for more details.Details
Coal Gasification & Ammonia Greenfield Project 8Cost - Rs 5000 Crore 8Project Description: A Fertilizer Company is awaiting environmental clearance for its greenfield ammonia and coal-gasification units 8Project Event: RFQ for an LSTK contractor is likely to be released soon Click here for more information SSP Fertilizer Greenfield Project: Tender Out 8Cost - Rs 90 Crore 8Project Description: A Fertilizer Company has re-released the tender for an EPC contractor for a greenfield Single Super Phosphate Fertilizer project with a capacity 800 MTPD at Pandoli in Rajasthan. The tender was floated earlier but at that time bidders did not fulfil the BEC requirements. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers, Screens, Elevators, Furnaces, Cyclones, Blowers, Belts, Weighing machines and more. Tender out for LSTK contractor. 8Project Event: RFQ for an LSTK contractor has been released. Click here for more informationDetails
For reference purposes the website carries here the following tenders: 8Procurement of Corrosion Inhibitors Details 8Wear particle analysis of Lube oil of rotary equipments at refinery on ARC basis Details 8Full catalyst replacement in Tubular Reformer of HGU-2 by Unidense Loading Technology at refinery Details 8In situ cleaning of Vapour and transfer line using high pressure hydro-jetting along with specialized coke cutting nozzle/ devices in DCU unit of refinery Details 8Repair of Hydraulic/ Pneumatic/ MEC Tools at refinery Details 8Laying of twin pipelines in same trench for onshore portion of Salaya-Mathura PipelineDetails 8Supply, Installation and Commissioning of Carbon Monoxide Analyzer for HGU at refineryDetails 8Procurement of different Valves for Aishwarya Project of refineryDetails 8Supply of Spares of CCRU Reactor internal installed at refineryDetails 8Hiring of Consultancy Services for Behaviour Base StudyDetails 8Procurement of Non-sparking Tools for Mechanical Maintenance Jobs in GPU, GREP and HRSG VaghodiaDetails 8Procurement of Hydraulic Torque Wrench at GAIL VaghodiaDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Chinese solar boom sparks global renewables boon: study Details 8South32 Q2 coking coal output falls 43 pct as mine outage weighs Details 8China will curb 'excessive' coal-to-gas switch for heating - CNPC Details 8Huge opportunity for US to export LNG to India, China: IEA chief Details 8Oil prices give up early gains, but market still well supported Details 8Ukraine will buy gas from Russia this year - Naftogaz chief Details 8India to become $5 trillion economy in 8-9 years: Suresh Prabhu Details 8How a Bengaluru-based company is working to transform sewage into biodiesel Details 8India to auction 55 blocks for oil, gas exploration tomorrow Details 8Shell to focus on doubling returns, safety performance of facilities in 2018: CEO Details 8Reliance Industries declares 30% higher refinery capacity at Jamnagar plant Details 8CII calls for inclusion of petroleum and natural gas under GST Details 8Budget 2018: Divestment target may jump in next financial year Details 8GST Council meeting today: Here's what to expect Details 8OPINION: Open up fuel retail, hold firm on prices Details 8Shell agrees on five-year solar energy deal in Britain Details 8Kuwait oil minister says so far no plan to exit oil production cuts Details 8Nigerian militants threaten oil rig facilities attacks within days Details 8Oil edges up on falling US crude inventories, but supply remains ample Details 8Petroleum sector regulator changes bid norms for CNG, PNG retail licence Details You can also click on Newsclips for moreDetails
8Project Name: Thermal Power Station - FGD Addition 8Project Cost: 500 crores 8Project Description: The owner is planning the installation of a Flue Gas Desulphurization (FGD) unit at it's 1000 MW (2*500 MW) unit in its 2340 MW (4*210 MW + 2*500 + 2*250 MW) thermal power complex. The company is expected to float tenders for the same. Currently, site survey activities are ongoing for a feasibility report which is under preparation. Work on the project is mean to start in early 2019. RFQ for supply of an FGD is expected to be out soon. 8Project Event: RFQ for supply of an FGD is expected to be out by Q2 2018. 8Expenditure Approval: Q4:2017 8RFQ Date: Q2:2018 8Release Date: Q3:2018 8Start Date: Q2:2019 8Completion Date: Q1:2021 Click here for more informationDetails
8Big financial investors are withdrawing from investing in the fossil fuel industry. The world bank too will follow suit. So where will $640 billion needed for upstream investment between 2017 and 2040 going to come from? Click on Report for more. 8Why is the oil market ignoring the possibility of an increase in shale oil output from the US while rooting for higher prices? Find out more. Click on Report. 8Marine Gensets Market Share, Growth Analysis and Forecast Report 2012-2022. Click on Report for more. 8Coal prices are so high that demand is slacking as a result. Click on Report for more. 8Gas prices are rising as demand catches fire everywhere. Click on Report for more. 8Transnational power grids are now possible. Find out which routes are the most viable. Click on Report for more. 8Dimethyl Ether (DME) Market Research Report- Forecast to 2023. Click on Report for more.
Details
The advent of Trump and a resilient demand seems to have pushed the fear of peak demand for oil into the background for now. 8The advent of electric vehicles was meant to the hit the conventional car industry badly 8The latest data seems to show that while electrification will make its impact, the growth rate of conventional two and four wheelers will continue unabated at least until 2030 8Find out more on why therefore the demand for petrol and perhaps diesel will continue to go up for some time to come Click on Reports for more
Details
SSP-Sulphuric Acid & NPK Fertilizer Expansion Project 8Cost - Rs 75 Crore 8Project Description:A Fertilizer Company is awaiting environmental clearance for the expansion of its Single Super Phosphate capacity from 140000 TPA to 580000 TPA, Granulated NPK Fertilizer from 45000 TPA to 440,000 TPA and Sulphuric acid from 40000 TPA to 140000 TPA. The equipment requirements are Crane, Hopper, Feeder, Conveyor, Valve, Grinding Mill, Tank, Separator, Pump, ID Fan, Collector, Generator Mixer, Den, Scrubber, Screen, Mill, Elevator, Drum, Furnace, Cyclone, Blower, Fan, Belt, Weighing machine, Steam Turbine Generators, Economizers, Reheaters, Boilers, Sulphur Combustor, Drying Towers, Absorbers, Absorber Exchangers, Sulphur filters, Sulphuric Melting Tank, motor, Pumps and more 8Project Event: RFQ for a contractor is likely to be released in April 2018. Click here for more information Annual Maintenance Project 8Cost - Rs 30 Crore 8Project Description: A Fertilizer Company is planning an annual shutdown maintenance in May or June 2018 for its fertilizer complex. The existing capacity 720000 MTPA of DAP, 225000 MTPA of Phosphoric acid, 660000 MTPA of Sulphuric acid and 32 MW of Captive Power Unit. They will release the tender for registered user only. 8Project Event: Tender for Annual Maintenance Contract is likely to be released in March 2018. Click here for more information NPK-SSP & Sulphuric Acid Expansion Project 8Cost - Rs 15 Crore 8Project Description: A Fertilizer company is awaiting environmental clearance for its expansion of Single Super Phosphate Unit from 66000 TPA to 200000 TPA, Granulated NPK Fertilizer from 60000 TPA to 200000 TPA, Sulphuric acid from 33000 TPA to 50000 TPA. The equipment requirements are Crane, Hopper, Feeder, Conveyor, Valve, Grinding Mill, Tank, Separator, Pump, ID Fan, Collector, Generator Mixer, Den, Scrubber, Screen, Mill, Elevator, Drum, Furnace, Cyclone, Blower, Fan, Belt, Weighing machine, Steam Turbine Generators, Economizers, Reheaters, Boilers, Sulphur Combustor, Drying Towers, Absorbers, Absorber Exchangers, Sulphur filters, Sulphuric Melting Tank, motor, Pumps and more. They will plan to release the tender in next financial year. 8Project Event: RFQ for a contractor is likely to be released in April 2018. Click here for more informationDetails
8 Project Name: Drilling Site Development 8Project Cost: Rs 260 Crore. 8Project Description: Promoter is planning the development of an oil field. The block was awarded to the company under the Discovered Small Fields (DSF) round in 2016. The project involves development drilling of oil wells and laying of an infield pipeline to connect with the nearest production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2020. Promoter does not have any prior experience in oil field development. Further RFQs are expected shortly. 8Project Event: RFQs for hiring a consultant for EIA services is expected by March 2018. RFQs for hiring workover rigs and drilling rigs is expected by March 2018. RFQs for hiring other oilfield services is expected by April 2018. 8Expenditure Approval: Q2/2018 8RFQ Date: Apr/2018 8Release Date: Jun/2018 8Start Date: Apr/2019 8Completion Date: Dec/2021 Click here for more details 8 Project Name: CBM Block Development 8Project Description: Promoter along with its partner is planning the development of a CBM Block by drilling a total of CBM wells. Promoter has already selected a strategic partner to undertake the development of the block. An overall quantity of 0.4 MMSCMD of gas has been envisaged to be produced from the project. Stragetic Partner company, in turn, had selected a US firm to carry out the feasibility study for the project. The consultant for EIA services is about to be finalized from the company's end. The drilling rig tender is also in finalization stage. Further RFQ's for the project are expected shortly. 8Project Event: RFQs for manpower requirement are expected by February end 2018. RFQs from promoter's end for various mechanical and electrical equipment are expected by March 2018. 8Expenditure Approval: Q1/2016 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: Q3/2018 8Completion Date: Q3/2021 Click here for more details 8Project Name: Refinery BS-VI Up-gradation Project 8Project Cost: Rs 1713 Crore 8Project Description: An existing company along with EPCM contractor and licensor is planning to construct the following new units: CCR of 400 TMTPA, Isomerisation unit of 200 TMTPA and revamping of HGU-I from 34 TMTPA to 53 TMTPA, Prime-G of 525 TMTPA, DHDS of 1100 TMTPA without any reduction its capacity to meet BS-VI Fuel Quality Up-gradation within the existing refinery. RFQ for the equipment is already out. 8Project Event: RFQ for civil work is expected by March 2018. 8Expenditure Approval: Q2:2016 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q2:2018 8Completion Date: Q2:2020 Click here for more details. 8Project Name: Greenfield LPG Bottling Plant Project 8Project Cost: Rs 137 Crore 8Project Description: An existing company is planning to install an LPG Bottling Plant with a capacity of 120000 MTPA by installing 3 X 350 MT mounded storage vessels. A slight delay in hiring the PMC contractor due to the land accusation process. 8Project Event: RFQ for Project Management Consultant is expected by May 2018. 8Expenditure Approval: Feb/2017 8RFQ Date: May/2018 8Release Date: Jun/2018 8Start Date: Q3:2018 8Completion Date: Q3:2020 Click here for more details.Details
Indian Oil Corporation's tie-ups with two new technology Israeli companies, one that is looking at a dramatically new energy storage technology and another conducting cutting edge new-tech research not just on new energy but bio and nano technology have raised some quizzical eyebrows among industry watchers. 8Is the refining giant taking the first steps towards looking at an alternate non-fossil based future? 8Clearly, the scale of such diversions may look limited as of now but the future is uncertain and it is quite possible that some of these new-edge technology can march rapidly forward. 8Is it possible that IOC combine its financial heft and its all-India network with Israeli knowhow to push new technology into the Indian firmament? 8The question then is whether IOC is capable of thinking small and then scaling big given its rigid institutional structure? Some big companies are capable of doing it but most are unsuccessful. 8This is where the policy planner and the IOC brass can step in by creating flexible internal structures that can push such innovation fearless forward Click on Details for more
Details
We have built a unique first-of-its-kind database of oil gas contacts in the country. 8Unlike a regular directory, every contact in our project monitoring software comes with a rich tapestry of information on the industrial facility and the unit in which the contact is present, along with attendant business development prospect, if any, around the contact. Every contact information is validated by our team of in-house analysts -- who are all mechanical engineers rigorously trained to look for little details -- on a regular three-monthly basis. Around a contact within an industrial facility we give you a whole lot of additional information including: -- Technology parameters -- Design and actual Input-Output data for every raw material and product -- Multi-parameter utility matrix -- Long term maintenance contracts -- Feedstock data -- NIC codes 8A facility is further split up into its individual units and for each unit we have a similar set of parameters as in the facility 8And for each unit or facility, we have a resultant business development prospect, either in terms of maintenance prospect or a capital project, be an additional expansion or debottlenecking or a revamp or a new capital project 8The point to note is that we are always looking ahead and never behind, giving you exclusive information not on a tender that is already out but on a genuine future prospect, which may be a month, six months, a year or two years away from being tendered out. 8Having worked in the business for more than two decades, we know what you are looking for. 8India has so far had a poor business prospect database because the existing databases do not fulfill the requirements of a business development manager. What we have done is just plugged that gap 8For you, a deal can just be a phone call away Contact us or fill up the registration form for a demo of what we have to offerDetails
For reference purposes the website carries here the following tenders: 8Procurement of Drill Pipes Details 8Supply of Thermal and Pressure Safety valve at refinery Details 8Dismantling of existing Tanks, Mechanical Equipments with associated piping and other works Details 8Procurement of Diethyl Aluminium Ethoxide Details 8Pipeline Lowering at MPPL Chainage in Radhanpur Jurisdiction Details 8Expert Service support of Compressor Controls Corporation Engineer for Antisurge controller of RGC of DHDT unit in refinery Details 8Rate Contract for supply of CS Seamless PipesDetails 8Supply of Mechanical Seal Spares in refineryDetails 8Expression Of Interest for Engineering, Supply, Erection, Testing, Commissioning and Synchronizing of Photo Voltaic Module based Solar Power PlantDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Shell announces redevelopment of Penguins field in UK North Sea Details 8India's trade deficit widens to over three-year high in December Details 8Government pipelines big business into western Rajasthan Details 8High crude price: India’s oil import bill balloons 35% to $10.34 billion in Dec, fuel prices at an all-time high Details 8ANALYSIS: U.S. oil industry set to break record, upend global trade Details 8Indonesia issues new rules on natural gas pricing, transmission Details 8China's natural gas consumption to rise 10 pct on yr in 2018 - CNPC research Details 8GNFC shuts down Dahej plant indefinitely post gas leak Details 8India's imports of Iran oil in December scheduled to rise to most since March: Source Details 8PM Modi says Barmer Refinery will change the fate and face of Rajasthan Details 8India to launch first auction of oil and gas exploration blocks on Thursday Details 8Indian Oil Corp enters into technology tie-ups with Israeli companies Details 8Natural gas utility GAIL renegotiates LNG deal with Russia's Gazprom Details 8Brent oil falls but demand underpins near $70 per barrel Details 8In Madhya Pradesh, 1 per cent cess set to push up fuel prices this week Details 8CII urges government to bring oil, natural gas under GST Details 8Statoil may build onshore terminal for Castberg oil -minister Details 8India's oil imports in 2017 surged to a record 4.4 million barrel per day Details 8Indian Oil & Gas firms likely to report strong third quarter; Petronet LNG may see decline in net income Details You can also click on Newsclips for moreDetails
8Project Name: Thermal Power Station Maintenance Project (Unit-5) 8Project Cost: 15 crores 8Project Description: The owner has planned am 18-day scheduled mini overhaul of the Unit-5 (500 MW) in the 2630 MW Thermal Power Plant covering a mini overhaul of the complete complex in which equipment includes turbine bearings, refilling of gas for HP, IP, LP turbine cylinders, boiler linings, inspection of rotor blades, among others. 8Project Event: RFQ for short lead equipment is expected by February 2018. 8Expenditure Approval: Q2:2017 8RFQ Date: Feb/2018 8Release Date: Feb/2018 8Start Date: 14/Mar/2018 8Completion Date: 31/Mar/2018 Click here for more information 8Project Name: Gas Turbine Power Station - O&M Supply Project 8Project Cost: 7 crores 8Project Description: The owner is planning to replace an existing inlet air filter house in the 107.88 MW Gas Turbine Power Station. The existing inlet air filter house is in corroded condition and many holes have developed due to corrosion. At present these holes are covered by providing metal patches. Administrative approval is awaited, after which the procurement team of the owner will come out with a bid for the new inlet air filter house. The main equipment required will be Inlet air filtration system, evaporative cooler, transition piece. 8Project Event: RFQ for purchase of a new inlet air filter house is expected by March 2018. 8Expenditure Approval: Q4:2017 8RFQ Date: Mar/2018 8Release Date: May/2018 8Start Date: Sep/2018 8Completion Date: Oct/2018 Click here for more informationDetails
ONGC's officers and workmen had repeatedly pointed out the need to abandon the helicopter service operated by Pawan Hans in the past but such pleas had fallen on deaf ears. The following written warnings were sent to the company brass from those officers and men who fly in the helicopters 8"The service has deeply deteriorated to the extent that it has become most uncertain, and unsafe for flying" 8"The horrifying fact is, maintenance of Helicopter is done in front of the crew, where they witness even total engine getting replaced, creating an immense feeling of personal insecurity when taking off from a platform in such helicopters." 8"We are given to understand that Pawan Hans is facing an acute shortage of skilled manpower as well as spares. Base spares and even entire engines from other helicopters are used to keep some crafts flying." 8"The immediate need of the hour is to investigate reasons for poor performance of PH" 8ONGC employees had even threatened to boycott flying by Pawan Hans, claiming that private operators provide far better service than its own carrier Click on Reports for more
Details
Get more details on who has won the bid and what price 8The work scope involves five new wellhead platforms, with nine slots each, named R-7A, R-9A, R-10A, E-12B, R-13A. In addition, it includes more than 140 kilometres of subsea pipelines, to be installed in nine segments. Modifications at the R-12A platform and more than 60 kilometres of composite cables are also said to be part of the workscope. 8Also know more on which companies were in the race and what price they quoted Click on Report for more
Details
We get you actionable information before it become public knowledge. In project intelligence, we beat everyone else to it, including business development managers in the oil & gas industry. The reason is simple, we have unfettered relationships in the oil & gas industry, developed laboriously over the years. We have a competent team of mechanical engineers whose job is to keep their ears to the ground and look for forward looking information that you can use. For you, a deal can just be a phone call away. 8Project Name: Drilling Site Development: RFQs in March, 2018 8Project Cost: Rs 250 crore. 8Project Description: Promoter is planning the development of an oil field. The block was awarded to the company under-Discovered Small Fields (DSF) round in 2016. The project involves development drilling of oil wells and laying of an infield pipeline to connect with the nearest production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2020. Moreover, the promoter does not have any prior experience in oil field development. Further RFQs are expected shortly. 8Project Event: RFQ'S for hiring consultant for EIA services is expected by March 2018. RFQ'S for hiring workover rigs and drilling rigs is expected by March 2018. RFQ'S for hiring other oilfield services is expected by April 2018. 8Expenditure Approval: Q2/2018 8RFQ Date: Mar/2018 8Release Date: May/2018 8Start Date: Mar/2019 8Completion Date: Dec/2021 Click here for more details 8Project Name: Refinery Greenfield Project: Licensor selection coming 8Project Cost: Rs 43129 Crore 8Project Description: An existing company is planning to install a 9 MMTPA grass-root Refinery cum petrochemical complex. Engineers India Limited was appointed as consultant for preparing DFR. Licensor selection will be done unit wise. 8Project Event: RFQ for Licensor selection is expected by February 2018. 8Expenditure Approval: Q4:2016 8RFQ Date: Feb/2018 8Release Date: Apr/2018 8Start Date: Q3:2018 8Completion Date: Q4:2022 Click here for more details. 8Project Name: Refinery Greenfield Project: RFQ for PMC in March, 2018; get key contacts here 8Project Cost: Rs 200000 Crore 8Project Description: A Joint Venture is planning to construct a refinery with a capacity of 60 MMTPA. A consultant has already been hired for preparing all documentation works. There is a slight delay in the land accusation process for the refinery as of now. Unit wise licensor RFQs are expected. 8Project Event: RFQ for Project Management Consultant is expected by March 2018. 8Expenditure Approval: Q1:2017 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q2:2018 8Completion Date: Jul/2023 Click here for more detailsDetails
8Qatar has the most favorable entrepreneurial ecosystem among 14 Arab countries and ranks in 22nd place among 137 countries around the world. Time for Indian companies to step in? Click on Report for more. 8In the face of rising demand, the world is looking at a deficit of 430,000 b/d in 2018 compared to 100,000 b/d earlier, and thus the projection is that Brent crude oil prices averaging $64/b in 2018 compared to $56 earlier. Click on Report for more. 8Find out why an exhaustive quantitative analysis has found both Cummins India and Reliance Industries to be over priced at this juncture. Click on Report for more. 8charging is not going to be all that simple. The high charging loads of the fast charging stations results in increased peak load demand, reduced reserve margins, voltage instability, and reliability problems. The Indian system is just not geared up as of now. Click on Report for more. 8Theme: The U.S.-India relationship has tremendous potential. Working together, the world’s two largest democracies can advance prosperity, security, and sustainable development for themselves and others around the world. Read a series of recent papers on this theme. Click on Report for more. 8Industrial Coatings Market Research Report- Forecast to 2022. Know more Click on Report 8The Bangladesh economy is growing rapidly and it has been able to dramatically reduce its poverty levels. And yet there are challenges. Click on Report for more. 8If you are keen on electric cars, here is a comparison of the best models to chose from. Click on Report for more. 8GAIL has appointed a new CVO. Click on Report for more. 8Blockchain and the oil sector: Is there something coming up? Click on Report for more. 8Get the latest update on the crude shipping market. Click on Report for more. 8Oil majors are raking in much higher gas prices now. Find how much more it is. Click on Report.
Details
Hot money is always chasing good stocks which are perpetually in short supply. 8In this context, Aegis Logistics seem like a good pick, with its LPG storage and distribution network. Demand is soaring and everyone loves a company where its market is on fire 8But a quantitative analysis shows that enthusiasm for the scrip has pushed its price way ahead of its fundamentals. Click on Reports to find out more
Details
Quite clearly, the world has abundant supply of oil. And if electric vehicles and global warming push the world to consume less oil, the obvious consequence is that the price of oil should be only marginally more than the last barrel scooped out of the earth by the least cost producer. 8But that is not going to be the case unless the fiscal break-even levels of the biggest oil producers in the world are scaled back to the margin cost of producing oil. 8Until other more viable options to sustain their economies are built, oil producers will continue to look at ways to keep production down and prices up even if they are eventually left with unburnable reserves when demand for fossil fuels run out completely. 8The social cost of producing oil, which is roughly equivalent to the fiscal breakeven level, must be compensated by the price of oil 8Juxtaposed against this is the concept of peak oil. Even though peak oil may come sooner than later, the world will continue to need a large volume of oil and gas to keep powering its economy for a long time to come. 8A combination therefore means that prices can in fact be 'higher for longer" than "lower for longer". Click on Reports for more
Details
Anticipating the problem on banking on oil too much, countries in the Gulf are trying to diversify out of this dependence 8These countries are now offering opportunities to attract global investors. 8Yet, the strong tension between the existing government structures and the democratic elements that are needed for investments to flourish creates a complicated economic environment. 8But the Gulf states are trying to get around the problem 8In this context, three markets, the Kuwaiti labor market which is a good representative of other Gulf States’ labor markets, renewable energy markets and biotechnology markets which have increasing roles in new industrial policies, are studied here to examine the challenges and the opportunities created by these government policies. 8The study reveals numerous opportunities offered to entrepreneurs and investors 8Can Indian entrepreneurs step in? Click on Reports for more
Details
The water treatment industry is in for a major expansion. 8It is predicted that global water demand would grow by 55% during 2011-2050 - largely fueled by population growth - which would make the world face a 40% water deficit. By some study, global fresh water availability would decline by nearly 7% for every degree increase in climatic temperature. 8More alarming is the water mismanagement problem in Indian than in most other developing economies because, by some estimates, nearly 70% of the sewage generated in India remains untreated and just 10% of the wastewater is treated - dismally less compared to Indonesia (14%) and Philippines (10%). 8No less gruesome, however, is India's deplorable water treatment capacity in Class I and Class II cities - 18% and 8% respectively; metro's still venerable at 51%. 8A big opportunity awaits here for willing entrepreneurs. 8The website also carries here a case study of a company which has made it big in this business. And it can serve as a template Click on Reports for more
Details
For reference purposes the website carries here the following tenders: 8Carrying out MDPE Laying and GI/CU Installations in Kanpur and Bareilly Details 8Hiring of Direct Marketing Agency for PNG Domestic Registration in Kanpur and Bareilly Details 8Supply of Methyl Di-Ethanol Amine for Hazira Plant Details 8Rate Contract for Pipe Type Earthing for Drilling Rigs at Ahmedabad Asset Details 8Hiring of Services for Integrity Assessment of Sub-sea Oil and Gas Pipelines in Western Offshore using Nonintrusive Technology Details 8Collection of Chemical Oil Drums from Refinery-3 and Cogen/ CPP areas, Cleaning and Handing over to Materials Department Details 8EOI for engagement of Insurance Broker for 2018-19Details 8Supply of Trichloroethylene at refineryDetails 8Supply of Multi Reactor Catalyst Evaluation Pilot PlantDetails 8Supply of CBD Pump Spares at refineryDetails 8Corrigendum: Procurement of IR Gas Detector for Khera JurisdictionDetails 8Procurement of Nickel Plated Pressure Seal Gate Valves for Adsorber System of LLDPE PlantDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Iranian oil tanker sinks, 32 crew members presumed dead Details 8Oil slick burning in East China Sea from sunken oil tanker: Chinese media Details 8IT, infra, auto & oil & gas sectors likely to gain strength in coming weeks Details 8India, Israel sign nine agreements including a MoU in oil and gas sector Details 8Diesel prices at record Rs 61.74 per litre, petrol crosses Rs 71 per litre Details 8‘Once the refinery is set up, many will get indirect employment’ Details 8PM Modi to attend work commencement of Rajasthan oil refinery Details 8Petrobras and Total Complete transfer of rights in Lapa And Iara block for $1.95 billion Details 8Crude oil hovers below $70 highs, clouded by rise in U.S. output Details 8Noble Group nets less than expected from oil unit sale to Vitol Details 8Singapore files more charges against Shell oil theft suspects Details 8Focus on defence, oil as India, Israel chart road map to boost ties Details 8Petroleum Ministry for awarding of discovered small fields by oil, finance ministers Details 8ONGC reviews offshore logistics operations after chopper crash Details 8How India is increasing engagement with Myanmar with petroleum products Details 8PM Modi promises more reforms, invites Israeli business to invest Details 8Shell agrees to sell its stake in Iraq's West Qurna 1 oilfield to Japan's Itochu Details 8Shell ventures back into solar, agrees to acquire stake in US firm Details You can also click on Newsclips for moreDetails
8Project Name: Oilfield Development. 8Project Cost: Rs 200 crore. 8Project Description: Promoter is planning the development of an onshore block. The project involves development drilling of development wells, installation of 19 EPS and laying of a 4 or 6-inch pipeline from oilfield to the nearest Early Production System (EPS). Currently, the product is in the engineering phase. The environment clearance for the project has already been granted in December 2017. As many as 19 Early Production Systems are expected to be completed on EPC basis. Further RFQs are expected shortly. 8Project Event:A prequalification criterion meeting for project requirements is expected by mid-February 2018. 8Expenditure Approval: Q4/2017 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: Oct/2018 8Completion Date: Oct/2020 Click here for more details 8Project Name: Mining Lease Block Development: RFQs changed to February. 8Project Cost: Rs 60 crore 8Project Description: RFQs for promoter's proposed developmental drilling of oil wells for incremental production of Heavy Oil from Mining Lease Area have been delayed. The project has been listed out as an expansion project in the already existing well development drilling programme going on at the existing facility. Meanwhile, the rig for the project has also been finalized. RFQs for the following equipment -- Coupling, Xmas Tree, Tanking Facilities, Safety Valves etc -- are expected shortly. 8Project Event: RFQ for equipment is expected by February end 2018 instead of December 2017. RFQ for hiring a Civil Contractor is expected by end-March 2018 instead of January 2018. 8Expenditure Approval: Q1/2017 8RFQ Date: Feb/2018 8Release Date: Apr/2018 8Start Date: June/2018 8Completion Date: Mar/2019 Click here for more information 8Project Name: Refinery Brownfield Expansion 8Project Cost: Rs 22000 Crore 8Project Description: An existing company is currently going through an approval process involving sanction from the public investment Board for expansion of its capacity from 3 MMTPA to 9 MMTPA at its refinery along with a cross country crude oil pipeline either from Haldia to Paradip. At present, the detail feasibility report has been prepared by Engineers India limited. There seems to be a delay in the governmental approval process of now, Clarifications are also sought on the hiring of LSTK and EPC contractors for the project. 8Project Event: RFQ for hiring a contractor to be expected by March 2018 instead of January 2018. 8Expenditure Approval: Q1:2017 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q4:2018 8Completion Date: Q4:2022 Click here for more details. 8Project Name: Greenfield LPG Bottling Plant 8Project Cost: Rs 161 Crore 8Project Description: An existing company is planning to set up an LPG Bottling Plant with a capacity of 120000 MTPA by installing 3 X 600 MT mounded storage vessels 8Project Event: RFQ for Project Management Consultant is expected by March 2018. 8Expenditure Approval: Q3:2017 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q2:2018 8Completion Date: Q2:2020 Click here for more details.Details
8Project Name: Thermal Power Station Maintenance Project (Unit-2) 8Project Cost: 18 crores 8Project Description: The owner has planned an 16-day scheduled maintenance of Unit-2 (135 MW) in the 1080 MW covering boiler and its auxiliaries that will include maintenance and inspection of equipment comprising boiler tubes, boiler refractories, filters, inspection of oil in boiler and refilling it, buck-stays, seals, among others. 8Project Event: RFQs for short lead equipment are expected by the fourth week of January 2018. 8Expenditure Approval: Q2:2017 8RFQ Date: 25/Jan/2018 8Release Date: 20/Feb/2018 8Start Date: 15/Mar/2018 8Completion Date: 30/Mar/2018 Click here for more information 8Project Name: Thermal Power Station - FGD Addition 8Project Cost: 200 crores 8Project Description: The promoter is planning the installation of a Flue Gas Desulphurization (FGD) unit at it's 500 MW (1*500 MW) expansion unit in its 1340 MW (4*210 MW + 1*500 MW) thermal power complex. The company is expected to float tenders for the same. Currently, site survey activities are ongoing for a feasibility report which is under preparation. Work on the project is mean to start in early 2019. RFQ for supply of an FGD is expected to be out soon. 8Project Event: RFQ for supply of FGD is expected to be out by June 2018. 8Expenditure Approval: Q4:2017 8RFQ Date: Jun/2018 8Release Date: Q3:2018 8Start Date: Q2:2019 8Completion Date: Q1:2021 Click here for more informationDetails
8Myanmar had recently changed its tax laws and FDI rules. This may be of interest for those with an eye on our neighbour.Click on Report for more. 8A list of tankers sold in the past one week is carried here along with the names of the transaction partners and their prices. A similar list of ships which are headed for demolition is also documented. Click on Report for more. 8If you have piled up many years of experience as a ship broker with a large country, is it time for you to fork out and become an independent consultant? Find out how easy or difficult it be from someone who has taken the plunge. Click on Report for more. 8Compressors are a key requirement in the energy sector. Here are details of a big global compressor company, with a presence in the upstream, refining, industrial gas, gas transportation and storage and petrochemical segments, willing to expand its footprint in India. Click on Report for more. 8How is GAIL's plan to expand the Urja Ganga gas pipeline to the North East of India pan out? Within the North East too, there are plans to build a network of pipelines by a consortium of public sector companies. Click on Report for more. 8Here are details of a high quality ball valves supplier to the oil & gas industry. Know more on what it has to offer. Click on Report for more. 8Find out more on why BP is an over valued stock as of now. Click on Report for more. 8Port inspections show a large number of "high risk" vessels docked at Indian ports. This holds true for both Indian and foreign vessels. Click on Report for more.Details
Standard sized ammonia-urea plants consume around 2.4 mmscmd of gas 8A spate of new fertilizer plants are coming up but they are at various stages of contracting 8So when exactly are these new plants going on stream is a big question in the mind of gas suppliers in India 8The website carries here a clear estimate of when new capacities are coming up between now and 2022 in India. 8Click on Reports for more. Also if you want to know more on each of these new capacities, and what stage of phase they are in, along with key contacts, utility matrices, possible gas connectivity formats, EPC contractor details, wherever they have been awarded, you can get in touch with our marketing team in our Contact Us section.Click on Report for more.Details
Solar tariff rates are falling rapidly as a consequence of technological innovation, economies of scale and extremely competitiveness. 8In this context, the website carries here is a series of documents to show how these enabling conditions will not be available in India subsequent to anti-dumping duties on solar panels. These duties are an attempt to boost domestic industrial output. 8The advances in technology and scale garnered by Chinese companies are unlikely to be replicated by the Indian industry even if it is handed over a captive solar market. 8The cost and benefits of giving a leg-up to the domestic industry has not been balanced with the economy-wide consequences of not allowing solar tariff rates to fall as will be the case elsewhere in the world have not been fully worked out. 8 Find out more about the politics involved, and the accompanying data on imports, cost competitiveness and future projections on how global solar prices going to continue falling with the exception of India Click on Reports for more Details
Find out more on how renewable energy cost reduction are going to continue well beyond 2022. 8Record low auction prices provide valuable insights 8So does rapid technological changes 8Electricity from renewables will soon be consistently cheaper than from fossil fuels. 8Measurable "learning rates" have been very high 8But these are conditional a set of factors 8India had them so far but will it now? 8Will it be able to take advantage of the paradigm changes taking place in the global energy sector? Click on Reports for moreDetails
For reference purposes, the website carries here the entire process map of RIL's refineries in India. 8There is also a mapping of how RIL plans to avoid industrial accidents in its facilities Click on Reports for moreDetails
Get an update on the latest rulings and changes in India's complex taxation regime on the following topics 8Permanent establishment 8R&D – Weighted deduction 8Royalty and fees for technical services 8Depreciation 8POEM 8Deemed dividend 8Indirect transfer 8ICDS 8Foreign tax credit 8Goodwill 8GAAR 8Slump sale 8Transfer pricing 814A disallowance 8Individual taxation 8Capital gains 8Indirect taxes 8Minimum Alternate Tax Click on Reports for moreDetails
The Chinese have been accused of creating upstream barriers on the mighty Brahmaputra. 8China has done exactly the same with the Mekong river which originates in China and flows through major ASEAN countries. There is now a plan to build a 1200 km tunnel to divert the river. 8The issue had the potential to be the largest China-Asean conflict flashpoint after the South China Sea. Beijing regards controlling the river as a strategic objective. 8But after more than a decade of ham-fisted diplomacy, China has finally learned how to wield both the carrot and the stick in the region 8Are there lessons for India from the Mekong experience? Is there are. Click on Reports for moreDetails
Phosphoric Acid Expansion Project: On hold 8Cost - Rs 1100 Crore 8Project Description:A Fertilizer Company is awaiting environmental clearance for its phosphoric acid expansion, from 50417 to 131744 MTPA. A preliminary pre-qualification process will be ongoing, subsequent to which a tender for an LSTK contract will be taken out. the equipment requirements for the phosphoric acid plant are Storage Systems, Soda Ash Silos, Rotary Dryers, Grinding Unit, Ball Mill, Mixing Tanks, Blending Unit, Wet Scrubber Unit, Venturi Scrubber Unit, Cyclone System, Air Pollution Control System, Vibro Shifter, Screens and Sieves, Conveyors and more. 8Project Event: The Project is on hold, likely to be active in Q3 2018. Click here for more information SSP Fertilizer Greenfield Project: RFQ likely today 8Cost - Rs 90 Crore 8Project Description: A Fertilizer Company is planning to re-release the tender for an EPC contractor for a greenfield Single Super Phosphate Fertilizer project with a capacity 800 MTPD at Pandoli in Rajasthan. The tender was floated earlier but at that time bidders did not fulfill the BEC requirements. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers, Screens, Elevators, Furnaces, Cyclones, Blowers, Belts, Weighing machines and more 8Project Event: RFQ for an LSTK contractor is likely to be released today. Click here for more informationDetails
For reference purposes the website carries here the following tenders: 8Empanelment of Service Provider for providing assistance in land acquisition matters of Oil India Limited in Assam and Arunachal Pradesh Details 8Supply of Wireline Mast Unit for Logging Operation Details 8Hiring the services of Annual Maintenance Contract for Cathodic Protection Monitoring and Maintenance Details 8Supply of Safety Equipments for CB-ONN-2000/1, CB-ON/2, CBONN- 2002/3 and CB-ONN-2003/2 Blocks Details 8Hiring of Services for Custom Clearing and Forwarding Services for Onshore Blocks Details 8Extension of casing pipes for Haldia-Mourigram-Rajbandh-Barauni Pipelines Details 8Piping Jobs in DM plant and MEG Unit for installing Plate Heat ExchangersDetails 8Complete overhauling of Automatic Recirculation Valves in Panipat Naphtha CrackerDetails 8Supply of Pressure Control Valves with Electro-Hydraulic Actuator at HMRB PipelinesDetails 8Laying of Cross Country RLNG pipeline from Petronet LNG Terminal Dahej to IOCL Koyali RefineryDetails 8Hiring Inspection Engineer from TPIA for Shutdown at refineryDetails 8Providing Miscellaneous Services at Project Department of Panipat Naphtha CrackerDetails 8Hot and Cold job for Reactor Regenerator of FCCU and Coke Drum of DCU Shutdown at refineryDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8PM Narendra Modi to encapsulate making of new, innovative India in Davos Details 8Crude oil retreats from $70 highs but set for fourth week of gains Details 8Fossil fuels blown away by wind in cost terms: study Details 8J&K govt meets 75 per cent of targets under free LPG connection scheme Details 8European Union more dependent on Russian gas despite bid to diversify Details 8WEF ranks India 30th on global manufacturing index; Japan tops Details 8Iraq nears oil output capacity of 5 mln bpd, committed to OPEC cuts Details 8Vedanta Ltd urges government to resolve retrospective tax issues Details 8BP, Shell, Goldman express interest in filling Indian oil stockpile: Govt report Details 8India needs 533 mn tonnes refining capacity by 2040 to meet domestic demand Details 8Has surging crude oil brought politics back to energy pricing? Details 8More needed by way of auto fuel price hikes Details 8As oil price flares up, India steps up non-Opec imports Details 8GST call on natural gas Details 8Essar Oilfield Services eyes 20% jump in revenues next fiscal Details 8Cairn India to invest Rs 37,000 crore to ramp up production Details 8Oil dips away from 2014 highs on rising U.S. rig count, but market supported Details You can also click on Newsclips for moreDetails
As any equipment and service provider will know, the capital approval date is an important milestone in the progress of a project. Until that happens, the project is just a lot of talk, particularly when it comes to mid-sized or small companies. 8Our mechanical engineers working on the project monitoring software have four important dates on which they keep continuous vigil through their contracts on the ground. And these are the capital approval date, the next RFQ date, the actual release date (these two dates are continuously updated depending upon the phase and state of a project), the start-up date and the commissioning date. 8Two of these dates cater to a set of clients which are not necessarily equipment and service suppliers. 8Banks and financial institutions are keen to know when the capital approval date is coming up, so that they can pitch for loans and other financial services. 8Raw material suppliers keep an eye on the commissioning date as a few months before that happens, the owners of the project being looking to source raw material or feedstock requirements for the project upon its commissioning. The website carries here one instance where the owner of a greenfield hydro electric power project has begun discussion with banks for a loam. Our feedback is that he is willing to speak to to as many banks as possible for better terms. 8Project Cost: 900 crores 8Project Description: The RFQ for a greenfield 85 MW (2*42.5 MW) hydroelectric plant has been delayed on account of delay in the environment clearance and techno-economic clearance due to protest amongst the villagers even after a public hearing was conducted again in December 2017. Environment Clearance is pending which is likely to be elicited in 4-5 months. Forest Clearance is also pending at the DFO level. Techno-economic clearance from the CEA was submitted on July 2016 and it is pending. Currently, the owner is in discussion with financial institutions for funding of project. RFQs for civil works are expected after environmental clearance. 8Project Event: RFQs for civil works are expected by Q4 2018. 8Expenditure Approval: Apr/2018 8RFQ Date: Q4:2018 8Release Date: Q1:2019 8Start Date: Q4:2019 8Completion Date: Q4:2024 Click here for more informationDetails
8Project Name: Greenfield 2G Ethanol Bio-Refinery 8Project Cost: Rs 750 Crore 8Project Description: An existing company along with EPC contractor and licensor is planning to construct an ethanol plant based on the DBT-ICT 2G Ethanol technology developed indigenously to produce 100 KL fuel-grade ethanol per day, primarily from biomass and will use approximately 72 MTPD of biomass per year at its refinery. 8Project Event: RFQ for LSTK contractor is expected by February 2018. 8Expenditure Approval: Q2:2017 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: Q1:2018 8Completion Date: Q1:2020 Click here for more details. 8Project Name: Refinery Expansion - Revamp of Catalytic Reformer, Naphtha Hydrosulphurization units 8Project Cost: Rs 827 Crore 8Project Description: An existing company along with EPC contractor and licensor is conducting detailed engineering to convert the Catalytic Reformer unit to an Isomerization unit while also revamping the Naphtha Hydro-Desulfurization unit to a Naphtha Hydro-Treating unit to maximize isomerate yield and octane number and produce products like food grade hexane at its refinery. At present civil work is going on. 8Project Event: RFQ for electrical and instrumentation work is expected by March 2018. 8Expenditure Approval: Q2:2016 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q2:2016 8Completion Date: Q2:2020 Click here for more details. 8Project Name: Oilfield Development. 8Project Cost: Rs 210 crore. 8Project Description: Promoter is planning development of an onshore block. The project involves development drilling of 10 wells, installation of an EPS and laying of pipeline from oilfield to the nearest Early Production System (EPS). Promoter has hired the consultant for PFR report preparation. Currently, the project is in pre-clerance phase. The Early Production System is expected to be completed on EPC basis at an overall cost of Rs 8 Crores. Further RFQs are expected shortly. 8Project Event: A prequalification criterion meeting for various equipment and Early Production System is expected to be scheduled by mid-February 2018 8Expenditure Approval: Q4/2017 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: Oct/2018 8Completion Date: Oct/2020 Click here for more details 8Project Name: Oil Field Development : RFQ date changed to February. 8Project Cost: Rs 60 crore 8Project Description: Promoter is planning the development of an oil field. The block was awarded to the company under-discovered small fields round (DSF) in 2016. The project involves development drilling of oil wells and laying of an infield pipeline to connect with the nearest production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2019. Further RFQs are expected shortly. 8Project Event: RFQs for hiring services for rigs and other oilfield services are expected by February 2018. 8Expenditure Approval: Q4/2017 8RFQ Date: Feb/2018 8Release Date: June/2018 8Start Date: Q4/2018 8Completion Date: Q4/2020 Click here for more informationDetails
For reference purposes the website carries here the following tenders: 8Production Enhancement Contract of oil and gas from mature fields Details 8Procurement of 6700 Kg Citric acid, 20000 Kg Biocide and 15600 L Defoamer liquid ecofriendly Details 8Supply, Installation and Commissioning of Organic Waste Converter on Turnkey Basis Details 8Laying of Underground PE Pipelines at Sonipat and Meerut Details 8Implementation of SAP Business Planning and Consolidation Details 8Procurement of blower and compressor spares of Panipat Naphtha Cracker Details 8Composite Repair/ Coating Strengthening of various Pipe Lines at refineryDetails 8Hiring of Services for Handling Chemical/ Sand/ Petty Store Items of WSS, AhmedabadDetails 8EIA Study for obtaining Environmental Clearance as Development Drilling of Wells and Conversion of Exploration Wells into Development WellsDetails 8Procurement of HSD and Petrol for A&AA BasinDetails 8Supervisory services for testing and commissioning of Gas Turbine GeneratorDetails 8Corrigendum: Procurement of 12000 mt Butene for LLDPE/ HDPE UnitDetails 8Procurement of Personnel Protective Equipments at VijaipurDetails You can also click on Tenders for more For reference purposes the website carries here the following Newsclips: 8Premier Oil output set to rise by more than 10 per cent in 2018 Details 8Regulatory Board to begin process to auction gas distribution licenses: Dharmendra Pradhan Details 8GAIL to set up India's 1st coal-to-gas conversion plant Details 8Premier Oil to focus on repaying debt as production rises Details 8Oil minister rules out upstream oil gas regulator Details 8Oil PSUs to form SPV for mega natural gas pipeline network in North-East: Pradhan Details 8Global operations chief at GE's Baker Hughes oilfield unit resigns Details 8Global oil markets cling to near 3-year highs on tighter U.S. market Details 8Auction of gas distribution licence for 100 more cities soon, says Pradhan Details 8India’s 2017 oil demand growth records lowest gain since 2013 Details 8Gas grid blueprint for east Details 8GAIL to extend Urja Ganga gas pipeline to Guwahati Details 8Oil prices expected to trade around $60-$70 through 2020: Kemp Details 8U.S. senators from 12 states seek offshore drilling exemptions like Florida's Details 8Oil dips away from levels last seen in late 2014, but analysts say market supported Details 8China's CNPC looking for new gas sources in Myanmar -China Daily Details 8China Dec gas imports at record, crude off Nov high - Reuters calculations Details You can also click on Newsclips for moreDetails
8Project Name: Thermal Power Plant Maintenance Project (Unit-1) 8Project Cost: 25 crores 8Project Description: The owner has planned a 60-day scheduled maintenance of Unit-1 (660 MW) in the 1320 MW (2*660 MW) covering an annual maintenance of equipment which includes overhauling of auxiliary parts of turbine, boiler, generator comprising HP, IP, LP cylinders gas testing, testing and cleaning of condenser parts, Residual Life Assessment of boiler pressure parts, assessing performance and condition monitoring of the furnace, mills, APH and associated ducts. 8Equipment required will be air filters, boiler tubes, buckstays, chevron blades, condenser tube banks, thrust bearing, journal bearings, among others. 8Project Event: RFQs for short lead equipment required are expected by February 2018. 8Expenditure Approval: Q2:2017 8RFQ Date: Feb/2018 8Release Date: Feb/2018 8Start Date: 13/Mar/2018 8Completion Date: 11/May/2018Details
8Project Name: Renovation, Modernization and Life Extension of Hydroelectric Project 8Project Cost: 70 crores 8Project Description: The owner is planning to renovate, modernize and extend the life of a 139.20 MW (4x13.2 MW + 4x21.6 MW) hydro power station. The plant is undergoing a very low plant load factor. The turbine has been supplied by Boving, UK and generator has been made by General Electric, USA. Currently, DPR has been prepared by a technical committee and forwarded to the KERC board for approval. The owner will come out bids for hydro-mechanical works, turbine and inlet valve, generator & auxiliaries and civil works comprising refurbishment of pen-stock, intake gates and trash racks, replacement of stop log gates, refurbishment of butterfly valves, replacement of relays, repair works of power channel side walls, collapsed abutments and piers of foot bridge, among others. Work for RM&LE is expected to start by late 2019. Further RFQs for the project are expected soon. 8Project Event: RFQ for renovation, modernization and life extension works are expected by Q3 2018. 8Expenditure Approval: Mar/2018 8RFQ Date: Q4:2018 8Release Date: Q1:2019 8Start Date: Q3:2019 8Completion Date: 2021 Click here for more information 8Project Name: Captive Power Plant : DPR preparation delays RFQ 8Project Cost: 200 crores 8Project Description: The RFQ for a coal based captive power plant consisting of expansion and modernizing its existing 125 MW captive power plant to 141 MW has been delayed on account of preparation of DPR. DPR is in final stages of completion, subsequently after which an EIA report will be prepared. Three units of cumulative capacity 50 MW (30 MW + 10 MW + 10 MW) are going to be replaced with a single unit of 66 MW. TOR was granted to this project on July 3rd, 2017. Currently, the owner has decided to finance the project through internal funds and debts. Environment Clearance for the project is expected to be elicited by Q3 2018. Further RFQs for turbine generator with their auxiliaries (worth Rs 49.9 crores); boiler house including ESP, ash handling and other auxiliaries (worth Rs 100.9 crores); fuel handling plant (worth Rs 11.3 crores); electrical installations ( worth Rs 18.7 crores); civil work (worth Rs 21 crores) are expected soon. 8Project Event: RFQs for the major equipment are expected by Q4 2018. 8Expenditure Approval: Q3:2017 8RFQ Date: Q4:2018 8Release Date: Q1:2019 8Start Date: Q3:2019 8Completion Date: Q1:2021 Click here for more informationDetails
8Project Name: Refinery Shutdown Project 8Project Cost: Rs 20 Crore 8Project Description: An existing company is planning for a 30-day shutdown of CDU-2 and FCC units from July 2018 at its refinery. This is a maintenance shutdown. 8Project Event: RFQ for a contractor is expected by April 2018. 8Expenditure Approval: Q1:2018 8RFQ Date: Apr/2018 8Release Date: May/2018 8Start Date: Jul/2018 8Completion Date: Aug/2018 Click here for more details. 8Project Name: Refinery BS-VI Upgradation Project 8Project Cost: Rs 497 Crore 8Project Description: An existing company along with EPC contractor and licensor has brought out an RFQ for equipment for a new FCC gasoline desulphurization unit with a capacity of 0.6 MMTPA and expansion of the DHDT unit from 1.8 MMTPA to 2.4 MMTPA at its refinery. Engineering activities are currently on in the project. Further RFQs are now awaited. 8Project Event: RFQ for erection and installation work is expected by March 2018. 8Expenditure Approval: Q4:2016 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q2:2017 8Completion Date: Jun/2019 Click here for more details. 8Project Name: Refinery Expansion Project 8Project Cost: Rs 27000 Crore 8Project Description: An existing company is planning to expand its existing 1 MMTPA refinery to 10 MMTPA by installing a new 9 MMTPA crude distillation unit at its refinery. The pre-feasibility study was completed by Engineers India Limited and the project is awaiting various approvals. RFQ for the DFR consultant is already out. 8Project Event: RFQ for Project Management Consultant is expected by April 2018. 8Expenditure Approval: Q3:2017 8RFQ Date: Apr/2018 8Release Date: May/2018 8Start Date: Q3:2018 8Completion Date: Q2:2022 Click here for more details. 8Project Name: Refinery shutdown project 8Project Cost: Rs 20 Crore 8Project Description: An existing company is planning for a 30-day shutdown of its Refinery. This is a planned maintenance shutdown 8Project Event: RFQ for Project Management Consultant is expected by February 2018. 8Project Event: RFQ for manpower is expected by February 2018. 8Expenditure Approval: Jan/2018 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: Apr/2018 8Completion Date: May/2018 Click here for more details. 8Project Name: Oil Field Development 8Project Cost: Rs 150 crore. 8Project Description: Promoter is planning the development of the Barsilla oilfield. The block was awarded to the company under the Discovered Small Fields Round 2016. Environment consultant has been hired as a consultant for PFR preparation. The project involves development drilling of oil wells and laying of an infield pipeline to connect with the nearest OIL's production facility (GGS). Currently, the project is in pre-clearance phase. Production from the block is expected to start by the end of 2021. Further RFQs are expected shortly. 8Project Event: RFQs for hiring Project Management Consultant is expected by March 2018. 8Expenditure Approval: Q4/2017 8RFQ Date: Mar/2018 8Release Date: Apr/2018 8Start Date: Q1/2019 8Completion Date: Q1/2021 Click here for more details 8Project Name: Dual CNG-Diesel usage in rigs 8Project Cost: Rs 50 crore 8Project Description: Promoteris planning to power its own drilling rigs with Compressed Natural Gas (CNG) in addition to the already existing diesel mode. The project involves utilization of a dual fuel combustion system to power 19 diesel engines, which in turn would be used to run 5 drilling rigs. RFQs for the project have been slightly delayed. The CNG will be supplied from the GGS. Currently, dual fuel option is being tested on one engine. An EOI for Cascades, filling system, transportation and decanting had been floated from promoter's end. Further RFQs are expected shortly. The mechanical equipment required would be Air Filter, Gas Mixer, Turbo Compressor, Gas Metering Control Unit, Knock Sensors, Dual Fuel Controller, Safety Valves, Controller, Common Rail System. 8Project Event: RFPs for transportation are expected by February 2018 instead of January 2018. RFQs for hiring the mechanical equipment for Dual Fuel Combustion engine is expected by March 2018 instead of January 2018. 8Expenditure Approval: Oct/2017 8RFQ Date: Feb/2018 8Release Date: Mar/2018 8Start Date: May/2018 8Completion Date: Dec/2018 Click here for more informationDetails
The global purchasing manager's index shows a positive upswing for India. The country also provided a high return on equity in comparison to many other countries around the world. Click on Report for more. 8Crude oil prices edged higher as ongoing cheerfulness over OPEC-led production cuts balanced fears US output could push above a 47-year high. Click on Report for more. 8The year of 2018 is expected to be a good one for Indian markets broadly. The first big event is the Union Budget slated for February 1st, 2017. Expectations have been aligned to the possibility of the GoI straying from the fiscal targeting path that would see FY19 fiscal deficit target being set at 3%. Click on Report for more. 8Get the Pneumatic Equipment Industry Report 2021. Click on Reports for more
Details
Only a given set of enhanced recovery processes will be recognized by the government. 8For equipment and service providers, we are carrying here the entire list of eligible practices. 8A spurt in interest is these techniques will be seen once the new rules are notified Click on Reports for more
Details
The draft rules claim that fields which are under arbitration with the government or under court proceedings will not be entitled to benefits drawn up for enhanced recovery programmes. 8This seems unfair given the fact that the laws provide the right to a company to arbitrate or litigate should it find the government's decision making unfair. 8The policy seems to reflect the current dispensation's discomfiture with the entire arbitration process. Click on Reports for more
Details
All fields will have to go through compulsory enhanced recovery screening under the guidance of the DGH. 8There will be a reasonable tax break given for companies to undertake such screening 8And there will be a pilot stake to the entire programme 8For the incentive to take effect, the fields should be in production for a minimum three years 8Fields which are currently producing oil or gas using ER techniques and/or fields for which FDP has been approved for ER projects before the notification date will not be considered eligible for incentives under this policy Click on Reports for more
Details
The government will soon come out with a new incentive scheme to promote Enhanced Oil Recovery (EOR) in Indian oil & gas fields which will provide yet another boost to investments in the sector. 8The incentive will be in the form of a waiver of 50% of the applicable cess on gross production of crude oil from designated wells of an approved EOR project for 10 years. 8In case of regimes where cess is not applicable, a notional cess shall be calculated, and the equivalent amount reduced from the government’s share of profit petroleum or revenue share, as applicable. 8Importantly, the waiver on cess would be applicable only if the average crude oil price of Indian Basket is below EOR reference price. Know more about what this price is. 8There will be an incentive equivalent to 10% of gas wellhead price on the gross production of gas from designated well of an approved EOR / unconventional gas production project for a period of 10 years. The incentive will however be capped at USD 0.6 per mmbtu for offshore fields and USD 0.3 per mmbtu for onshore fields. 8For offshore fields, the incentive will be in the form of waiver of applicable royalty on the gross production of gas from designated well of an approved EGR / unconventional gas production project. 8For onshore field the incentive shall be in the form of discount on the governments’ share of profit petroleum or revenue share. For onshore fields where no profit share or revenue share applicable, government will make a budgetary allocation for equivalent incentive. Click on Reports for more
Details
So, after disappointing global growth over the past few years, the recent allround economic pickup combined with the relatively subdued fleet growth provides an ideal window of opportunity for the shipping industry to enjoy good returns. 8So expect shipping companies to do better this year 8The expected uptick in oil & gas vessels may not happen this year but the worst is over. A rapid expansion is now projected going ahead, and increased activity will go on until 2027, as per projections already carried here 8The industry needs to just sit it out before the party begins Click on Reports for more
Details
The third quarter is slated to be a good one for the oil & gas sector 8OMCs are expected to benefit from adventitious gains, which will be offset by lower refining and marketing margins 8RIL’s standalone performance will be boosted by higher petchem volumes, which will be offset by lower refining margins 8Upstream PSUs will report sequentially strong EBITDA led by increase in global crude and domestic gas price a 8Gas sector companies will gain amid firm volumes and stable tariffs and margins Click on Reports for more on what can be in store
Details
Ammonia-Urea
& Captive Power Plant Greenfield Project 8Cost -
Rs 10741 Crore 8Project
Description:A
Fertilizer Company is planning a greenfield coal-based ammonia-urea plant with a
capacity 2200 MTPD of ammonia, 3850 MTPD of urea and 70 MW of Captive power
plant. The consultant and process licensors have been appointed. The tender is
out for the LSTK contractor. 8Project
Event: RFQ for LSTK contractor was floated in May 2017 and the bid
closing date for Coal Gasification Plant for Generating Ammonia Syn. Gas &
Carbon Dioxide Gas is extended from 26 November 2017 to 28 February 2018 and the
ammonia-urea plant is extended from 9 January to 8 March 2018.
Click here for more information Ammonia-Urea Energy Saving Project 8Cost -
Rs 481 Crore 8Project
Description: Thermax, BHEL, Sterling & Wilson are in the race for an
energy saving project of Rashtriya Chemical and Fertilizer Ltd at its Trombay
Fertilizer Complex in Mumbai. Rashtriya Chemical and Fertilizer Ltd is planning
to reduce the energy consumption of its Ammonia and Urea units from 8.73 Gcal/MT
to 8.40 Gcal/MT and 6.75 Gcal/MT to 6.45 Gcal/MT respectively in India. The
capacity of the ammonia plant is 1045 MTPD and the urea capacity is 1000 MTPD.
The equipment requirements are 2 nos of GTG with a capacity 25 MW (ISO Rating),
2 nos of HRSG with a capacity 65 TPH, Replacement of turbine for the Benfield
Solution Pump in Ammonia with a new motor, De-aerator (2 nos.) with HP BFW Pump
motor set 2 x (1+1), One PRDS system for 12 ata to 4.5 ata in the Ammonia plant,
Modification in Power Distribution System. Environment clearance is awaited and
it will take about three months. 8Project
Event: The selection process for the LSTK contractor is on and
techno-commercial discussion is completed and price bid is likely to be opened
by the end of January 2018
Click here for more information Details
Coal India Ltd has sprung a surprise by raising prices more than what was expected by the market 8FSA realizations are now set to rise 8So will e-auction volumes Find out more about the company's strengthsDetails
You get a dedicated analyst with your subscription to our project monitoring website. No other website offers this advantage. And the subscription comes at an incredibly low price. 8 Dispel your doubts on a project and check out the rumors. Just get across to your dedicated analyst. Talk to him and he will check out the facts and get back to you within a given timeline. 8He will be available between 9.30 AM to 6.30 PM IST, Monday through Friday. And all you have to do is to call him or send him a mail. In every project that you look at, you will get an opportunity to check out the facts with him 8Primary collection of project related data is conducted by trained mechanical engineers at our back end. We usually spend months training an engineer on the fine art and skills of collecting information. 8So whenever you speak to your analyst, he will most likely be aware of much more than what is available in the database. Do check him out. 8We admit that data collection for projects is a vast exercise and it may not be possible to find all the answers 8But if you were to ask your dedicated analyst to clarify a rumor you have heard or a fact that you want double checked, just get across to him. He will help you out. You can check out the following facts about any project: 8Validation of future RFQ dates, capital approval date, start up date or a commissioning date 8Details on specific equipment and service requirements coming up in the future 8Information on possible forward movement in case of delay 8Key project related contacts, at the level of the owner or the contractor. Fully validated, so all you have to do is call and fix an appointment. 8Extra information on maintenance schedules, annual contract expiration or retendering dates You can find out more on the 8Energy matrix of an industrial facility, whether fresh demand is coming up 8Technology in use 8Raw material consumed or likely to be in demand 8Intermediate and finished product data 8Maps and directions We have been in the business for two decades now. No one gives you project information like we doDetails