All the news items since the launch of our web site are preserved in the archive section. The archive entries are freely accessible to all the users.


Mar 2018

For reference purposes the website carries here the following tenders:
8Supply of RLNG Heating System (Shell and Tube Heat Exchangers) Details
8Supply of Sulphur Recovery Catalyst with Support Balls Details
8Supply of CS Tubes in refinery Details
8Supply of Turbine and Compressor Spares in refinery Details
8Procurement of Coke Cutting System Pump and DCV spares Details
8Rubber lining and FRP lining of tanks vessels pipes and fittings inclusive of their material supply in DM plant at TPS unit of refinery on ARC basis Details
8Supply of Radar Level Gauges in refinery Details
8Corrigendum: Procurement of Electrical Consumables Details
8Mechanical Agency for execution of various Process Schemes at Offsite on ARC basis at refinery Details
8Operation/ Monitoring of Substations and its allied services of refinery Details
8Global Expression of Interest for Third Party Inspection Services Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8INSIGHT-U.S.-trained engineer takes on Algeria's energy monolith Details
8ICICI Bank rubbishes reports of wrongdoing in Videocon loan, says Chanda Kochhar went by rules Details
8ABB ready to participate in global upswing in 2018 - CEO Ulrich Spiesshofer Details
8Russia's Novak tells Putin global oil deal boosted state foreign currency income Details
8Exclusive: China taking first steps to pay for oil in yuan this year - sources Details
8Bio-fuel business to pick up in India: Atul Mulay, Praj Industries Details
8Gas price hike to jack up power cost by 3 per cent; CNG, PNG to get costlier Details
8India needs more reforms to achieve 8-9% Growth: Nobel Laureate Roubini Details

8IOC to buy 4% stake in LanzaTech Details
8BP says R-Series gas field in D6 block to start output in 2020 Details
8IOC launches 5 kg LPG cylinder Details
8Riyadh to cut reliance on oil Details
8No initial impact of BS-VI compliance cost on diesel, petrol prices Details
8Reliance Industries, BP India put Cambay oil and gas block on sale Details
8FY19 likely to be a volatile year for Indian equities, believe experts Details
8What the new fiscal year holds for Narendra Modi government Details
8Petronet to invest Rs 400 crore next fiscal; Kochi utilization seen dipping in Q4 Details
8India's February oil imports from Iran up 1.3 per cent year-on-year Details
8Dozen municipalities evinced interest in waste to energy plant: Ion Exchange Details
8COLUMN-China's crude oil futures contract should confound the sceptics: Kemp Details
8Exxon leads oil majors in bids for Brazil's offshore reserves Details
8U.S. judge dismisses Exxon lawsuit to stop climate change probes Details
8China is no threat for India on energy front: Dharmendra Pradhan Details
8Gujarat Energy Minister Saurabh Patel rules out future of coal or gas-based power plants Details
8‘LNG from U.S. to arrive on March 30’ Details
8Mahanagar Gas, Sanwariya Gas to open Liquefied CNG Pumps Details
8ONGC gas pipelines near runway a concern for ONGC gas pipelines Details
8Bangladesh Petroleum Corporation to import 66,000 MT of high speed diesel from Numaligarh Refinery Details
You can also click on Newsclips for more
Details
8Project Name: Site Leveling and Infra Works Package.
8Project Cost: 80 crores
8Project Description: The owner's 700 MW thermal power plant is under commercial operation. Further RFQs are expected soon.
8Project Event: RFQs for balance works of site leveling and civil infrastructure works package are expected by first week of April 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: 5/Apr/2018
8Release Date: May/2018
8Start Date: Q3:2018
8Completion Date: Q1:2019
Click here for more information
8Project Name: Hydroelectric Power Station - Annual Maintenance Contractor
8Project Cost: 0.50 crores
8Project Description: The owner is going on with commercial operation of its 500 MW hydroelectric power station. The contract duration will be of 12 months. Further RFQs are expected soon.
8Project Event: RFQ of an annual maintenance contract for hydro-mechanical equipment are expected to be out in Q3 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q3:2018
8Release Date: Q3:2018
8Start Date: Q4:2018
8Completion Date: Q4:2019
Click here for more information
8Project Name: Boiler Maintenance of Thermal Power Project
8Project Cost: 22 crores
8Project Description: The developer has planned a scheduled boiler and its auxiliaries maintenance for 20-days at its 1200 MW thermal power complex. NIT is under preparation and a bid will be floated after getting approval from required headquarters.
8Project Event: RFQs for overhauling of boiler and its auxiliaries are expected by Q2 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Q2:2018
8Release Date: Q2:2018
8Start Date: 3/Jul/2018
8Completion Date: 1/Aug/2018
Click here for more information Details
Our forward looking oil & gas project monitoring software provides a dynamic feedback matrix on the situation on the ground. Our team of mechanical engineers updates RFQ dates for projects all the time. In a large project, there can be dozens of updates up until commissioning happens. Two weeks before a a projected RFQ date, our backend software sends out an alert to the concerned analyst to follow up on what happens next. And this leads to a continuous cycle of follow ups. In today's update, we have three business leads in the E&P sector. The information comes straight from the project promoters so they are never off the mark. Dozens of project-related parameters are highlighted in our software updates along with key contact data. And to top it all, we provide a dedicated engineer who will offer live support. 
Project Name: Greenfield Early Production System
8Project Cost: Rs 300 Crore.
8Project Description: Promoter has decided to change its plans to go for equipment wise RFQs to an EPC mode to set up an Early Production System. The equipment requirement will be Gas Turbine, Air Compressor, Storage tanks, Well Head, Water Injection Well, Flare Stack, Gas pipeline.
8Project Event: RFQs for hiring EPC contractor for EPS is expected by June 2018.
 RFQs for hiring EPC contractor for the pipeline is expected by July 2018.
8Expenditure Approval: Q2/2016
8RFQ Date: Apr/2018
8Release Date: May/2018
8Start Date: Q2/2018
8Completion Date: Q3/2019
Click here for more details

8Project Name: Oil Field Development
8Project Cost: Rs 700 crore
8Project Description: The Promoter is planning development drilling of 60 wells. The tentatively targeted depth of the wells will be up to 4000m. The locations are proposed to be drilled by electrical type rigs which will be hired on EPC basis. An EIA report has been recently submitted for the project. Further RFQs are expected shortly.
8Project Event: RFQs for the hiring of rig services are expected by Q3:2018.
RFQ for the equipment and oilfield chemicals is expected by Q3:2018.
8Expenditure Approval: Q2/2017
8RFQ Date: Q3/2018
8Release Date: Q3/2018
8Start Date: Nov/2019
8Completion Date: Nov/2022
Click here for more details
Offshore Seismic Survey: RFQs to be out soon.
8
Services will be hired for an overall period of 10 months.
8Early Completion to be incentivized.
Click details for more information
Details
If you are an oil & gas business development manager, we provide you the widest possible coverage of petroleum projects in India. While our tender section and our highly valued analysis segment take care of your immediate needs, what we have additionally assembled here is the country's most sophisticated project monitoring software, capable of throwing up thousands of exclusive data points which, in turn, translate into hundreds of specific forward-looking leads. Our dedicated analysts will provide live support to all your queries. If you have heard a rumor, or you want to check out some facts, all you have to do is call your analyst. Many of the country's largest EPC contractors, subcontractors and equipment suppliers are our subscribers today. 
These are the leads of the day:
8Project Name: Greenfield Pipeline Project
8Project Cost: Rs 200 Crore
8Project Description: A private operator is going ahead with a natural gas pipeline project.
8Project Event: RFQ for the PFR consultant is expected by May 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date : Q1:2019
8Completion Date : Q3:2020
Click here for more details.

8Project Name: Greenfield Natural Gas Pipeline Project
8Project Cost: Rs 7000 crore
8Project Description: Another private company is going ahead with a gas pipeline project.
8Project Event: RFQ for the LSTK contractor is expected by August 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Aug/2018
8Release Date: Sep/2018
8Start Date : Q4:2018
8Completion Date : Q4:2020
Click here for more details.

8Project Name: Natural Gas Pipeline Project
8Project Cost: Rs 1600 Crore
8Project Description: An EPC contractor has been appointed by the owner for a natural gas pipeline.The project, however, was on hold but it is now learnt that RFQs are expected ahead.
8Project Event: RFQ for the LSTK contractor is expected by September 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Sep/2018
8Release Date: Oct/2018
8Start Date : Q4:2018
8Completion Date : Q4:2020
Click here for more details.

8Project Name: POL Terminal Expansion Project
8Project Cost: Rs 100 Crore
8Project Description: An owner is going through the contracting process for the expansion of its terminal capacity. A slight delay in the selection of PMC contractor is due to "environment clearance" issues.
8Project Event: RFQ for the Project Management Consultant is expected by May 2018 instead of March 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date : Q2:2018
8Completion Date : Q2:2020
Click here for more details
Details
For reference purposes the website carries here the following tenders:
8Procurement of Spares for Ultrasonic Flare Flow Meters installed in various units of refinery Details
8Procurement of Guided Wave Radar Level Transmitters at refinery Details
8Rate Contract for Operational Assistance and Allied Maintenance Jobs at refinery Details
8Health Assessment and Assistance during Revisioning of Spring Supports at refinery Details
8Rate Contract for supply of valves for two years Details
8Supply of Turbine Spares in refinery Details
8Supply of Mechanical Seal Spares in refinery Details
8EOI for Integrated Development Services in the RJ-ON-90/1 Block Details
8Hiring of Services for Job Execution Assignment for Drilling Rigs Details
8Procurement of Flanges for All India Locations on ARC Basis Details
8Annual Maintenance Contract for Civil Maintenance Jobs at Gas Processing Unit Details
8Hiring of Third Party Inspection Agency for Quality Surveillance and Conformity Assessment for various projects Details
8Construction of Steel Pipeline and Associated Facilities on Annual Rate Contract basis for Western Region Details
8Carrying out Health check-up of PCRs of Rigs Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8OPEC seeks 'very long-term' cooperation with other oil exporters Details
8Shanghai crude futures complete globalization of oil markets Details
8Oil sector investment up but not fully recovered -OPEC's Barkindo Details
8OPEC to stick to supply curbs despite oil rally to $71 - sources Details
8Domestic Natural Gas price hiked marginally Details
8Cabinet approves MoU between India & SACEP Details
8India to consider Non-OPEC suppliers to bargain for cheaper prices Details
8Pradhan and Abott release joint statement on trade of Oil, Gas Details

8Oil prices rise as OPEC seen continuing supply cuts through 2018 Details
8Petrol price in India today: Global crude tumbles; check rates in Mumbai, Delhi, Chennai, Bengaluru, more Details
8Petrol, diesel prices: Your trip to the fuel station set to weigh heavy on pocket; here's why Details
8Shanghai oil futures sink below U.S. market Details
8Pradhan talks Texas ‘energy bridge’ as India to get 1st US gas cargo on Friday Details
8India raises locally produced natural gas prices for Apr-Sept to $3.06/mmbtu Details
8U.S. oil producer costs climb with more drilling -Fed Survey Bank Details
8France's Total wins three blocks in Mexico oil auction before presidential elections Details
8Tokyo Gas develops checking system for liquid Details
8Brazil court blocks inclusion of choice oil blocks in March round Details
8April-Feb fiscal deficit balloons to Rs 7.16 lakh crore, at 120% of FY18 target Details
8Japan's Sumitomo eyes ship-to-ship LNG bunkering in Tokyo Details
8First LNG shipment from US to reach India on Mar 30: Union Minister Dharmendra Pradhan Details
8Bharat Petroleum plans $3 billion petchem plant near Mumbai Details
8India will seek reasonable energy pricing: Dharmendra Pradhan Details
8Fossil Fuels squeezed by plunge in cost of renewables, BNEF says Details
8Natural gas is trading sideways in a small range Details
8Signs of revival in capital goods sector Details
8Profit booking likely to continue in crude oil prices Details
8What if you put BS6 fuel in your BS4 car? Will your engine die or will its emissions go down? We explain Details
You can also click on Newsclips for more
Details
8Project Name: Super Thermal Power Greenfield Project Stage-1
8Project Cost: 10000 crores
8Project Description: The developer is going on with construction and erection activities for a 1800 MW brownfield super-critical thermal power plant. Further RFQs are expected soon.
8Project Event: RFQs for balance works of an offsite area - civil works package are expected by first week of April 2018.
8Expenditure Approval: Feb/2005
8RFQ Date: 7/Apr/2018
8Release Date: May/2018
8Start Date: 2005
8Completion Date: 2020
Click here for more information
8Project Name: Super Thermal Power Plant - O&M Contract
8Project Cost: 1.00 crores
8Project Description: The owner has floated a bid for its 2000 MW thermal power complex. The complex is under commercial operation. Further RFQ of a maintenance contract is expected soon.
8Project Event: RFQs for O&M of electrical equipment are expected by May 2018.
8Expenditure Approval: Q3:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Aug/2018
8Completion Date: Aug/2020
Click here for more information
Township and office buildings: RFQs are expected in end of March 2018
8RFQ for construction of township and office buildings is expected by the end of March 2018. The owner is going on with evaluation of bids for a hydro-mechanical package. Further RFQs for infra works are expected soon.
Click here for more information Details
Twelve well drilling programme: RFQs for Rigs, ETPs and Equipment to be out in April
8RFQ for equipment is expected by June 2018 for a 12 wells drilling project. The forest clearance for the project has not been submitted as yet as well. The mechanical equipment required would be Pump Skid, Degasser Skid, Hopper Skid, HSD Transfer Skid, Diesel Gensets, Super Charger Skid, Wellhead and Christmas Tree. Moreover, RFQs for rigs are expected by April end.
Click here for more details

Three well drilling programme: RFQs for Wireline and cementing services in May, equipment and contractor RFQs in April
8
RFQs for wireline and cementing services for a three-well developmental drilling programme is expected in May 2018. RFQ for equipment and civil contractor were meant to come out in February and March this year for both but have now been delayed to April instead. 
Meanwhile, the rig for the project has also been finalized.
Click here for more details
8Project Name: Oil Field Development: Fresh greenfield opportunity
8Project Cost: Rs 300 crore
8Project Description: The Promoter is planning exploratory drilling of 17 wells. The tentative targeted depth of the wells will be up to 5200m. The equipments required for the project will be casing pipes, drilling pipes, cementing services, drill bits, Xmas Tree and other oilfield chemicals. An EIA consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of rig services is expected by Q3/2018.
RFQs for the equipments and oilfield chemicals are expected by Q3/2018.
8Expenditure Approval: Q3/2017
8RFQ Date: Q3/2018
8Release Date: Q3/2018
8Start Date: Oct/2019
8Completion Date: Oct/2021
Click here for more details
Details
8Latest data shows that global onshore E&P spending is seeing a upswing already whereas offshore spending is still to recover. Offshore capex spend expected to increase after 2017 with levels expected to be over 35% higher in 2021. Industry-wide, costs have reduced significantly from 2014. After 2020, a significant portion of future growth expected to be driven by deepwater developments. Click on Report for more.
8The website carries here a vigorous comparison of companies owning offshore rigs worldwise. A ranking is worked out accordingly. This is useful reading for offshore Indian E&P companies. Click on Report for more.
8McDermott has bagged a KG-D6 Subsea Installation Contract from Reliance Industries. Click on Report for more.
8There is one floater contact opportunity coming up in India. Find out more click on Report for more.
8Find out more on gas pipeline business development opportunities coming up ahead. Click on Report for more.
8Getting a good score on their MOU performance is a big deal for the brass in a public sector company. Find out which companies have done better than their peers in these rankings. Click on Report for more.
8Is the government interested in building the Middle East to India Deepwater Iran - Oman - India gas pipeline? Find out more click on report.
8The first LNG cargo out of the Yamal LNG terminal is headed towards India. Know more click on Report.
8The hype over a rosy future for city gas distribution companies have lead to over valuation of IGL shares. Find out how. Click on Report  for more.
8Find out what action IOC has taken on its fire incident in Hazira. What was learnt from the it? Click on Report  for more.
8Get the latest update on biofuel prices and taxes here. Click on Report for more.
8Get the latest production and import-export data on the Indian petroleum sector. Click on Report  for more. Details
The much-predicted LNG glut is not happening now
8Latest projections are that the glut may actually translate into scarcity.
8The demand-supply gap is likely to be plugged earlier now, by the early 2020s and a crunch seems to be coming up ahead.
8There are not enough new LNG projects coming up to handle the supply crunch looming ahead
8Find out more how LNG demand-supply projections have been turned dramatically in rising Asian demand, particularly from China
8But higher prices do not augur well for India, where the market is highly price sensitive. Liquid fuels will replace gas if the latter is priced higher.
Click on Reports for more Details
How you look at the offshore oil & gas market depends on whether the glass is half empty or half full.
8Offshore cost-cutting and technological innovations have brought the breakeven costs of some developments close to $40/bbl, equivalent or lower than US shale gas plays
8A lot of current offshore developments are now lower than the current price of crude.
8Another set of data shows that new offshore project commitments rose 65% in 2017 and are forecasted to rise 140% in 2018, and 95% of discovered but undeveloped offshore resources breakeven below $65/bbl.
8The point to note is that offshore wells are characterized by higher production rates and lower decline rates relative to those onshore.
8There are also compelling reasons why offshore production will have to increase. The industry is replacing extracted oil & gas at historic lows. It is replacing only a third of its production
Click on Reports  for more Details
Scandinavian countries are known for their innovation.
8The website carries here a range of prize winning innovations in the energy sector by start-ups from the region.
8Some of them are extremely interesting ideas that can make a material difference on the ground
8Big Indian oil companies, laden with cash, can look at some of them in case they are looking at widening their portfolios to include non-core activities which have big growth potential in the future
Click on Reports for more Details
A clutch of companies have been caught diverting APM gas for non-APM use
8Find out what their modus operandi is
8Also know more on what kind of penalties were imposed on them
Click on Reports for more Details
Ammonia-Urea Energy Saving Project
8Cost - Rs 347 Crore
8Project Event: EOI has already been released for an LSTK contractor in November 2017 but NIT not floated yet, and is likely to be floated in April 2018.
Click here for more information
Ammonia-Urea Energy Saving Project      
8Cost - Rs 250 Crore
8Project Event: RFQ for the EPC contractor is likely to be released in August 2018. The company is still struggling for capital approval, though it is determined to complete the project within two years.
Click here for more information
SSP Annual Maintenance Project 
8Cost - Rs 0.15 Crore
8Project Event: RFQ for Annual Maintenance Contractor is likely to be released in April 2018
Click here for more information 
Details
8Project Name: Greenfield Pipeline Project
8Project Cost: Rs 630 Crore
8Project Description:  An owner is planning a re-routing pipeline. The pipeline project will comprise of five pipelines that will transport white, black and lube oil. These pipelines have been provided with higher thickness as a stronger safety measure. Also, features such as optical fiber cable (for data transfer), leak detection, surge relief, thermal relief system and automatic shutdown facility are also part of this new pipeline project.
8Project Event: RFQ for the PMC Contractor is expected by July 2018.
8Expenditure Approval : Q3:2017
8RFQ Date : Jul/2018
8Release Date: Aug/2018
8Start Date : Q3:2018
8Completion Date : Q1:2020
Click here for more details.

8Project Name: Product Pipeline Expansion Project
8Project Cost: Rs 160 Crore
8Project Description: An owner is planning to expand its pipeline. The capacity expansion will be done in three phases. At present phase- II is going on and phase- III will start after the completion of phase- II. A private company has been hired as an EPC contractor.
8Project Event: RFQ for the laying work is expected by July 2018.
8Expenditure Approval : Q1:2017
8RFQ Date : Jul/2018
8Release Date: Aug/2018
8Start Date : Q2:2017
8Completion Date : Q3:2019
Click here for more details.

Pipeline Expansion Project : RFQ for main-line pipes is expected by May 2018.
 An owner along with EPCM contractor is planning to expand its pipeline. They are also planning to install a new pumping station which will be constructed with separate booster pumps for POL & LPG along with mainline pumps. There will also be a new intermediate pumping station which will be constructed along with a separate mainline pump for the expansion. RFQ for trenching and pipeline laying work will come after the RFQ for main-line pipes is out.
Click here for more details.

8Business Opportunity for Equipment Maintenance Contractor
A tong term equipment maintenance contract coming up in a refinery major
Click on Details for more, including the contact person.
Details
For reference purposes the website carries here the following tenders:
8Wrapping and Coating of Pipe Lines at refinery Details
8Supply of Pressure Gauges to refinery Details
8Procurement of Ammonia at refinery Details
8Supply of Pressure Transmiters at refinery Details
8Supply of Control Valve Spares in refinery Details
8Procurement of Spares for Ultrasonic Flare Flow Meters installed in various units of refinery Details
8Procurement of Guided Wave Radar Level Transmitters at refinery Details
8Procurement of Measuring Instruments CP and Electrical under RPNHQ Details
8Annual Maintenance Contract for O&M of PNG Network Details
8Procurement of Instrument Fittings and Tubings Details
8Security and Surveillance Services for LPG Pipelines Details
8Construction and Commissioning of Crude Oil Storage Tanks Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8South Korea aims for 2018 start-up of UAE nuclear power reactor Details
8Diesel use in India set for record in 2018 as govt plans massive infra spending Details
8Reliance Industries' arm sells assets in Eagle Ford shale for $100 million Details
8Shanghai crude oil futures off to robust start on second day Details
8China meets 2020 carbon target ahead of schedule: Xinhua Details
8China draws up plans to promote standardisation in electric vehicles Details
8Iraq may build oil storage in Japan, South Korea in bid to increase oil sales Details
8Farmers, Politicians protest against Oil Exploration, arrested Details

8Final Mexico oil auction begins with uneven demand ahead of election Details
8Modi government extends Open Acreage Licensing Policy deadline to May 2 Details
8Repsol, Premier win oil block in last Mexico auction before election Details
8India diesel use set for record high in 2018 as election season heralds government spending Details
8Gail India offers three LNG cargoes from Sabine Pass for May to July Details
8Coal India’s new pricing may raise fuel cost, consumers complain Details
8Russia ships out moisture separator-reheaters for TN nuclear project Details
8OPEC, Russia consider 10-20 year alliance to cooperate on oil supply cuts Details
8Oil prices fall on surprise U.S. inventory rise; China crude volatile Details
8Mexico's Pemex raises hand in final oil auction before election Details
8Germany's carbon emissions decline due to more wind power Details
8Eni sees no problems in Russian gas supply to Italy from political tensions Details
8Petrol price in India today up by 11-12p; check rates in Delhi, Mumbai, Bengaluru, Kolkata, more Details
8The destruction of India by way of Oil and Gas Exploration and Production Details
8Saudi Crown Prince says Aramco IPO may be 2019, Reuters reports Details
8RBI monetary policy: Status quo with caution in April and during 2018 Details
8ONGC Recruitment 2018 via CLAT-2018 Notification released at ongcindia.com Details
8German authorities approve Russia gas pipeline Details
8Reliance to sell second US shale gas project for $100m Details
8U.S. agency proposes scrapping higher automaker penalties for 'gas guzzlers' Details
8India diesel use set for record in 2018 as election season heralds govt spending Details
You can also click on Newsclips for more
Details
8Project Name: Thermal Power Greenfield Project
8Project Cost: 10000 crores
8Project Description: The owner's 1200 MW greenfield ultra super-critical thermal power plant is getting hampered on account of a delay in the signing of a power purchase agreement. The developer will come out with an EPC contractor package soon.
8Equipment required: steam turbine, water tube boiler, air cooled condenser, civil works, stacker and reclaimer, pulverizer, conveyer belts, induced draft cooling tower, chimney, elevators, scaffolding, piles, heat exchanger, hot air generator, cranes, among others.
8Project Event: RFQ for an EPC contractor is expected by May 2018, instead of March 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: May/2018
8Release Date: Q3:2018
8Start Date: Q2:2019
8Completion Date: Q2:2024
Click here for more information
8Project Name: Super Thermal Power Station - FGD Addition
8Project Cost: 200 crores
8Project Description: The developer is planning the installation of a Flue Gas Desulphurization (FGD) unit at it's 720 MW unit thermal power station. RFQ for supply of an FGD is expected to be out soon.
8The major requirements will be earthwork, cranes, pipes, installation, gypsum disposal, limestone, absorbers, silos, among others.
8Project Event: RFQ for supply of an FGD is expected to be out in May 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: May/2018
8Release Date: Q3:2018
8Start Date: Q2:2019
8Completion Date: Q4:2021
Click here for more information
Contact Update : 
Contacts are an important tool in the hands of a business development manager. We put in great efforts to get you validated telephone numbers of departmental heads within the power industry.
8A general manager of project of a major NTPC's plant has been added to an existing facility of a thermal power station.
Click on details for more information
Details
8 Project Name: Drilling Field Development
8Project Cost: Rs 600 Crore.
8Project Description: Promoter is planning the development of an oil and gas block. The project involves development drilling of 60 wells, construction of 10 Early Production System and laying of Infield Pipelines. Further RFQs are expected shortly.
8Project Event: RFQs for hiring an EIA consultant is expected by April end 2018.
RFQs for hiring an EPC Contractor and other Oilfield services is expected by June 2018.
RFQs for hiring rig services is expected by August 2018.
8Expenditure Approval: Q1/2018
8RFQ Date: Apr/2018
8Release Date: Jun/2018
8Start Date: May/2019
8Completion Date: Dec/2021
Click here for more details

8 Project Name:  Solar Block Integration.
8Project Description: Promoter is planning to install a Solar Heating System. Moreover, a slight delay has occurred in project RFQs. Further RFQs are expected shortly.
8Project Event: RFQs for hiring LSTK contractor are expected by May instead of April 2018.
8Expenditure Approval: Nov/2017
8RFQ Date: May/2018
8Release Date: Jul/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more details
8Project Name: Oil Field Development
8Project Cost: Rs 200 crore
8Project Description: The Promoter is planning onshore development drilling of 07 wells. The block has been awarded Under NELP-IX bid round. The project also involves the construction of a Quick Production Facility (QPF) at a well site for water separation and a storage tank facility for storing of produced oil in all the production sites. The equipment required will be drilling rigs, casing pipes, drilling pipes, drill bits, cementing services and other oilfield chemicals. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of rig services is expected by Sep:2018.
RFQ for the equipment and oilfield chemicals are expected by Sep:2018.
8Expenditure Approval: Q4/2017
8RFQ Date: Sep/2018
8Release Date: Oct/2018
8Start Date: Oct/2019
8Completion Date: Dec/2021
Click here for more details
Details
8Project Name: Refinery Shutdown Project
8Project Cost: Rs 20 Crore
8Project Description:  An owner is planning for a Shutdown from July 2018. This is a maintenance shutdown and it is for 30 days.
8Project Event: RFQ for an EPC contractor is expected by June 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date: Jul/2018
8Completion Date: Aug/2018
Click here for more details.

8Project Name: Depot Expansion Project
8Project Cost: Rs 150 Crore
8Project Description: An owner is planning to expand its Depot's storage capacity.
8Project Event: RFQ for PMC contractor is expected by June 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date : Q4:2018
8Completion Date : Q4:2023
Click here for more details.

8Project Name: Refinery DHDT Debottlenecking Project
8Project Cost: Rs 1810 Crore
8Project Description: An owner along with EPCM contractor and licensor is planning to expand its DHDT unit at its refinery. RFQ for the equipment is already out. At present civil work is going on.
8Project Event: RFQ for electrical and instrumentation work is expected by June 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date : Q1:2018
8Completion Date : Q1:2021
Click here for more details.

8A Long Term Contract Coming Ahead In A Major Refinery. Details
8Despite many "buy" recommendations by stock broking firms, a quantitative analysis seems to show that it is currently over priced. Find out why click on Report.
8Here is a profile of a clean water technology company now making a big impact in India. Click on Report for more.
8There are many gas detection device manufacturing company. Here is a reliable one. Click on Report for more.
8Here is another company providing turnkey solutions encompassing designing, erection, commissioning and maintenance for fire & gas (F&G) detection systems. Know more about how exclusive supply arrangements are securing the company's future. Click on Report for more.
8Get the latest on ONGC's deal with Bangladesh Petroleum Corporation (BPC) for a 6,900 km gas pipeline that will link Bangladesh, Myanmar and the northeastern states. Is it just a pipe dream or is there more to it than meets the eye? Click on Report for more.
8If US sanctions are reimposed on Iran, as is likely, what happens to the Frazad B and other investments planned by Indian companies? Click on Report for more.
8Find out more on how urban air quality was improved in China by deploying gas. Click on Report for more.
8Know more about the global ethanol trade and how India plays a big role in it. Click on Report for more.   Details
A massive incremental capex of up to Rs 400,000 crore can be expected by public sector oil marketing companies over the next 5 to 7 years
8Refinery capacity increase will be of the order of 134 million tonnes
8This is an unprecedented level of investment by all past yardsticks
8EPC contractors such as L&T and EIL as well as a range of foreign licensors and EPC companies are likely to be the major beneficiaries of such a massive drive
8Find out how exactly they stand the benefit.
Get a macro outlook of such investments in our Reports section. A ground level, bottom-up view of all such investments is succinctly captured through our project monitoring software. Click on Report for more.
    Details
IOC has plans to raise its refining capacity from 80 to 150 MMTPA
8Get the entire investment profile of the company for the next 5 to 7 years
8What are HPCL's specific capex plans over the next 3 to 5 years?
8BPCL has a full plate of investments on its hands too
8Get a full outline of refinery expansions in India
Click on Reports for more Details
What is the total Indian oil & gas capex for the period 2018-2021?
8Even as RIL's capex begins to decline in the refinery and petrochemical segments, public sector investments pick up speed.
8Ordering in the sector has begun – Engineers India is already sitting on a multi-year high backlog; equipment suppliers and EPC contractors should benefit over the next few quarters.
Click on Reports for more Details
A wave of Chinese crackers -- cumulatively going up to 6930 KTA -- are coming on stream. Get full details here
8The surge is coming from non-state refineries which are now going right down the value chain
8The point to note is that they are putting up world scale capacities. They are decreasing diesel output and manufacturing chemicals instead
8Know more about Chinese ethylene cracker production cost and margins
8Why, unlike in India, propane is the principal cracker feedstock in China? Are there lessons for Indian public sector refineries here? Click on Report for more. Details
Many ethane crackers are also on the drawing boards in China. Get the full list here
8Ethane may be preferred because of lower capital cost and strong ethylene margins.
8Global scaling is possible
8The Chinese however are wary that ethane prices may go up if a fresh lot of ethane crackers come up.
8But the Chinese projections show that ethane cracking will be cost competitive over naphtha cracking.
8How will RIL fare if Chinese ethane capacity actually come on stream. Will ethane prices go up to the extent that margins are hit in RIL?
8How the Chinese behave will be important to watch in terms of its impact on RIL
Click on Reports for more Details
The battle for alternate fuels to power the shipping industry in the face of new regulations that are going to limit sulphur content in bunker fuel to 0.5% seems to be intensifying
8The LNG industry is making a strong pitch to fill in the gap
8But it claims that LNG cannot make a big dent in the business unless there are enabling governmental regulations
Find out more click on Report. Details
Deep Industries may have been blacklisted by its principal client, ONGC, for two years
8But a quantitative analysis seems to show that the company is undervalued as of now on the stock market
8Is this because such analyses do not take into account factors such as blacklisting by a major clinet or has the company been able to diversify both its product range and client base to survive the blacklisting without feeling the pinch?
Click on Reports for more Details
The website carries here a template of a large E&P company aligning its goals with climate change parameters and yet posting positive NPVs in its reporting segments going ahead till 2030 and beyond.
8Climate change risks are delineated and tackled individually.
8Detailed and methodical assumptions are made on oil and gas prices going up to 2040 and different climate change scenarios., including Greenpeace's 1.5 degree assumption, before arriving at its own NPVs.
8The company's climate scenario analysis indicates long-term resilience and value generation in a range of values
8There are lessons here for Indian oil & gas companies
Click on Reports for more Details
Asia is headed for a massive increase in methane emissions
8And it is not just the oil & gas sector contributing to these emissions though there is now evidence that emission levels were under estimated under this category
Methane emissions are also dramatically rising from:
8Agriculture
8Wetlands
8Biomass burning
8Melting permafrost
8A study shows an exponential increase in bacterial emissions.
8There is also more evidence now of a starling bulge in CO2 emissions
8While efforts are being made, Asia's insatiable appetite for energy will keep emission levels above normal for a long time to come
Click on Reports for more Details
Gulf countries are committed to a total investment of $345 billion going ahead and Indian companies can try and get a slice of this pie
8Get a country-wise profile of these investments
8Find project wise updates of these investments
8Country-wise total, planned and committed investment details are given here
Click on Reports for more Details
SSP-Sulphuric Acid & NPK Fertilizer Expansion Project 
8Cost - Rs 75 Crore
8Project Event: RFQ for a contractor is likely to be released in June or July 2018, due to lack of environmental clearance.
Click here for more information
NPK-SSP & Sulphuric Acid Expansion Project      
8Cost - Rs 15 Crore
8Project Event: RFQ for a contractor is likely to be released after environmental clearance and  and that will take a minimum two to three months.
Click here for more information
Ammonia-Urea Annual Maintenance Project
8Cost - Rs 20 Crore
8Project Event: Selection of a registered Maintenance Contractor is currently on
Click here for more information
Details
For reference purposes the website carries here the following tenders:
8Supply of Compressor Spares in refinery Details
8Supply of Liquid Nitrogen in refinery Details
8Supply of Methyl Di Ethanol Amine in refinery Details
8Procurement of GI Fittings and Valves for City Gas Project Details
8Procurement of Domestic Regulators for City Gas Project Details
8Procurement of H-Manifold for Rigs Details
8Procurement of Welding Rectifier for Offshore Drilling Rigs Details
8Annual Rate Contract for Hiring of Diesel fueled Emergency Response Vehicles Details
8Hiring of SAP support services for GAIL Gas Details
8Procurement of Granular Activated Carbon for GPU Details
8Hiring of services for Field Operational Assistance at Captive Power Plant Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Crude oil prices find support in trade talks and Mideast tensions Details
8India's oil import bill to jump by 25 per cent in current fiscal Details
8Oil trader Vitol hurt by profit drop in recovering crude oil market -FT Details
8Glencore did first trade on Shanghai oil futures - Xinhu Futures Details
8China's Sinopec inks first deal to buy oil priced off Shanghai crude futures Details
8BSE Oil & Gas index trades lower; GAIL falls 5% Details
8Gujarat Gas eyes Chennai Market in Ninth Round of City Gas Auctions Details
8Only 350 of Bengaluru’s 73 lakh vehicles run on CNG Details

8Land law to ease way for gas pipeline Details
8After Gujarat Gas, will GSPC exit Mundra LNG? Details
8Oil companies gear up to supply BS-VI fuel to Delhi from April 1 Details
8Indian economy size to double by ’25: Govt Details
8Oil prices rise on Middle East tension, global market recovery Details
8China oil futures launch may threaten primacy of U.S. dollar: UBS Details
8Saudi Aramco ready for IPO in second half of 2018 -CEO Amin Nasser Details
8Pemex signs shale contract with Lewis Energy in northern Mexico Details
8UAE set to become first Arab nation to produce atomic power Details
8Lenders want wilful defaulter tag for Lanco, ABG Shipyard Promoters Details
8Shanghai Crude Oil futures to give Asian buyers room for more arbitrage Details
8SC asks Centre to consider BS-VI fuel in 13 metros from April 2019 Details
8Indian oil refiners are ready for the BS VI leap: Rebecca Liebert, Honeywell UOP Details
8Cove Point LNG terminal feedgas volumes rise as it prepares to receive tanker Details
8Petrol Price in india today rises by 24-25p; Check rates in Delhi, Mumbai, Bengaluru, more Details
8Oil refiners seek govt policy to move more cargo on foreign ships Details
You can also click on Newsclips for more
Details
8Project Name: Renovation, Modernization and Up-gradation of a Thermal Power Station
8Project Cost: 150 crores
8Project Description: The owner is planning to renovate, modernize and upgrade the capacity of a 200 MW thermal power station at its existing location. The capacity of the both the units is going to be upgraded. Moreover, discussions are ongoing for installation of an FGD unit. The company will come out with bids for R&M of both the the units after getting approval from the state government.
8Project Event: RFQs for R&M contractor of both the units are expected by Q2 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: Q1:2019
8Completion Date: Q4:2020
Click here for more information
8Project Name: Thermal Power Station Addition Project
8Project Cost: 140 crores
8Project Description: The owner has started the commercial operation of its 400 MW thermal power station. Further RFQs are expected soon.
8Equipment required will be: elevators, cranes, dozers, scaffolding, piles, among others.
8Project Event: RFQs for township package for the thermal power station are expected by Q2 2018.
8Expenditure Approval: Q3:2016
8RFQ Date: Q2:2018
8Release Date: Q2:2018
8Start Date: Q3:2018
8Completion Date: Q2:2019
Click here for more information
8Project Name: Greenfield Hydroelectric Project
8Project Cost: 1000 crores
8Project Description: The owner's 100 MW greenfield hydroelectric plant is getting hampered due to delay in forest clearance. Further RFQs for civil and infrastructure works are expected soon.
8Equipment required: piping, loader cum excavator, tunnel boring machine, cranes, elevators, scaffolding, boring machine, among others
8Project Event: RFQ for civil and infrastructure package is expected by April 2018, instead of mid March 2018.
8Expenditure Approval: Q1:2018
8RFQ Date: Apr/2018
8Release Date: Q3:2018
8Start Date: Q2:2019
8Completion Date: Q4:2023
Click here for more information
Details
8The owner is planning the installation of a major solar park.
 
8Land acquistion is underway
 
8DPR preparation is pending.
 
8Bid for consultancy services is expected.
 
8Rfs bid is also expected in future.
 Click on details for more information
Details
8When is the Mundra LNG terminal going to be commissioned? Know more click on Report.
8Get a comprehensive roundup of the global LNG industry in the last one month. Click on Report for more.
8The Iranians have little respect for a signed deal, unlike the Saudis, as was evident from the cancellation of its first FLNG deal with Hemla, which the National Iranian Oil Company (NIOC) signed in October 2017. Similarly, the Iranians went back on an LNG deal with India that Iran signed with India, when petroleum minister Mani Shankar Aiyer was the minister. Click on Report for more.
8There is a direct relationship between crude oil volatility and the Indian stock exchanges. Know how this relationship works. Click on Report for more.
8One of India's largest pump manufacturers is breaking new ground. Find out more click on Report. Details
A series of bio-ethanol refineries are coming up in India?
8But has enough due diligence been done on how the technology works and whether, eventually, it will be compatible with the overall fuel matrix in India
8The whole idea of moving to second-generation biofuels has proven to be somewhat of a scientific disaster in the west
8Is India adopting a failed idea?
8The biggest experts in the business are now claiming that bioethanol just is not an ideal component for blending, both for octane as well as for properties.
8Biofuels have been shifting toward other biobased octane enhancers like biobutanol, and in Europe, biobased MTBE and ETBE.
8So is the bio-ethanol market been over hyped by a few technology providers and are they pushing Indian refiners to take more risks than their internal risk mitigation parameters permit?
8Has enough due diligence been really done?
Click on Reports for more Details
When exactly is the demand for petrol and diesel going to slow down and eventually decline following the advent of the electric vehicle?
8Its inevitability is no longer in question, what is in question is when.
8Find out why the data on the decline in demand varies so widely.
8Also know more about why all of these projections can be wide off the market. EV adoption rates have been slower than people expected, but the wildcard for that is, what happens when a government dictates that you have to buy EVs?
8What really is a realistic assumption that a refinery needs to take cognizance of?
8Till when will new refinery capacity expansions going to take place before they stop?
8Are there lessons here for Indian refiners?
Click on Reports for more Details
Saudi Arabia has just signed a deal with Aramco for a $20-billion fully integrated crude-to-chemicals manufacturing complex. It will be based at Yanbu and will process 400,000 b/d of crude oil and include a vacuum gasoil platform with capacity to produce approximately 9 million metric tons per year of chemicals and base oils. It is expected to start operations in 2025.
8Aramco has also signed a three-party joint development agreement with CB&I and Chevron Lummus Global for the development, commercialization, and marketing of crude-to-chemical technologies.
8This is a disruption in the typical relationship that a refiner would have to serving the petrochemical markets.
8We could have a chemical company who may not be back-integrated into refining considering the possibility of going direct oil-to-chemicals without being dependent on naphtha relationships upstream.
8That does have an indirect and a direct impact on how a refiner operates.
Find out more click on Report. Details
8Project Name: Greenfield 2G Bio-Ethanol refinery
8Project Cost: Rs 500 Crore
8Project Description: An owner is planning to construct an ethanol plant based on the DBT-ICT 2G Ethanol technology developed indigenously to produce fuel-grade ethanol per day, primarily from biomass.
8Project Event: RFQ for PFR consultant is expected by June 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date : Q4:2018
8Completion Date : Q4:2021
Click here for more details.

8Project Name: Refinery Maintenance Shutdown Project
8Project Cost: Rs 20 Crore
8Project Description: An owner is going to undertake the shutdown of its unit in May. The shutdown is for 45 days.
8Project Event: RFQ for the contractor is expected by April 2019.
8Expenditure Approval : Q1:2018
8RFQ Date: Apr/2019
8Release Date: May/2019
8Start Date : Q2:2019
8Completion Date : Q3:2019
Click here for more details.

8Project Name: Greenfield LPG Bottling Plant
8Project Cost: Rs 140 Crore
8Project Description: An owner plans to set up an LPG Bottling Plant by installing mounded storage vessels and has run into a slight delay in the selection of PMC contractor has taken place due to land acquisition.
8Project Event: RFQ for Project Management Consultant is expected by May 2018 instead of March 2018.
8Expenditure Approval : Q3:2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date : Q2:2018
8Completion Date : Q2:2020
Click here for more details.
8Business Opportunity for Technology Licensor for a Zero wastage project (Click on Details) Details
New energy efficiency concepts are getting attention from policy makers now
8Among them is a district level cooling project at a cost of Rs 1000 crore which is likely to be underway soon.
8Tri-generation concepts are also being seriously investigated, where gas can play a role
8There is talk of acquisition of district cooling outfits in the west so that they can be learning models for adaptation in India
Click on Reports for more Details
Very large gas carrier freight rates have been on a dramatic decline
8But after plunging below OPEX levels, they have been on the rise but clearly not by enough
8Future projections of fleet strengths come under two scenarios: high and low scrap situations
8Find out where US LPG cargoes are headed now and how they will pan out in the future
8Why are east-west arbitrage volumes increasing?
8What is the VLGC supply-demand and usage ratios going to be going ahead?
8Can LPG be a bunker fuel? Some people think so. Are LPG based ship engines being developed? What is the progress on this front?
8Why is LPG being fronted now as a better option than LNG for the shipping industry?
Click on Reports for more Details
A global terminaling giant into the rental of storage capacity - liquid products, fertilizers, chemical and agrifood products - to oil companies, chemical companies, traders and government agencies is eying India
8The Indian terminal space is complex
8Entry is not easy, as barriers are high
8There exists a few private players.
8Acquisition is one way out
Click on Reports for more Details
Offshore oil fields services orders are projected to continue to decline in 2018. Find out by how much.
8Know more about what is the total offshore oil field services market size and how it is broken up between exploration, development, production and decommissioning segments.
8Also the global breakeven points for different E&P assets categories for crude oil has gone down recently.
8Against current Brent prices, all US shale oil assets are breaking away with margins to spare
Click on Reports for more Details
Upto 5 Key Contacts are available for this project
8 Project Name: Development Drilling Project
8Project Cost: Rs 1000 Crore.
8Project Description: RFQs for promoter's 100 well development drilling plan have been delayed a bit. The TOR for the project has already been granted. The process of hiring an EPC contractor for 1 production installation and the 150 km pipeline laying part is expected to begin soon. RFQ for the Rigs, Blow-Out Controller, Xmas Trees, Cementing, Wireline, Drill Collar etc is expected shortly.
8Project Event: RFQ for EPC contractor for production installation and the pipeline network is expected by May instead of March 2018.
RFQ for hiring services for rigs and equipment is expected by May instead of April 2018.
8Expenditure Approval: Q2/2017
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date: Q4/2018
8Completion Date: Q4/2020
Click here for more details

8 Project Name: Oil Field Development.
8Project Description: Promoter is planning the development of an oil field . The project involves development drilling of 3 oil wells, development of 2 existing wells and laying of an infield pipeline to connect with the nearest production facility (GGS). A requirement for PMC is expected from promoter's end for design and tendering process. Moreover, manpower requirement is also expected shortly. Further RFQs are expected shortly.
8Project Event: RFQ for hiring PMC consultant is expected by May instead of April 2018.
RFQs for manpower services are expected by November 2018.
8Expenditure Approval: Q4/2017
8RFQ Date: May/2018
8Release Date: Jul/2018
8Start Date: Q4/2018
8Completion Date: Q4/2019
Click here for more details
8Project Name: Drilling Field Development
8Project Cost: Rs 1200 crore
8Project Description: The Promoter is planning exploratory drilling of 70 wells in ML Blocks. The Targeted depths of proposed exploratory wells shall be up to 6500 M. The locations are proposed to be drilled by electrical type rigs which will be hired on EPC basis. The equipment required for the project will be casing pipes, drilling pipes, cementing services, drill bits, Xmas Tree and other oilfield chemicals. An EIA consultant has already been hired for the project. Further RFQs are expected shortly.
8Project Event: RFQ for the hiring of rig services is expected by Q3:2018.
RFQs for the equipment and oilfield chemicals are expected by Q3:2018.
8Expenditure Approval: Q3/2016
8RFQ Date: Q3/2018
8Release Date: Q3/2018
8Start Date: June/2019
8Completion Date: Dec/2021
Click here for more details
Details
There should usually not be a relationship between global shipping industry's consumption of bunker fuel with demand for gas in India
8But, perversely enough, there seems to be a big connection
8The competition between gas and liquid fuels for market share in India is likely to get more intensive going ahead
8What are the factors that are going to be at play?
 Click on Details for more Details
For reference purposes the website carries here the following tenders:
8Carrying out Pipeline works including Piggable Headers with allied Civil and Mechanical Works Details
8Supply of Diammonium Phosphate at refinery Details
8ARC for loading and unloading of Catalyst for FCCU at refinery Details
8Procurement of Spare Actuator and Positioner at refinery Details
8Carrying out coat and wrap work in pipelines Details
8Appointment of Consultant for carrying out market study, detailed feasibility study and bid advisory services Details
8Conducting AC Interference Survey in different pipeline sections Details
8Supply of Spares of Gas Turbine Flame Scanner at refinery Details
8Charter Hire of four SRP Surface Units with allied services for a period of two years Details
8Providing the services of Miscellaneous Jobs as and when required basis at PS9 Dumar for a period of one year Details
8Supply of Double Block and Bleed Plug Valves as per specification Details
8Hiring of Internal Audit Support Services for MRPL for the FY 2018-19 Details
You can also click on Tenders for more 
For reference purposes the website carries here the following newsclips:
8Full text: In Mann Ki Baat, Narendra Modi invites suggestions for Mahatma Gandhi’s 150th birth anniversary Details
8ONGC may buy out GAIL in OPaL Details
8Lanka IOC raises retail prices of gasoline and diesel to cut losses Details
8Stakeholders discuss market mechanism under Paris Climate Agreement Details
8Prime Minister Modi to brainstorm on New India-2022 with PSU chiefs Details
8Blocking Saudi nuclear plant opens door to China, US energy secretary says Details
8Agriculture allocation up 39 per cent in Chandigarh, Rs 6,256 cr for free power Details
8Meghalaya government, World Bank ink agreement for Rs 100-crore project Details

8OMCs defer loan amount recovery from Ujjwala beneficiaries for next 6 refills Details
8Be ready to shell out more for using CNG and PNG from April 1 Details
8GST implementation may impact IOC by Rs 4,200 crore Details
8Brent crude oil futures above $70 per barrel on Middle East tension Details
8OMPL, MRPL merger will make Mangaluru a major economic hub Details
8Algeria vows tax reform in energy sector, eyes shale gas cooperation Details
8Shale firms pump up dividends as industry focus on returns grows Details
8New tech may lead to cheaper, greener engines Details
8Sinopec lifts capex after best posting annual profits since 2013 Details
8Japan's Marubeni sells part of its stake in Eagle Ford shale oil assets Details
8Indian economy to grow faster than expected in 2018 Details
8Myanmar, India mull building cross-border oil products pipeline Details
8Gasp for gas: CNG, PNG prices to increase 3-4% from April Details
8Natural gas reserves discovered in Tripura Details
8Kochi-Mangaluru pipeline work to be ready by yr-end Details
8FPIs infuse 8,400 cr in equities so far this month Details
8Lateral buying swells FY18 oil capex to $1.11 trillion till February Details
8Vedanta eyes Electrosteel for value addition, says chairman Navin Agarwal Details
8US grains body wants to supply ethanol for fuel blending Details
8Hiranandani family to invest Rs3,500 crore in oil and gas business Details
8India’s services industries seen propping up capital investment Details
8A $54 trillion miss highlights India’s bond disconnect Details
8Government pushes oil companies to defer loan recovery under free LPG scheme Details
8MRPL to launch BS VI diesel by March 2019 Details
You can also click on Newsclips for more
Details
8Project Name: Procurement of Exciter Set in a Thermal Power Station
8Project Cost: 15 crores
8Project Description: The promoter is planning to procure an exciter set for a 660 MW generator of it's 1000 MW thermal power plant. Approval is awaited after which the procurement team of the owner will come out with bids for the exciter set for a generator.
8Project Event: RFQs for exciter set for a 600 MW generator are expected by Q2 2018.
8Expenditure Approval: Q2:2017
8RFQ Date: Q2:2018
8Release Date: Q2:2018
8Start Date: Q4:2018
8Completion Date: Q3:2019
Click here for more information Details
8Project Name: Greenfield Gas Pipeline Project
8Project Cost: Rs 3500 Crore
8Project Description:  A greenfield pipeline project is in the offing. 
8Project Event: RFQ for the PFR consultant is expected by June 2018.
8Expenditure Approval : Q4:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date : Q1:2019
8Completion Date : Q1:2022
Click here for more details.

8Project Name: Refinery BS-VI Upgradation Project
8Project Cost: Rs 500 Crore
8Project Description: An owner along with EPCM contractor and Licensor is constructing a new FCC gasoline desulphurization unit and while also expanding the DHDT unit at its refinery. Engineering activities are currently on in the project. Further RFQs are now awaited.
8Project Event: RFQ for pipe rerouting work for the sulphur recovery unit is expected by May 2018.
8Expenditure Approval : Q4:2016
8RFQ Date: May/2018
8Release Date: Jun/2018
8Start Date : Q2:2017
8Completion Date: Jun/2019
Click here for more details.

8Project Name: Greenfield POL Terminal Project
8Project Cost: Rs 150 Crore
8Project Description: An owner along with the EPC contractor is planning to construct a POL terminal. RFQ for the equipment is already out.
8Project Event: RFQ for structural and civil work is expected by June 2018.
8Expenditure Approval : Q2:2017
8RFQ Date: Jun/2018
8Release Date: Jul/2018
8Start Date : Q2:2018
8Completion Date : Q2:2020
Click here for more details.

8Project Name: Brownfield POL Terminal
8Project Cost: Rs 20 Crore
8Project Description: An owner is planning to do an installation of additional tankages and other facilities at its Petroleum Storage Terminal.
8Project Event: RFQ for PMC contractor is expected by April 2018
8Expenditure Approval : Q4:2017
8RFQ Date: Apr/2018
8Release Date: May/2018
8Start Date : Q2:2018
8Completion Date : Q3:2019
Click here for more details.
Details
8Expansion of a super-critical thermal power plant is coming ahead.
8Project Name: Supercritical Thermal Power Brownfield Project
8Project Cost: 3000 crores
8Project Description: The promoter is carrying out the clearance activities for a 800 MW super-critical thermal power expansion complex. EC is likely to be elicited in the next 4-5 months. The owner will come out with bids for a civil package and BoP package soon.
8Project Event: RFQs are expected by Q2 2018.
8Expenditure Approval: Q1:2017
8RFQ Date: Q2:2018
8Release Date: Q3:2018
8Start Date: 2020
8Completion Date: 2024
Click here for more information Details
For reference purposes the website carries here the following tenders:
8Carrying out In-line inspection of Sub-sea Pipelines Details
8Inspection of leak clamps installed on the PHBPL Mainline at various leakage pilferage locations Details
8Installation and Commissioning of Multi sensors and Hydrocarbon Detectors Details
8Supply of VAM Field Instrument Spares at refinery Details
8Supply of Pressure Gauges at refinery Details
8Supply of Hydrochloric Acid to refinery Details
8Supply of Pipes to refinery Details
8Hiring of services for Supply, Fabrication and erection of operating platforms for isolation valves in receipt & dispatch lines Details
8Annual Rate Contract of Civil Works for Work Over Rig Operations Details
8Civil Works for Drill Site PDCN AT Padra Area Details
8Transporting Condensate from on Call basis for a period of three years Details
You can also click on Tenders for more 
For reference purposes the website carries here the following Newsclips:
8Global energy demand rose fastest in five years in 2017; CO2 emissions at historic high: IEA Details
8Crude oil price retreats after hitting six-week highs near $70 a barrel Details
8Indian Oil Corporation to mull investing $3.5 billion to expand next fiscal Details
8Vedanta's Rs 1,240 crore Odisha aluminium smelter expansion proposal in final stage Details
8Last date for bidding of 55 oil and gas blocks extended Details
8ADNOC signs Offshore Concessions with CNPC strengthening ties with world's number one oil importing country Details
8Indian Oil considers investing $3.5 bn from April to expand capacity Details
8Crude oil prices edge lower Details

8ONGC Recruitment 2018: Vacancies announced – Apply for jobs at ongc.india.com Details
8Energy demand rebounds to spew record global carbon dioxide emissions Details
8Four CNG filling stations opened in Kochi Details
8PetroChina pays full profit as Oil rally keeps cash churning Details
8Oil India gains after entering into agreement Details
8Delhi Budget: Govt proposes to reduce reliance on fossil fuel based power generation Details
8Oil rises more than 1 pct as Saudi says production curbs could last into 2019 Details
8Saudi Arabia has options if U.S. walks from nuclear power deal: minister Details
8Polish refiner PKN considers building offshore wind energy farm Details
8Oil producer Norway calls in mediator to avert strikes Details
8PetroChina to ramp up oil and gas E&P despite lower Q4 earnings Details
8Drugmaker Novo Nordisk looks to former oil boss to energise M&A Details
8ONGC Mangalore Petrochemicals seeks heavy naphtha in rare move Details
8Top India refiner said to mull investing $3.5 billion to expand Details
8Diesel prices in India today rises by 8 - 9 paisa; Chennai sees most hike Details
8Govt to raise gas price to highest level in 2 yrs Details
8Overtime at LPG bottling plants raises safety concerns in the industry Details
You can also click on Newsclips for more
Details
Single Super Phosphate Fertilizer Greenfield Project  
8Cost - Rs 8 Crore
8Project Description:  A Fertilizer Company is awaiting environmental clearance for its greenfield Single Super Phosphate Fertilizer project with a capacity 120000 MTPA at Dungri in Gujarat. The equipment requirements are Cranes, Hoppers, Feeders, Conveyors, Valves, Grinding Mills, Tanks, Separators, Pumps, ID Fans, Collectors, Generators, Mixers, Dens, Scrubbers, Screens, Elevators, Furnaces, Cyclones, Blowers, Belts, Weighing machines and more
8Project Event: The RFQ for the contractor is likely to be released soon
Click here for more information
Single/Triple Super Phosphate Greenfield Project      
8Cost - Rs 25 Crore
8Project Event: The project is delayed due to lack of fund, RFQ for the contractor is likely to be released in August 2018.
Click here for more information
Sulphuric Acid Expansion Project   
8Cost - Rs 100 Crore
8Project Event: The discussion is ongoing and RFQ for the EPC contractor is likely to be released in May 2018.
Click here for more information 
Details